Chandrasekar Jagadeeshwaran

QHSE Engineer at MASSAED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Mechanical Or Industrial Engineering
    • 100 - 200 Employee
    • QHSE Engineer
      • Feb 2015 - Present

      • Quality Inspection of newly installed elevators. • Ensure that all “assessments” as required by legislation are conducted and reviewed at relevant intervals and to maintain records of the same. • To recommend control measures and advise on the standard of P.P.E. issued to employees. • Conduct health and safety inspections and prepare reports of all the company’s operations. • To carry out investigations into all accidents and near-miss incidents and to record the findings on the relevant forms. • To set a personal example by wearing appropriate personal protective clothing/equipment and observing all safety requirements/procedures. Show less

    • Public Safety
    • 1 - 100 Employee
    • Inspection Engineer
      • Jul 2012 - Aug 2014

      • Inspection of elevators and escalators. • Inspection of Electrical panels through thermography camera (SMDB, DB, MDB & ETC.,) • Portable appliance testing, • Inspection of Lightening protection and Building Earth. • Inspection of cranes, Earth Moving equipment’s, Lifting gears(Chain block, Shackles, Lifting belts and etc.,) • Inspection of elevators and escalators. • Inspection of Electrical panels through thermography camera (SMDB, DB, MDB & ETC.,) • Portable appliance testing, • Inspection of Lightening protection and Building Earth. • Inspection of cranes, Earth Moving equipment’s, Lifting gears(Chain block, Shackles, Lifting belts and etc.,)

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Graduate Engineering Trainee
      • Aug 2011 - May 2012

      • Installation of 132kv switchyard, • Installation of 11kv switchgear panel, • Battery installation and commissioning, • Installation of transformer and unloading GT and UT, • Cable laying, cable tray and cable termination, • Installation of 132kv switchyard, • Installation of 11kv switchgear panel, • Battery installation and commissioning, • Installation of transformer and unloading GT and UT, • Cable laying, cable tray and cable termination,

Education

  • Shanmugha Arts, Science, Technology and Research Academy
    Electrical and Electronics Engineering
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now