Cagri Terkivatan

Mechanical Project Manager at Alkataş İnşaat
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Istanbul, Istanbul, Turkey, TR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Türkiye
    • Construction
    • 1 - 100 Employee
    • Mechanical Project Manager
      • Jan 2021 - Present

      - Tendering works for industrial plant, treatment plants - Design-Procurement & Installation works supervision

    • Project Manager
      • Dec 2018 - Dec 2020

      ATAKÖY WWTP 2nd. PHASE DESIGN & BUILT WORKS Ataköy atıksu arıtma tesisi 2. Kademe inşaatı ve 1. Kademe revizyon işleri -240.000 m3/gün / 450 ton/gün Çamur Kurutma Tesisi / 48 MW Kazan BinasıAtaköy WWTP 2nd.Phase Construction Works & 1st. Phase Refurbishment Works - 240.000 m3/day / 450 tonnes/day Sludge Drying Plant / 48 MW Boiler Building

    • Mechanical Installation Consultant
      • Jan 2018 - Dec 2018

      ATAKÖY WWTP 2nd. PHASE DESIGN & BUILT WORKS

    • Founding Partner
      • Jan 2014 - Dec 2018

      Mechanical Equipment Installation & Piping Works - Hayrabolu WWTP Installation & Piping Works (TURKERLER-LOTUS A.S) - Saray WWTP Installation & Piping Works (TURKERLER-LOTUS A.S) - Kesan WWTP Installation & Piping Works (TURKERLER-LOTUS A.S) - Izmir Kavaklidere DWTP Installation & Piping Works(VA TECH WABAG GMBH) - Tupras RUP projesi interconnecting pipelines (GEMSAN A.S.) - Hanger gusset plate welding for 1. bosphorus bridge (IHI JAPAN) - Wind Tongue & Rocker link welding for 1. bosphorus bridge (IHI JAPAN) - Cooling Water Pump Replacement Works (BESLER A.S.) - Manavgat WWTP Mechanical Installation & Piping Works (AKYAL - LIDYA CEVRE) - Serik WWTP Piping Works (AKYAL - LIDYA CEVRE) -Rocker link welding for 2. bosphorus bridge (IHI JAPAN) -Erzincan WWTP Mechanical installation works(ALKATAŞ İNŞ.) -Kocaeli Kullar WWTP Mechanical installation works(ALKATAŞ İNŞ.) -Akşehir WWTP Mechanical installation works (ACCIONA - ARBIOGAZ) -Turgutlu WWTP Mechanical installation works(ÖZBURAK İNŞAAT) - Urfa WWTP Mechanical installation works (VA TECH WABAG GMBH) Show less

    • Germany
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Branch Technical Manager
      • Dec 2012 - Dec 2013

      -Functional Design of Wastewater Treatment Plant-Mechanical Design of Wastewater Treatment Plant-Budgeting for mechanical installation works-Budgeting for tenders & whole project. -Installation & Erection Supervison of Treatment Plants. -Coordination with Clients-Technical evaluation for mechanical equipments of Treatment Plants.-Coordination of all disciplines working for Treatment Plant design & erection.

    • Deputy Project Manager
      • Feb 2010 - Dec 2012

      Ambarlı WWTP Project - 122.500.000 € - @400.000 m3/day - Including Sludge Drying & Cogeneration System- Mechanical Design of Wastewater Treatment Plant.- Installation & Erection for Electro-Mechanical Works for waste water treatment plant including (Cogeneration Plant w/gas turbines) & (Sludge Dryer Plant) - Coordination with Client - Follow up time schedule for the project

    • Environmental Services
    • 1 - 100 Employee
    • Project Engineer
      • Jun 2006 - Feb 2010

      Mechanical Design of wastewater treatment plant Tendering works Supervision of installation & erection works Konya WWTP Design & Installation & Commissioning Works @ 200.000 M3/day Mechanical Design of wastewater treatment plant Tendering works Supervision of installation & erection works Konya WWTP Design & Installation & Commissioning Works @ 200.000 M3/day

    • Saudi Arabia
    • Construction
    • 100 - 200 Employee
    • Site Senior Engineer
      • Mar 2003 - May 2006

      İnstallation & Erection Works for İndustrial Plants - Hofuf Water Transmission System - Contractor : A.Hak - Al-Rashid - KSB Gmbh - Client : SWCC *Installation of Surge Vessels & Pumps & Motors & Tank Farm Piping - Jeddah 4 Desalination Plant Refurbishment Works - Contractor : ACWA Power - SASAKURA - Client : SWCC *Refurbishment works for MSF plant - Stainless Steel Lining works - Tube supports & Tube Bundle renovation works & Vacuum System Renovation works - Cladding & Painting of Evaporation Modules Show less

Education

  • Istanbul Technical University
    BS, Mechanical Engineering
    1995 - 2000
  • İstiklal Makzume Anadolu Lisesi
    1988 - 1995

Community

You need to have a working account to view this content. Click here to join now