Calum MacLean

Projects Director at Marine Technical Limits Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Aberdeen, United Kingdom, GB
Languages
  • French -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certificate in Project Management
    University of Aberdeen

Experience

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Projects Director
      • Aug 2003 - Present

      Along with Matt Lewin, built up MTL from being a 2 man consultancy to an organisation with over 40 people supporting FPSO integrity management and on-station repair projects in UKCS, Newfoundland and West Africa. Building and leading repair teams to achieve exceptional performance.Developed repair procedures, safety procedures and bespoke equipment to support inspection and hotwork repairs within the tanks of producing FPSO's. Established project and managed significant structural repairs with ongoing production on an FPSO in Equatorial Guinea from 2006 - 2013 with up to 30 people working in tanks. Following this, also developed a more responsive small team approach for minor hull repairs with MTL providing supervision, plant, consumables and engineering support for assets in UKCS and Canada. Proud to be active in spreading our knowledge of managing FPSO hull integrity throughout the life cycle and developing the most advanced software tools and equipment to support inspection and repair in production. Pioneers of virtual reality simulations of tank inspections/repairs and the fully digitalised hull inspection process - from planning through to execution and close out.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Construction Engineer
      • Jul 2002 - Jan 2006

      Carried out research into alternative repair methods for Schiehallion FPSO then developed repair solutions and estimates and established the repair project. Developed construction methodologies; led the training of the hotwork crews and risk assessments. Developed the bulk demucking methodology for cleaning of slops tanks.

    • United Kingdom
    • Professional Services
    • 700 & Above Employee
    • Project Manager
      • Apr 2000 - Oct 2004

      Led the design and construction of the BP Forties Charlie Reconfiguration project (brownfield modifications) involving 100 design personnel and 60 construction personnel across 3 offshore installations. Supported commissioning and startup of the Forties Charlie following shutdown modifications. Followed on to support Forties Redevelopment study and develop process simplification solutions.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Mechanical Engineer
      • 1992 - 1997

      Developing specifications, data sheets, scopes of work. Vendor contract management and review of submitted drawings, documents, material specifications and procedures. Technical bid reviews, package management and procurement.

Education

  • University of Strathclyde
    MEng, Manufacturing Sciences and Engineering
    1987 - 1992
  • Robert Gordon's College
    High School
    1981 - 1987

Community

You need to have a working account to view this content. Click here to join now