Experience
-
Soyak Holding A.Ş.
-
Türkiye
-
Construction
-
1 - 100 Employee
-
Project & Business Development Engineer
-
Jul 2021 - Present
• Management, follow-up and communication processes of the EIA, Transmission line connection opinion and Urban planning applications of renewable wind energy investment projects which are total 150 MW out of 3 equally 50 MW in the country of North Macedonia as of July 2021• Examining the relevant laws and regulations of the project works in the investment process in North Macedonia, preparing and following the work schedule• Establishing the budget, cash flow and feasibility of the project works in the investment process in North Macedonia• Preparation or arrangement of contracts for project work in the investment process in North Macedonia• Representing the company during the meetings with local authorities, companies and representatives Show less
-
-
Operation & Maintenance Engineer
-
Oct 2019 - Jul 2021
• Ensuring the continuity of the operation by establishing periodic maintenance and following control forms (daily, weekly, monthly and yearly) in the Mis-3 Geothermal Power Plant operation project commissioned in October 2019,• Assigning the works to the team members following shift and maintenance, • Preparing and applying the procedures of preventive, predictive, and corrective maintenance works to minimize the failures and losses.• Preparing for the scheduled maintenance with stopping the plant, deciding to works, and the required workers & vehicles following scheduling the time.• Deciding & purchasing the spare parts of the ORC and BOP system to minimize the stopping time of the plant in case of unexpected failures. Show less
-
-
Mechanical Engineer
-
Mar 2018 - Oct 2019
• Taking part in the Mis-3 Geothermal Power Plant investment project commissioned in October 2019 and to lead the team responsible for mechanical welding, assembly, insulation works and mechanical purchasing for the plant, wells, and pipelines,• Preparing the contracts, examining the technical specifications, to follow up progress and budget estimation-progress payments of the field project related works,• Communicating with the international company (ORMAT) that manufactures the main equipment of the power plant (Turbine, generator, ORC equipment, etc.), examining the projects coming from this company, evaluating with the related persons, checking their accounts and making a comeback for project follow-up,• Taking part in the Mis-3 Geothermal Power Plant start-up commissioning and provisional acceptance process in October 2019, and analyzing after reading and evaluating the operation regime of the plant. Show less
-
-
Project Engineer
-
Feb 2018 - Oct 2018
• Communicating with the international company (ORMAT) that manufactures the main equipment of the power plant (Turbine, generator, ORC equipment, etc.), examining the projects coming from this company, evaluating with the related persons, checking their accounts and making a comeback for project follow-up,• Reporting & analyzing after reading and evaluating the operation regime of the plant.
-
-
-
Vestel
-
Türkiye
-
Computers and Electronics Manufacturing
-
700 & Above Employee
-
Mechanical System Design Engineer
-
Jan 2017 - Jan 2018
• Designing calculations including advanced fluid mechanics, component design and analysis, working parameters and design of closed systems, simulations, test plan and follow-up, acoustics, vibration and benchmark follow-up. • In the tumble dryer project, following the work of the system design group, which is responsible for the system's most critical task, directing the flow and collecting the moist in laundry, making the parts design, simulation and analysis, the test plan and follow-up • In addition, I am responsible system development studies, acoustics, vibration and following benchmarks in the R & D department. Show less
-
-
-
Eczacıbaşı Yapı Gereçleri / VitrA İnnovasyon Merkezi
-
Eskisehir, Turkey
-
Intern
-
Aug 2015 - Sep 2015
• Analyzed the modelling of Sanitaryware Products, Faucets and Concealed Cisterns • Appeared in weekly meetings where departments discussed progresses • Tasked with preparing a report of cost and possible failure points for a pre-designed concealed cisterns which may be helpful in a processing work. • Analyzed the modelling of Sanitaryware Products, Faucets and Concealed Cisterns • Appeared in weekly meetings where departments discussed progresses • Tasked with preparing a report of cost and possible failure points for a pre-designed concealed cisterns which may be helpful in a processing work.
-
-
-
Mayplast Plastik Ambalaj ve Kalıp Sanayi Tic. Ltd. Şti.
-
Istanbul, Turkey
-
Intern
-
Aug 2014 - Sep 2014
• Highly involved with plastic injection and manufacturing processes • Getting more familiar with designing process by learning from the related mechanical engineer • Highly involved with plastic injection and manufacturing processes • Getting more familiar with designing process by learning from the related mechanical engineer
-
-
-
Arsan Enerji Ve İnşaat A.Ş.
-
Istanbul, Turkey
-
Intern
-
Jun 2013 - Jul 2013
• Performing feasibilty studies for renewable energy sources and industrial plants, project development and evaluating the investment processes • Performing feasibilty studies for renewable energy sources and industrial plants, project development and evaluating the investment processes
-
-