Chandra Verina Darmastuti
Operation Support at Exclusive Networks Indonesia- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Exclusive Networks Indonesia
-
IT Services and IT Consulting
-
1 - 100 Employee
-
Operation Support
-
Sep 2021 - Present
-
-
-
SICEPAT EKSPRES INDONESIA
-
Indonesia
-
Freight and Package Transportation
-
700 & Above Employee
-
Special Service for E-Commerce Staff
-
Feb 2021 - Aug 2021
-
-
-
IKPT
-
Indonesia
-
Construction
-
700 & Above Employee
-
General Affair Staff
-
Dec 2018 - Aug 2020
» Implement the service function in the Home Office. » Supervise the activity of Cleaning Service and Office Boy, Pest Control Program, Procurement of Chemical Fregnances Room, also Procurement of services and materials Digital Copy Machine. » Recording, Numbering, Labelling, and Controlling Asset, Inventory and Surplus Material in Home Office. » Register and reporting the activity of in-out of the Assets or other goods in the Home Office. » Create periodic report Asset especially in Home Office. » Record the borrowing of assets and Inventory for Project or other party. » Stock Opname Asset & Inventory once a year. » Make a report of toll and parking expenses. » Registration of employee’s vehicle » Make a daily report of parking income. Show less
-
-
-
Tower Bersama Group
-
Indonesia
-
Telecommunications
-
700 & Above Employee
-
Asset Project Closing (Internship)
-
Jul 2017 - May 2018
» Ensure the implementation of retaining tower can be done through the process of the provision of document called BAUK (Berita Acara Uji Kelayakan) document. » Make sure all documents are complete for upload RFI (Ready For Instalation) to the TBIG System. » Closing the Project to support of the availability of the site can do Colocation with emphasis on occupational health and safety as well as consider the environmental policy based on SOP and SLA have set. » Ensure the implementation of retaining tower can be done through the process of the provision of document called BAUK (Berita Acara Uji Kelayakan) document. » Make sure all documents are complete for upload RFI (Ready For Instalation) to the TBIG System. » Closing the Project to support of the availability of the site can do Colocation with emphasis on occupational health and safety as well as consider the environmental policy based on SOP and SLA have set.
-
-
Education
-
Politeknik Negeri Bandung
Sarjana Terapan Manajemen, Asset Management