Charles Jenkins

Training Instructor at Betaris Training
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Liverpool, England, United Kingdom, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Professional Training and Coaching
    • 1 - 100 Employee
    • Training Instructor
      • Sep 2019 - Present

    • Temporary Works Supervisor / Duty Manager
      • Nov 2018 - May 2019

      Supervising 850 yards of New drainage work in to Bed Rock very challenging environment in around the foot print of CP5 drainage works liverpool lime street stations platforms and we completed 200 metres of drainage over a 4 week period over the May Bank Holiday period.

    • Assistant Project Manager
      • May 2018 - Feb 2019

      Planning and overseeing the delivery of Liverpool lime street major remodelling

  • AMEY RAIL LIMITED
    • Piccadily Place Manchester
    • Construction Supervisor
      • Oct 2018 - Mar 2019

      NWEP PHASE 4 & 5 power & distribution HV installation. My Role was to work directly for the CRE and to over see and Audit the HOIF cable route and installation works observing the cable teams installing the cable , sheath testing , pressure testing and jointing the cable safely and correctly in readiness for the Procedure for the entry into Operational Service of the rail infrastructure. Finished off the final quality and assurance and snagging works in and around 5 transformer stations Euxton,Blackrod ,Lostock , Ordsall and Clifton until the commissioning commenced. Show less

    • United Kingdom
    • Railroad Equipment Manufacturing
    • 700 & Above Employee
    • Health And Safety Advisor
      • Dec 2017 - Mar 2018

      In my Role as Health and Safely Advisor my main duty was to ensure Safety procedures was adhered to during any work activity. OLE , drainage and sleeper installations . O Observe and identify areas for continuous improvement and promptly respond to all incidents on site and liaising with site staff. Safety Audits , Saftey Interventions , Safety presentations and Tool box talks. Must say I was very popular on site. In my Role as Health and Safely Advisor my main duty was to ensure Safety procedures was adhered to during any work activity. OLE , drainage and sleeper installations . O Observe and identify areas for continuous improvement and promptly respond to all incidents on site and liaising with site staff. Safety Audits , Saftey Interventions , Safety presentations and Tool box talks. Must say I was very popular on site.

    • Principal Contractor Representitive / Project Scheme Manager
      • Jun 2017 - Dec 2017

      PC Rep - over seeing multi Works night & day Bolton Station Remodelling And Ashton Station remodelling and track & drainage Renewals that project had to be the most Toxic work environment I’ve ever worked on the no wonder that project over run by two years, so bad I took a gamble and jumped on to a temporary opportunity with Volker Rail.

    • Principle Contractor Representitive
      • Oct 2015 - Jun 2017

      Duty Mansger night to day site front line operations of third- party contractors and clients via close collaboration Amey , NWR Siemens , BamSkanska. With over 2000 members and over 5000 inductions briefed out. I identified s need for skills improvement and conducted training sessions , safety Audits and CDM for newly hired staff to improve overall efficiency.

    • United Kingdom
    • Civil Engineering
    • 700 & Above Employee
    • Handback Engineer
      • Nov 2014 - Mar 2015

      Drainage installation works pre NWEP Drainage installation works pre NWEP

    • United Kingdom
    • Retail Office Equipment
    • Site Superintendent
      • Sep 2012 - Mar 2014

      Managed and planned delivered & Supervised full hands on 100 plus Foreign nationals for an initial Wooden sleeper replacement contract. Fulfilled high service level agreements and contractual obligations including on time completion of all Project Installations while attaining a very challenging environment and Customer. Planned delivered streamlined the Project as it evolved. Trained Raw talent into Competent Track Operatives. Installed 5500 wooden sleepers and assisted in the installation of 1765 turnout bearers on the busy Singapore Elevated Mass Rail Transit by hand no RRVs. Implemented Health & Safety interventions in very challenging Working conditions tropical Weather permitting. Installed 160 turnouts during SMRTs replacement term contracts of QK12-11 and QXW12-022 . Maintained work Quality and 100% safely records with Zero accidents or incidents in Project Execution. Show less

    • Senior infrastructure Technician
      • Apr 2005 - Aug 2010

      Began as infrastructure Technician on over Renewals Division based in Hooton foot print covered as far Cumbria , Angellsey , Stafford TV 4 , Mersey Rail , Northwest main line , Crewe . Under took Safety Critical duties , Coss which I still hold , HS , PC , Po, LXA , MC ,MM , ES , went on to the third Rail gang SM and Supervisor , patrolling , CTR snd Raising & Removing Speed Restrictions on over s 100 Renewalls Began as infrastructure Technician on over Renewals Division based in Hooton foot print covered as far Cumbria , Angellsey , Stafford TV 4 , Mersey Rail , Northwest main line , Crewe . Under took Safety Critical duties , Coss which I still hold , HS , PC , Po, LXA , MC ,MM , ES , went on to the third Rail gang SM and Supervisor , patrolling , CTR snd Raising & Removing Speed Restrictions on over s 100 Renewalls

Education

  • Netherley Comprehensive

Community

You need to have a working account to view this content. Click here to join now