Cai Yvonne

Facility Engineer at 矽品精密工業股份有限公司
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Taiwan, TW

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Taiwan
    • Semiconductor Manufacturing
    • 200 - 300 Employee
    • Facility Engineer
      • Apr 2018 - Present

      A. Responsibilities: (1). Plant construction and supervision: Participate plant and production line capacity expansion projects at least 20 projects from 2018 to 2021. (2). Small-scale repairs in the factory: Implement the livelihood-related's repairing, and communicate with cross-departmental to reduce internal employee complaints and improve work efficiency. (3). Vendors management: 100-person, Supervised their occupational safety and coordination construction progress. (4). Communicate and work with Corp. SHE and local colleagues on programs implementation or project support. B. Performance: (1). Pure water system: planning, construction and supervision. #2B3T pure water system: It's a main system in technology factory. #PCW cooling water system: for Hanmi machine production line. #3MDIW system: For De-burr machine production line. (2). Wastewater system: planning, construction and supervision. #Recycling water system: Reuse of waste water inside in the factory, it could reduce wastewater discharge and avoid water shortages. (3). Supervision and construction of the acid-base exhaust system of the washing tower. (4). Supervision and construction of 8-inch BumpingLine-grinding machine. (5). Supervision and construction of 8-inch BumpingLine-high pressure washer machine. (6). Supervision and construction of 8-inch BumpingLine-etching machine. Show less

    • Project Manager
      • Nov 2015 - Apr 2018

      A. Responsibilities: (1). Climate change strategy (e.g. CSR report, CDP project and ISO 14064-1). (2). Gold Standard/VER project and EPA offset carbon project implementation. (3). Excellent conceptual thinking abilities. (4). Strong ability to self-motivate, prioritize tasks and deliver results within tight deadlines (5). Excellent communication skills, both written and oral Natural ability to work within diverse teams. B. Performance: (1). Biogas power generation carbon credit development application of EPA's offset project: Project leader/The first national biogas power generation project application case -- Hanbao Ranch, Changhua. (2). Composting's carbon credit development of EPA's offset project: Project leader/The first pig manure composting carbon credit project application case -- Hanbao Ranch, Changhua. (3). Wind power generation carbon credit development application for Gold standard project.: Project leader/Project obtains the qualification of the Japanese inspection agency and conducts substantive transactions -- Miaoli Wind Power, Miaoli, Taipei (4). Guidance on GHG inventory for technology company: Project leader/Conduct equipment inspection to confirm the source of GHG emissions -- Chroma, Taoyuan. C. Invited speaker at: (1). Biomass Energy Industrialization Technology Seminar, Taipei, Taiwan, 10/2017. (2). Green Power Revenue and Generator Training Courses in Pig Farm, Changhua Taiwan, 09/2017. (3). Sustainable development’s workshop for Business, Taipei, Taiwan, 01/2017. (4). Annual conference of engineering and information technology, Taipei, Taiwan, 09/2014. Show less

Education

  • 國立臺北科技大學
    Master's degree, Institute of Environmental Engineering and Management
    2013 - 2015
  • 東海大學
    環境工程學系
    2009 - 2013

Community

You need to have a working account to view this content. Click here to join now