Carl Ekberg

Process & Production Engineer at Cortus Energy AB (CE)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
SE
Languages
  • Svenska Native or bilingual proficiency
  • Engelska Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Peter Olsén

Karl sommarjobbade hos oss under sin studietid. Han har utfört sina uppgifter väl och med ansvar. Passar tider och är en omtyckt arbetskamrat.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Sweden
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Process & Production Engineer
      • Jan 2023 - Present

      Managing test programs, co-ordinating and managing continous process improvement projects, optimizing plant processes, training operations personel at Cortus WoodRoll 6MW syngas plant in Höganäs, Skåne.

    • Plant Process Engineer
      • Jan 2021 - Feb 2023

      Process engineer managing the test programs and continous plant improvements of the world-first WoodRoll 6MW syngas plant in Höganäs, Skåne.

    • Senior Shift Engineer
      • Dec 2019 - Jan 2021

      Led one of 5 shift-teams, overseeing operations and production at the plant as well as participated in executing test programs as a part of the overall comissioning of the world-first, WoodRoll 6MW syngasplant in Höganäs, Skåne.

    • Process Engineer
      • Oct 2018 - Dec 2019

      Documented installation and specifications of instruments, updated instrument databases, participated at signal check-out, FAT, SAT and overall comissioning of automations system and set-up the plant maintenance system at the world-first, WoodRoll 6MW syngas plant in Höganäs, Skåne.

  • Böle Garveri AB
    • Luleå, Norrbottens län, Sverige
    • Master Thesis Student
      • Jan 2018 - May 2018

      Produced a techno-economical analysis of a biogas plant and a feasibility study for self-sufficiency at Böle Garveris new tannery in Bagatipara municipality, Bangladesh. Produced a techno-economical analysis of a biogas plant and a feasibility study for self-sufficiency at Böle Garveris new tannery in Bagatipara municipality, Bangladesh.

Education

  • Luleå tekniska universitet
    Master of Science - MS, Sustainable Energy Engineering
    2013 - 2018
  • Wargentinskolan
    Gymnasieexamen, Teknikprogrammet
    2010 - 2013

Community

You need to have a working account to view this content. Click here to join now