Cash Prediger

Engineering Lab Technician at Red Deer College
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Canada
    • Higher Education
    • 400 - 500 Employee
    • Engineering Lab Technician
      • Jul 2019 - Present

    • Canada
    • Construction
    • 1 - 100 Employee
    • Co-Owner at Power-Link Technologies ( Electrical Services)
      • 2018 - Jul 2020

      Master-Electrician , Red Seal Journeyman Instrumentation Control Technician with Power-Link Technologies Experienced in small to large electrical projects. Light Industrial, Commercial, residential electrical projects. Installation of security camera systems and alarm systems. Master-Electrician , Red Seal Journeyman Instrumentation Control Technician with Power-Link Technologies Experienced in small to large electrical projects. Light Industrial, Commercial, residential electrical projects. Installation of security camera systems and alarm systems.

    • Ireland
    • Oil and Gas
    • 700 & Above Employee
    • Master Electrician, Fourth Year Instrumentation Control Technician
      • Nov 2013 - Apr 2018

      Master Electrician Production Optimization, VFD Technician, Hydraulic and Plunger Lift Technician • Certified Master Electrician-Red Seal Journeyman Electrician and Fourth year Instrumentation Apprentice with over ten years of professional experience specializing in industrial, commercial, and oilfield • Programmed and performed maintenance on Variable Frequency Drives (VFDs) • Provided technical support and job satisfaction for clients and sales team ( VFD’s and Generators ) • Installed and calibrated process controls including transmitters, transducers, limit switches, flow meters • Assisted the Engineering team on designs and PLC programming • Diagnosed and repaired VFDs in field and shop (capacitors, input diodes, transistors, braking transistors, DSP boards, control relays, and main gate driver boards) • Diagnosed problems with communication devices such as modems and RTU panels • Coordinated with software team on development and deployment of SCADA application • Signed off and ensured all products and equipment met quality control specifications • A Kaizen philosophy of continuous and relentless drive for improvement • Strong technical knowledge of oil well optimization services • Innovative personality and curious mind. Enjoys the challenges of diagnosing and solving problems • Team oriented leader supervising and mentoring up to six apprentices and coworkers • Coordinated with sales team to build quotes and invoices • Experienced in Operations maintenance of oilfield instrumentation • Specialist in artificial lift equipment (conventional pumping units, progressive cavity pumps) • VFD and automation control systems Show less

    • Canada
    • Oil and Gas
    • 300 - 400 Employee
    • Journeyman Electrician
      • Nov 2011 - Nov 2013

      General maintenance ( electrical and Instrumentation). Construction Electrical Foreman • Lead and organized full time crew of eight to ten • Preventative maintenance and maintenance management systems • Tested safety devices, H2S and LEL calibrations, tank level transmitters and switches • Installed and calibrated pressure transmitters and switches • Installed and diagnosed VFDs, PLCs, controllers, and motors • Installed solar panels and batteries for remote locations • Maintenance and installed 4160 v Motors and MCC Show less

    • Canada
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Apprentice- Journeyman Electrician
      • Jul 2006 - Nov 2011

      • Completed electrical apprenticeship • Installed wet well sewage lift stations • Installed conduit, cable tray, grounding and bonding, electrical panel distribution, motors, and executed associated control wiring • Completed electrical apprenticeship • Installed wet well sewage lift stations • Installed conduit, cable tray, grounding and bonding, electrical panel distribution, motors, and executed associated control wiring

Education

  • Red Deer College
    Instrumentation Technology/Technician
    2016 - 2018
  • Lakeland College Canada
    Electrician
    2007 - 2010

Community

You need to have a working account to view this content. Click here to join now