Chad Pruehs

Electrical Project Manager at Miller Electric Company of Omaha
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Lincoln, Nebraska, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 100 - 200 Employee
    • Electrical Project Manager
      • Dec 2017 - Present

      • Supervised the completion of two $250 million data centers in Council Bluffs area • Assisted in managing and maintaining project budgets • Performed take-offs for building materials, acquired quotes from vendors, and prepared purchase orders • Ensured conformity to building plans and design layouts while maintaining safe and productive construction sites • Prepared cost summaries for projects, including equipment, labor, materials, site preparation, sub-contractor costs, and other related costs • Managed construction plans and maintained current project status records • Ensured as-builts, operation and maintenance manuals, and equipment warranties were completed in accordance with the owner requirements • Interpreted and explained plans and contract terms to administrative staff, workers, and subcontractors • Designed and drafted server room floor layouts for each building based on power requirements • Created and maintained extensive project labor hours tracker for both buildings Show less

    • United States
    • Construction
    • Project Manager
      • Dec 2016 - Dec 2017

      • Managed group of 10 heavy equipment operators • Assisted in maintaining and balancing project budget • Used engineering skills/mindset to solve project related issues • Worked closely with job site project manager and contractors on various job-related projects • Operated heavy machinery and helped out mechanics as needed to facilitate progress • Managed group of 10 heavy equipment operators • Assisted in maintaining and balancing project budget • Used engineering skills/mindset to solve project related issues • Worked closely with job site project manager and contractors on various job-related projects • Operated heavy machinery and helped out mechanics as needed to facilitate progress

    • Process Engineer
      • Dec 2015 - Dec 2016

      • Managed maintenance and contractor crews to make sure projects were getting completed safely and on time • Balanced many different process optimization projects with day-to-day business and maintenance • Put together $335,000 cooling tower replacement project • Ordered parts and tools as requested by hourly employees; verified delivery content when they arrived • Drew up different process flows and machine designs in AutoCAD • Maintained shutdown project lists and kept them up to date • Created standard operating procedures, lockout procedures, and trends for the machines in the process • Trained new employees on different machines and duties required by their position • Filled in as needed on maintenance and utility crew when they were short-staffed in order to get projects done Show less

    • Netherlands
    • Chemical Manufacturing
    • 700 & Above Employee
    • Laboratory Technician
      • May 2014 - Aug 2014

      • Tested numerous paint coatings to make sure they were up to code • Operated many different types of lab equipment • Tested numerous paint coatings to make sure they were up to code • Operated many different types of lab equipment

    • United States
    • Environmental Services
    • 1 - 100 Employee
    • Process Engineering Intern
      • Mar 2014 - May 2014

      • Drew up process flow diagrams for various manufacturing plants • Input process flow diagrams into AutoCAD • Created technical reports for customers detailing services performed at the plant. • Drew up process flow diagrams for various manufacturing plants • Input process flow diagrams into AutoCAD • Created technical reports for customers detailing services performed at the plant.

    • Germany
    • Food and Beverage Manufacturing
    • 700 & Above Employee
    • Chemical Engineering Intern
      • May 2013 - Aug 2013

      • Managed various factory infrastructure and process improvement projects • Conducted water content tests on final product to optimize the feed rate, facilitating the process • Calibrated pH probes on daily basis • Performed dicalcium phosphate tests on waste streams from process • Created computer program to type up procedures for shutting down certain machines • Tested pork skins from suppliers for fat content • Managed various factory infrastructure and process improvement projects • Conducted water content tests on final product to optimize the feed rate, facilitating the process • Calibrated pH probes on daily basis • Performed dicalcium phosphate tests on waste streams from process • Created computer program to type up procedures for shutting down certain machines • Tested pork skins from suppliers for fat content

    • United States
    • Higher Education
    • Installation Crew Supervisor
      • May 2008 - Aug 2012

      • Supervised crew of ten employees • Serviced and installed underground sprinklers • Excellent working knowledge of pumps, plumbing, wiring, and other irrigation tools • Supervised crew of ten employees • Serviced and installed underground sprinklers • Excellent working knowledge of pumps, plumbing, wiring, and other irrigation tools

Education

  • University of Nebraska-Lincoln
    Bachelor of Engineering (B.E.), Chemical Engineering
    2011 - 2015

Community

You need to have a working account to view this content. Click here to join now