Ben Dyke

I was Callan's Supervisor on the Grout Connection project on Greater Gabbard Wind Farm in 2015, and immediately found him to be professional, keen and reliable member of the team. The project was classed as high risk, due to the need for rope access techniques to enter the monopile and Callan not only displayed a willingness to complete his work as to the strict health and safety standards set, but a desire to learn from others and apply those skills directly to the job at hand. I would highly recommend Callan to any future employees who are looking for a hard working, intelligent team member, of whom I have no doubt will go far in the wind industry.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Services for Renewable Energy
    • 1 - 100 Employee
    • Operations Manager
      • Jan 2022 - Present

      *Headed the operations team and planned, managed, monitored and coordinated the completion of projects including managing various trades and labour resource on site. *Identified the people and resources required to complete the work and planned and managed their activities to deliver the outputs to agreed costs, quality and timescale to achieve project deliverables.*Ensured compliance with HSE programmes and regulations.*Assigned overall responsibility for the budget of the region’s operations. Show less

    • Project Manager
      • Jan 2021 - Jan 2022

      *Led project kick off meetings as well as planning from a rotation perspective across all projects.*Responded to RFPs and prepared quotations for clients including invoicing upon the completion of projects.*Monitored and reported on progress against the project plan with regular progress reports.*Identified and addressed any blocking points or risks which may impact project timeline, dependencies or budget

    • Offshore/Onshore Inspection Team Lead.
      • Feb 2020 - Jan 2021

      *Led the team as Statutory Inspection team as well as the lead AT on Siemens 3.6mw assets, and AT for Davit crane NDT works on Siemens 6mw DD assets.*Serviced Siemens 3.6mw assets, completed retrofits and replaced bearings.

    • Denmark
    • Wind Electric Power Generation
    • 700 & Above Employee
    • Offshore/Onshore Inspection technician
      • Mar 2019 - Feb 2020

      •Completed upgrades on Vestas V164 structures on Burbo Bank Extension, Walney Extension, Blyth windfarm and Aberdeen Bay windfarm, including the installation of YAW sensors, mechanical upgrade of HMF crane platform, change out of busbar bolts, upgrade to rotation unit plug on gear box and extensive upgrades to the Trafo hatches, hydraulic bolt stretching, hydraulic torqueing and mag drill machines used. *Maintained the Avanti service lift when required to ensure they remain in service •Completed upgrades on Vestas V164 structures on Burbo Bank Extension, Walney Extension, Blyth windfarm and Aberdeen Bay windfarm, including the installation of YAW sensors, mechanical upgrade of HMF crane platform, change out of busbar bolts, upgrade to rotation unit plug on gear box and extensive upgrades to the Trafo hatches, hydraulic bolt stretching, hydraulic torqueing and mag drill machines used. *Maintained the Avanti service lift when required to ensure they remain in service

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Wind Turbine Inspection Technician (Rope Access)
      • Mar 2015 - Feb 2020

      *Conducted full statutory inspections on Siemens 3.6mw structures, siemens 6mw structures and vestas V164 structures, and took on a Team lead role on the grout connection campaign 2017/2018 on SSE’s Greater Gabbard. *Conducted full statutory inspections on Siemens 3.6mw structures, siemens 6mw structures and vestas V164 structures, and took on a Team lead role on the grout connection campaign 2017/2018 on SSE’s Greater Gabbard.

  • Special Blade Service
    • France - wind farm le penage - wind farm melleray
    • Blade Inspection/Repair
      • Oct 2015 - Dec 2015

      *Completed full external inspections of the LM 48.5 meter blade using the Bronto Sky Lift. *Inspected for cracks, chips, De-lamination and lightning damage. *Replaced the vortex panels on the Down Wind side of the blade. *Completed full external inspections of the LM 48.5 meter blade using the Bronto Sky Lift. *Inspected for cracks, chips, De-lamination and lightning damage. *Replaced the vortex panels on the Down Wind side of the blade.

    • Rope Access Blade Inspection - Wrinkle Inspection
      • Aug 2015 - Oct 2015

      Lead Rope Access Blade Inspection - Wrinkle Inspection - Sky Access BV- Inspection of the LM61.5 meter P2 blade. Inside and outside, using rope access techniques.- Inspecting for wrinkles in the lamination of the blade and also cracks in the gelcoat.- light surface preparation mechanically, taking back a thin layer of gelcoat, then re-applying with a fresh layer of gelcoat.- Removal of faulty LE protection, ready for re-application. - Full documentation of every defect found and also last years findings, photos and full reports for every blade on each turbine. Show less

    • Rope Access Wind Turbine Operations & Maintenance Technician
      • Jul 2015 - Aug 2015

      Rope Access Operations & Maintenance Technician - Sky Access BV- Outboard rope access work on the TP.- Inspection of the integrity of the coatings. - Surface preparation using mechanical power tools. Removing corrosion & faulty coatings.- hand applications of corrosion prevention systems.- documentation.

  • Access direct ltd
    • Ratcliffe power station
    • Rope Access Operative
      • Jun 2015 - Jun 2015

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Offshore Industrial Painter
      • May 2015 - Jun 2015

      Industrial Painter, Cwind - repairs on TP and monopile. - mixing of coded paints. - applying paint making sure the right thickness. - attending tool box talks and working to the work specification provided. - transferring on to the asset using the amplemann on the galyna floating hotel. Industrial Painter, Cwind - repairs on TP and monopile. - mixing of coded paints. - applying paint making sure the right thickness. - attending tool box talks and working to the work specification provided. - transferring on to the asset using the amplemann on the galyna floating hotel.

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Industrial Painter
      • Jan 2014 - Jul 2014

      Duties included stripe coating and maintaining a high standard of paint work to both Shell and BP modules. Due to high levels of toxicity in paint a good knowledge of health and safety was required and I was present at many tool box talks, COSHH sheets risk assessments and permits to work were all completed. The use of PPE and facial respiratory masks were important when working in spray tents, I was also taught to use equipment such as mini blast pots and keeping the sight clean and tidy was crucial for safety. Show less

  • DirectTeam
    • Melbourne Area, Australia
    • Construction Maintenance - general labourer
      • 2013 - 2014

      Duties included assisting the carpenter put stud work in and the use of power tools such as circular saws, hammer drills, wacker plate, hand tools, general site cleanliness was important for health safety. I completed permits to work, risk assessments and attended many toolbox talks. Duties included assisting the carpenter put stud work in and the use of power tools such as circular saws, hammer drills, wacker plate, hand tools, general site cleanliness was important for health safety. I completed permits to work, risk assessments and attended many toolbox talks.

Education

  • Oriel High School
    2003 - 2007

Community

You need to have a working account to view this content. Click here to join now