Carlos Acero Caballero
Electronic Engineering Coordinator at Genser Power- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Spanish Native or bilingual proficiency
-
German Elementary proficiency
-
French Elementary proficiency
Topline Score
Bio
Credentials
-
Functional Safety Engineer
TÜV SudMay, 2011- Nov, 2024
Experience
-
Genser Power
-
Oil and Gas
-
100 - 200 Employee
-
Electronic Engineering Coordinator
-
Oct 2019 - Present
Responsibilities - Coordination of Engineering activities in the control, instrumentation and communication areas of the company, both in projects and prospects of Electrical generation. - Dimensioning and general design of technical solutions of control, instrumentation and communications for proposals and prospects of electrical generation and co-generation: solutions using thermic and photovoltaic sources. - Coordination of Engineering design of control, instrumentation and communication solutions for company’s projects, both new projects as well as enhancements in the existing power plants - Dimensioning of Photovoltaic Solar prospects, proposals and projects using PVsyst software and other engineering tools. Verification of solar generation potential of third party projects. Projects: - Corpacero Power Plant (3 MW). Detailed Engineerig of the Cogeneration power plant using 3 Jenbacher JBB320 motogenerators with Natural Gas. - Plaza Central Shopping Center Photovoltaic Solar Power Plant (460 kWAc – 493 kWp) Detailed Design and Engineering of Photovoltaic Solar Power Plant. - PET del Caribe Photovoltaic Solar Power Plant (500 kWAc – 627 kWp) Revision and approval of the engineering of the EPC project. - Synchronization of Thermic Plants Termomorichal I and Termomorichal II through a 10km Fiber link. Revision of Engineering of synchronization system provider, detail engineering of interconnection and integration works, OPC integration of Generation Control System and Electrical Scada, commissioning and start-up of the project. - Agrodex Photovoltaic Solar Power Plant (72 kWAc – 101 kWp). Revision and approval of the engineering of the EPC project. Show less
-
-
-
ABB
-
Switzerland
-
Automation Machinery Manufacturing
-
700 & Above Employee
-
Industrial Automation Senior Engineer
-
Oct 2009 - Oct 2019
Responsibilities: - Design Engineering of Industrial Automation Solutions for Process Industry (Oil&Gas, Food and Beverages and Utilities) including Basic Process Control Systems (BPCS) and Safety Instrumented Systems (SIS): ABB hardware and third party hardware selection, software solution design and configuration. - Engineering management of Process Automation Projects from the early designs stages, process panels design and assembly, software configuration, site installation, commissioning, start-up and handover to customers. - Technical Support at the identification and dimensioning of business opportunities and customer solutions. Main Projects: - CENTRAL CERVECERA DE COLOMBIA (CCC) – Electrical Scada Coordination of communication networks infrastructure installation and hardware commissioning of Electrical Scada of the Brewery - OCENSA–Variable Frequency Drives (VFD) of Pumps BPC-42010/20 of Cusiana Oil Pumping Station. Design of Control and communication solution between VFD’s, PLCs and Transformer; integration of VFD with existing Control System, commissioning and start-up of the project. - ECOPETROL–Upgrading of BPCS and SIS of Cupiagua Crude Production Facilities (CPF) Design and Engineering of Safety Instrumented System solution, both Hardware and Software, software and application configuration, coordination of Site Works of Hardware Upgrading during Scheduled Plant Shutdown, commissioning, Start-up and Handover to the customer. - OLEODUCTO BICENTENARIO–BPCS of Coveñas Terminal Oil Station Project Lead Engineer, coordination of project engineering works, hardware and software specification and selection, general design and engineering of control system solution. - OLEODUCTO DE LOS LLANOS ORIENTALES (ODL) – BPCS and SIS of Corocora and Jagüey Oil Pumping Station Functional Safety Management System (FSMS) activities, design of SIS solution, coordination of SIS detailed design and application implementation. Commissioning, Start-up and Handover to Customer. Show less
-
-
-
Ecopetrol
-
Colombia
-
Oil and Gas
-
700 & Above Employee
-
Technical Support Engineer - Control and Instrumentation
-
Nov 2005 - Aug 2007
Responsibilities Technical support of the Control Systems of the Aromatics and Poliolefins Plants of Barrancabermeja Refinery: Maintenance, configuration, planning and troubleshooting of DCS, Emergency Shutdown and Turbo-machinery Control Systems. Management of shutdown and turnaround, problem solving and root-cause analysis of electronic equipment failures. Achievements: Fast learning of Industrial Control Systems, Management, implementation and leadership of Improvement projects inside the plants. Duties: Maintenance, management and Troubleshooting of Industrial Control Systems, Development of Conceptual Engineering of Control and Instrumentation, management of shutdown and turnaround, problem solving and root-cause analysis of electronic equipment failures. Show less
-
-
Education
-
Heriot-Watt University
Master's Degree, Computer Vision and Robotics -
Universitat de Girona
Master's Degree, Computer Vision and Robotics -
Université de Bourgogne
Master's Degree, Computer Vision and Robotics -
Universidad Industrial de Santander
Engineer's Degree, Electronics Engineering