Cameron Emick, PE

Project Manager at Timberline Building Systems
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Languages
  • English Native or bilingual proficiency
  • Spanish Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Manager
      • Apr 2021 - Present

    • United States
    • Government Administration
    • 700 & Above Employee
    • ITS Project Engineer
      • Aug 2018 - Apr 2021

      - Designed and developed several multimillion dollar projects which included:o Project scheduling, critical path analysis, environmental, utility and right of way coordination, specification development, cost estimating, plan compiling, FHWA project review, and project advertisement.o Selection of sizes of monotube structures, light standards, camera poles, fold over towers, foundations, caissons, and conduit bridge attachments based on AASHTO, FHWA, MUTCD, CDOT, and many other standards.o Design of erosion control plans, and power requirements for ITS devices.- Managed and inspected of several multi-million dollar construction projects along state highways, which included:o Contract management, contractor management, prevailing wage review and compliance, OJT and DBE review, submittal and shop drawing approvals, MHT approvals, force account billing, change order development, and project closure.o Inspection of caisson installation according to CDOT’s standards, structure compliance and installation.o Brokered agreements with railroads, ditch companies, and various other utilities for fiber expansion.- Experience with all aspects of the ITS device and network design and installation, including nearly 200 miles of fiber optic cable, over 100 Ciena Ethernet switches, several CWDM fiber networks, over 100 cameras, and dozens of weather stations, dynamic message signs, variable message sign controller upgrades, wavetronix radar detectors, and travel time indicators.- ITS lead on three major highway widening projects and contributing member of the ITS Standard Specifications and Details committee. - Managed consultant schedules and time to effectively aid in the design and construction of ITS projects.- Trained in CDOT’s project administration/construction management system, proposal and estimate system, payroll compliance, MicroStation, traffic control, erosion control programs, and familiarity in TIMS incident management. Show less

    • Engineer In Training
      • May 2012 - Aug 2018

      • Inspected and managed construction of several large scale Fiber Optic Cable and Traffic Device installation projects along state highways, which included: o Insuring construction was executed with utmost safety for the laborers as well as highway drivers o Submitting CDOT paperwork to various people within CDOT o Traveling day or night to close and distant locations to inspect and manage multiple sites o Meeting with contractors to discuss and decide on how to overcome obstacles so that the resulting solution would be within the specifications of CDOT's standards• Designed projects to install Traffic Devices for the highways using MicroStation and field surveying• Trained in CDOT’s construction management system, proposal and estimate system, payroll compliance, MicroStation, and Traffic Control programs Show less

  • Timberline Landscaping
    • Colorado Springs, Colorado Area
    • Foreman/Laborer
      • May 2004 - Apr 2012

      • Summer and winter employment with 40 plus hours per week while going to school • Developed a strong work ethic and reliability through manual labor • Constructed greenhouses, mowed grass, surveyed, repaired equipment, and operated heavy machinery • Drew plans based on design by manager after viewing • Led small crews and reported to several supervisors • Summer and winter employment with 40 plus hours per week while going to school • Developed a strong work ethic and reliability through manual labor • Constructed greenhouses, mowed grass, surveyed, repaired equipment, and operated heavy machinery • Drew plans based on design by manager after viewing • Led small crews and reported to several supervisors

Education

  • Colorado School of Mines
    Masters, Engineering and Technology Management
    2011 - 2012
  • Colorado School of Mines
    Bachelor's degree, Civil Engineering
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now