Carlos Mendez
Manufacturing Engineer II at Greene Tweed- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Greene Tweed
-
United States
-
Manufacturing
-
700 & Above Employee
-
Manufacturing Engineer II
-
May 2022 - Present
-
-
-
Visionworks of America
-
United States
-
Retail
-
700 & Above Employee
-
Engineering Project Manager
-
Apr 2021 - May 2022
• Created a new Production line to bring in new optical business from an online platform ($800K in saving) • Heavy involvement with supply chain and material flow to bring in a $4.5 million machinery for automatic kitting of lenses. • Created CBA’s (Cost-Benefit Analysis), for the projects mentioned above future savings to the company of over $4 million dollars • Heavy involvement with the production team and fulfillment centers to optimize processes and define work instructions. • Constant presentations created and presented to stakeholders for process improvement projects. Show less
-
-
-
-
Production Manager
-
May 2019 - May 2021
• Managed production area with 2 direct supervisors and over 100 labor operators. • Led installation of 2 brand new production lines with no impact to customer, line averaged a 95% efficiency within a month. • Analyzed production for improvement potentials and introduced 2 major projects with over $200K in annual savings • Managed production team to meet targets on Key Process Indicators including Safety, Quality, Production, Cost • Coordinate implementation of new products to assembly line, including headcount planning and detailed production plans. • Train and developed team leaders and supervisors, during those 2 years, 3 team leads became supervisors. Show less
-
-
-
Avanzar Interior Technologies
-
San Antonio, Texas
-
Manufacturing Engineer
-
Aug 2017 - May 2019
• Developed an assembly line to accommodate a new seat model, line efficiency was over 95% on launch date with no impact. • Determined plant utilities and worked with outside contractors for building modifications and new assembly lines installations. • Implemented a new kitting process for 2 assembly lines, which resulted in $200K annual savings. • Maintained PFMEA’s, Process Flow Diagrams, work instructions, Start-up sheets, and several other controlled documents. • Installed 2 steaming robots which saved the company $200K annual savings. Show less
-
-
-
-
Continuous Improvement Coordinator
-
May 2015 - May 2017
• Completed several projects with a total sum of $1.7M dollars in savings. • Created Value Stream Maps for 8 assembly lines and used lean principles to improve material replenishment. • Material Replenishment and Storage Analysis, examples include an entire warehouse configuration to reduce footprint, 1000 sqft • Used six sigma principles and completed a 2 major projects for my BB certification with annual savings of $208K. • Problem solving techniques ( Kepter Tregoe, 5 Why’s, Ishikawa etc.) Show less
-
-
Education
-
The University of Texas at San Antonio
Master of Business Administration - MBA, Finance -
The University of Texas at San Antonio
Bachelor's degree, Mechanical Engineering