CARLOS FALU ஃ
Project Manager Engineer at Chevron Phillips Chemical Company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Spanish Native or bilingual proficiency
Topline Score
Bio
Figueroa Jose
Excellent Supervisor
Figueroa Jose
Excellent Supervisor
Figueroa Jose
Excellent Supervisor
Figueroa Jose
Excellent Supervisor
Credentials
-
PE
PUERTO RICO STATE DEPARTMENTOct, 2014- Nov, 2024
Experience
-
Chevron Phillips Chemical Company
-
United States
-
Chemical Manufacturing
-
700 & Above Employee
-
Project Manager Engineer
-
Oct 2019 - Present
-
-
-
Huntsman Corporation
-
United States
-
Chemical Manufacturing
-
700 & Above Employee
-
Sr Project Manager/Engineer
-
May 2018 - Oct 2019
-
-
-
Lucite International
-
United Kingdom
-
Chemical Manufacturing
-
300 - 400 Employee
-
Senior Project Manager/Engineer
-
Mar 2014 - Mar 2018
Project management from initial conception to project closure. Make cost estimates, time schedules and work scope. Design and select process equipment. Contractor selection and supervision. Project budget management. Assistance to the capital program and phasing. Technical assistance to other departments. Equipment selection and specifications. Factory Acceptance Test to equipment. Projects include: Oleum Tower refurbish, Natural Gas line Refurbish, Vent Gas KO pot replacement, Primary Scrubber Tank replacement, Monomer Condensate Tank replacement, SAR Compressor/Turbine refurbish, Start Up Fan Refurbish, Seal Gland Condenser replacement, Waste Heat Boiler retubing, Second Amide Cooler Bundle replacement, Clarifier #3 New Agitator assembly replacement, Drying Tower Refurbish, South Packed Tower Refurbish, North Waste Heat Boilers Hot & Cold Pass Replacement. Show less
-
-
-
Baxter International Inc.
-
United States
-
Medical Equipment Manufacturing
-
700 & Above Employee
-
Maintenance Supervisor
-
Apr 2011 - Feb 2014
In charge of all maintenane for the Production Building of SEVOFLURANE, Environmental Operations Area, Utilities and Tank Farm, supervision of the maintenance personnel and some projects In charge of all maintenane for the Production Building of SEVOFLURANE, Environmental Operations Area, Utilities and Tank Farm, supervision of the maintenance personnel and some projects
-
-
-
Fenwal, Inc., a Fresenius Kabi Company
-
United States
-
Medical Equipment Manufacturing
-
700 & Above Employee
-
Utilities Maintenance Supervisor(Contract)
-
May 2010 - Apr 2011
Utilities operations and maintenance, Special Projects Wet Production Building Roof Refurbish, Plant production rooms refurbish. Utilities operations and maintenance, Special Projects Wet Production Building Roof Refurbish, Plant production rooms refurbish.
-
-
-
Essilor Group
-
France
-
Medical Equipment Manufacturing
-
700 & Above Employee
-
Maintenance Engineer(Contract)
-
Aug 2009 - Mar 2010
Intex Machine maintenance and improvements, general maintenance. Intex Machine maintenance and improvements, general maintenance.
-
-
-
Eli Lilly and Company
-
United States
-
Pharmaceutical Manufacturing
-
700 & Above Employee
-
Senior Project Manager/Engineer
-
Jun 2005 - Jul 2009
Responsibilities include: Project management from initial conception to project closure. Make cost estimates, time schedules and work scope. Design and select process equipment. Contractor selection and supervision. Project budget management. Assistance to the capital program and phasing. Technical assistance to other departments. Equipment selection and specifications. Factory Acceptance Test to equipment. Projects include: Construction Engineer for the Duloxetine Expansion Project PR06 Phase I and II, Construction Engineer for the Solvent Recovery Modules and Ozone Decomposition Unit. Project Engineer for Special Security Subtances-Taladafil Project(CCTV & Access Control), Maintenance Bathroom Remodeling, Lift Station line upgrade, WWTP reuse at the Cooling Towers. Warehouse Expansion(receiving area), Cafeteria Expansion Construction Phase. Production Personnel Office Trailers, Economizer for Boiler #3, 24Inch Floor Drain Valves, Sanitary Line to WWTP, Condensate Return Project. Show less
-
-
-
AstraZeneca
-
United Kingdom
-
Pharmaceutical Manufacturing
-
700 & Above Employee
-
Senior Project Manager/Engineer
-
Oct 2000 - May 2005
Responsibilities include: Project management from initial conception to project closure. Make cost estimates, time schedules and work scope. Design and select process equipment. Contractor selection and supervision. Project budget management. Assistance to the capital program and phasing. Technical assistance to other departments. Projects include: Tank for Well Water, Circuit Setters for Utilities, Pressure Regulator valves for tank farm, Pneumatic Hammers for dryer, Utilities Access Road Upgrade, Heat Exchanger Upgrades, Strainers for Fire Deluge System, Storm Water Channels Upgrade, Plant Access Roads, and Parking Repavement, Administration Building Lobby upgrade, Humidifier for Stability/Environmental Room, HVAC for Computer Room, and Fume Hoods for Laboratory. Procedures development and revision, including SOP and CI. Show less
-
-
-
-
Senior Project Manager/Engineer
-
Aug 1994 - Oct 2000
Responsibilities include: Project Development, from design to implementation. Also includes cost estimates for capital projects, contractor supervision , equipment specification, project planning and technical assistance to other departments. Important projects include fire sprinkler system for process compressors, spheres and spheroids, Floating roof for storage tanks, Instrument Air Dryer (3000 cfm), Zeolite Softeners for Boiler Feed Water, Air Cooled Heat Exchangers, Fabrication of Convection Section (Process Heater) and New Office Building (Corporate Engineering Liaison). Other works include piping, control valves, safety valves, instrumentation, etc. Show less
-
-
-
-
Mechanical Engineer Assistant
-
Jun 1993 - Aug 1993
included: Analysis of the chilled water system. The task included updating P&ID, Chillers performance, Heat Load, Water Treatment and recommendations for improvement. included: Analysis of the chilled water system. The task included updating P&ID, Chillers performance, Heat Load, Water Treatment and recommendations for improvement.
-
-
Education
-
University of Puerto Rico-Mayaguez
B.S Mechanical Engineering