Carlos Marcel Acosta González
Project Manager at CLH- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English (fluently) Full professional proficiency
-
German (basic) Limited working proficiency
-
Español Native or bilingual proficiency
Topline Score
Bio
Credentials
-
BIM Execution Plan (BEP)
LinkedInSep, 2020- Nov, 2024 -
Cultivating a Growth Mindset
LinkedInSep, 2020- Nov, 2024 -
Project Management Professional (PMP)
PMI Madrid, SpainOct, 2017- Nov, 2024
Experience
-
CLH
-
Spain
-
Oil and Gas
-
200 - 300 Employee
-
Project Manager
-
Feb 2012 - Present
The main projects led are:★ Leading the engineering technical staff office to oversee that the detail engineering meets the standards and policies of CLH in the Project of a new oil storage Terminal in Central Mexico.Project stage: FEED/Detail engineeringClient: CLH S.ACountry: MéxicoYear: 2019★Project Manager/ Project: A new blending system in the Castellón hydrocarbon storage terminal to mix two streams to fabricate Biodiesel and Gasoline of 95 octane. Project stage: executed Client: BP Refinery Country: Castellón/SpainYears: 2018-2019★ Project Manager/ Project: Revamping the Huelva´s oil storage terminal as a new logistic maritime hub.The revamp of the CLH oil storage facility in Huelva with the latest state of the art loading technology in order to satisfy the demand of our clients such as Cepsa, Mercuria among others to pump a range of 5 different oil final products to load oiltankers to the african marketProject stage: executedClient: Cepsa RefineryCountry: Huelva, SpainYears: 2014-2017
-
-
Project&Construction Engineer
-
Jun 2007 - Feb 2012
-Assisting Project Managers to coordinate a multi-skilled project team in the reviewing process of technical documents.-Essuring that construction projects for new oil storage farms meet national regulations, best practices from international standards and fulfilling the CLH´s standards.-Designing P&I diagrams, piping and equipment arrangement-Reviewing and approving tender documents from engineering firms for civil works, atmospheric tank construction according to API650, piping assembly and equipment installation and I&E.-Creating instrument and lines list, selecting contol valve, identifying and designing control loops.Taking part in the HAZOP´s Analysis and the SIL design.-Designing the Safety Instrumented System (SIS) of the projected facilities according to IEC-61508/61511.Supervising all the mechanical aspects during the construction stage.-Validating project deliverables and obtaining internal customer´s acceptances.
-
-
-
GEESINKNORBA
-
Netherlands
-
Automotive
-
100 - 200 Employee
-
After-sales Service Engineer
-
Feb 2007 - Jun 2007
o Developed training courses to teach the functionality of the products sold to the customer maintenance team as well as troubleshooting training. o Decreased branch losses by 20% in the process of assuming defective part warranty claims from the headquarters in Sweden and Holland. o Reduced the repair time of common failures by almost half thanks to rapid troubleshooting diagnostics through the PLC via modem. o Developed training courses to teach the functionality of the products sold to the customer maintenance team as well as troubleshooting training. o Decreased branch losses by 20% in the process of assuming defective part warranty claims from the headquarters in Sweden and Holland. o Reduced the repair time of common failures by almost half thanks to rapid troubleshooting diagnostics through the PLC via modem.
-
-
-
Groupe PSA
-
France
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Production Shift Manager
-
Nov 2005 - Feb 2007
Groupe PSA is the second largest car manufacturer in Europe o Ensured day-to-day output complied with quantity and quality specifications by supervising the correct application of company standards and safety guidelines. o Managed the Auto-body assembly line of the Peugeot 207 cc and fostered a positive and cooperative working environment, coordinating a team of 25 to 40 workers. Groupe PSA is the second largest car manufacturer in Europe o Ensured day-to-day output complied with quantity and quality specifications by supervising the correct application of company standards and safety guidelines. o Managed the Auto-body assembly line of the Peugeot 207 cc and fostered a positive and cooperative working environment, coordinating a team of 25 to 40 workers.
-
-
-
Industrias Corpañal
-
Manufacturing
-
1 - 100 Employee
-
Project Engineer
-
Jun 2001 - Apr 2003
Industrias Corpañal C.A. is a Latin American consumer goods company formed by more than 650 direct employees. Leading Manufacturing Company in personal care products such as: Baby diapers, cosmetics, wet wipes, fem care products, adult diapers, cottons, among others o Designed new mechanical units which allowed the sale of a new product, the night pad, as part of my final degree thesis. o Improved existing operations, incorporating new changes in the production line in order to reduce the changeovers, applying SMED techniques. o Collaborated with other team members, identifying ways to reduce production costs, managed budgets and worked alongside engineering and other departments to produce cost forecasts for new designs.
-
-
Education
-
ISA Sección Española
Master in Process Control and Instrumentation -
Universitat Politècnica de Catalunya
MASTER'S DEGREE IN ORGANIZATION AND ENGINEERING OF PRODUCTION AND MANAGEMENT OF INDUSTRIAL PLANTS, LEAN MANUFACTURING -
Universidad de Zaragoza
Diploma in Piping Design, DISEÑO DE TUBERIAS -
Universidad de Vigo
MSc in Safety, PRL -
Universidad Metropolitana (VE)
Mechanical Engineer, Mechanical Engineering -
OMMA Business School Madrid
Programa Ejecutivo de Value Investing, Inversiones y títulos valores