Byron Bajoie

VP of Completions and Production Solutions at DATAGRATION
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tomball, Texas, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Travis Johnston

I worked with Bryon for 4 years in Apache's East Texas Giddings asset. He was an excellent colleague, always very professional, friendly and easy to communicate with. Always willing to help the team in any way he could, whether in the office or in the field. Byron was very knowledgeable about various completions and fracture stimulation processes, and always looking for a better more efficient way to improve a procedure or process. I enjoyed the opportunities I had to work with him and learned much about fracture stimulation principles from him.

LinkedIn User

As a geoscientist I always appreciated Byron’s knowledge and ability to explain well stimulations. His technical expertise is impressive and I highly recommend Byron to any group needing an experienced completions engineer.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Software Development
    • 1 - 100 Employee
    • VP of Completions and Production Solutions
      • Apr 2022 - Present

    • Oil and Gas
    • 700 & Above Employee
    • Completion Operations Engineer / Advisor
      • 2013 - Mar 2019

      COMPLETIONS OPERATIONS MANAGER (2014-19) • Directed Eagle Ford, Canyon Lime and Woodford Shale completion operations on 150+ wells and prepared annual budgets for completion staff and operations of $50M to $60M. • Managed 40+ personnel including completion foremen, engineers, consultants and third party/vendor staffs. • Realized a cost reduction of $220K per well through efficiencies in planning and execution. • Reduced TRIR on well pads 42% with an on-site safety program created to address specific incident rates. • Cut days to first production 12 days by integrating engineering, facilities and production operations. • Built operational KPIs to identify needed improvements; delivered approx. $100K per well savings over time. • Reduced costs $120K per well by implementing sliding sleeves, dissolvable technology, E-coil technology, hydraulic fracture diversion technology, and others, as appropriate. • Chosen to manage Apache-Egypt’s first horizontal unconventional wells and successfully completed the wells under extremely difficult logistic and weather conditions below budget and with no recordable injuries. SENIOR COMPLETIONS / PRODUCTION ENGINEER ADVISOR (2013-14) • Led operational and technical aspects of design, execution, and analysis of the Eagle Ford Shale play. • Reduced costs $2.5M per well and doubled production by re-engineering Eagle Ford completions operations. • Cut water costs from $1.45 to $0.05 per bbl by designing a water supply system for fracturing treatments. • Decreased costs $46K by modifying toe-prep operations. • Reduced completion times 6 days by re-engineering clean-out operations to eliminate stick-pipe clean-outs. • Minimized screenouts and reduced trouble fracturing stages by developing and implementing a completion database incorporating real-time fracturing data for study and on-site design improvement. Show less

    • Oil and Gas
    • 100 - 200 Employee
    • Sr. Completion / Produciton Engineer & Advisor
      • 2011 - 2013

      SENIOR COMPLETIONS ENGINEERING ADVISOR (2012-13) • Led engineering on all high-profile unconventional Monterey Shale new completions and technologies, and advised on production enhancements for new well completions, workovers and critical operations. • Saved $721K per well and cut days to production 5 days by re-engineering the hydraulic fracturing design. • Completed 15 wells with a 27% production increase. • Reduced water cost 75% and minimized disposal cost by using produced water in the fracturing fluid system. • Presented quarterly results on trends and challenges in the fracturing program to management. SENIOR COMPLETIONS PRODUCTION ENGINEER (2011-12) • Led operational and technical aspects of design, execution, and analysis for plays in the San Joaquin Basin. • Established new Venoco completion techniques in the San Joaquin Valley. • Increased production from 0 to 500 bopd by performing well analyses and recompletion activities. • Engineered and executed company’s first slickwater fracturing treatment of a refrack well, increasing production by 743 bopd at 50% the cost of the treatments being utilized in the area. • Realized cost saving of 27% to 35% on most operations and reduced the safety incident rate 41% by implementing KPIs to track operations, production and safety. • Advised other business units on design, execution and analysis of completions for all wells drilled in California. Show less

    • Canada
    • Oil and Gas
    • 700 & Above Employee
    • Completion Advisor
      • 2006 - 2011

      COMPLETION ADVISOR - SHALE PLAYS/COMPLETION OPERATIONS (2011) • Chosen by upper management to lead all operational and technical aspects of design, execution, and analysis of unconventional/shale plays for the Piceance Business Unit. • Managed the company’s first Niobrara well which unlocked 2T of gas potential and came in 35% under AFE. • Provided operational and technical support to other business units, including teams working on Bossier, Haynesville and Marcellus shale as well as unconventional plays in Canada. COMPLETION OPERATIONS MANAGER (2008-11) • Managed a $40M to $50M completion budget yearly. • Reduced TRIR 80% by implementing monthly joint safety meeting with staff and third-party contractors. • Achieved a 35% decrease in days to first production, a 29% decrease in fracturing down time and a 53% increase in initial well prep operations efficiency by instituting KPIs on all operation. • Engineered, designed and supervised completion of the first 2 horizontal Williams Fork wells. • Led a SIMOPS team which developed, implemented and policed SIMOPS operations. COMPLETION ENGINEER (2006-08) • Managed completions for wells drilled in the Wind River and Green River Basins of Wyoming. • Increased production 33% and reduced completion costs approx. 42% per year by redesigning the operation. • Created a completion scorecard to analyze and grade service providers. • Developed and instituted a QA/QC training manual which included on-site QA/QC instructions, fracture theory, rock mechanics, perforation strategies and other operations surrounding completion programs. Show less

  • BP of America
    • Houston, Texas Area
    • Senior Completion Engineer
      • 2004 - 2006

      • Managed completions for wells in the Jonah and Pinedale Fields of Wyoming. • Developed and instituted BP’s first 24-hour completion operations, which resulted in a savings of $3.5M per pad, a 60% reduction in days to first production and a more streamlined fracturing operation. • Created a MOC process for 24-hour operations which resulted in a 23% reduction in non-productive time. • Managed completions for wells in the Jonah and Pinedale Fields of Wyoming. • Developed and instituted BP’s first 24-hour completion operations, which resulted in a savings of $3.5M per pad, a 60% reduction in days to first production and a more streamlined fracturing operation. • Created a MOC process for 24-hour operations which resulted in a 23% reduction in non-productive time.

    • Senior Staff Engineer
      • 2003 - 2004

      • Managed and coordinated company services in Russia, including consulting and software. • Provided training and on-site real-time supervision, fracture engineering, fracture treatment design, supervision, and post treatment evaluation for projects around the world. • Integrated several fracture stimulation technologies including fracture modeling, fracture mapping (tiltmeter and microseismic technologies) and production data analysis. • Managed and coordinated company services in Russia, including consulting and software. • Provided training and on-site real-time supervision, fracture engineering, fracture treatment design, supervision, and post treatment evaluation for projects around the world. • Integrated several fracture stimulation technologies including fracture modeling, fracture mapping (tiltmeter and microseismic technologies) and production data analysis.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Country Technology / StimulationTechnology Manager
      • 2000 - 2003

      COUNTRY TECHNOLOGY MANAGER (2001-03) • Advised and assisted the Saudi Aramco engineering staff with optimization of completion designs and stimulation treatments on HTHP wells in the Khuff Carbonate, and Jauf and Unayzah Sandstone formations. • Cut completion costs 38% through careful application of technology for Saudi Aramco and Halliburton. • Lowered cost $375M per well by implementing indirect fracturing instead of conventional sand control. • Developed and led courses in well completions for engineering staff. STIMULATION TECHNOLOGY MANAGER (2000-01) • Managed a Technical and Sales Team of 17 in providing completion technology to Halliburton customers. • Championed the introduction of new technology and completion practices to internal and external customers. • Assisted in development and introduction of new products and services to enhance stimulation and completion. • Assisted in the development of QA/QC standards for new products and technologies. Show less

Education

  • Louisiana Tech University
    BS, Petroleum Engineering

Community

You need to have a working account to view this content. Click here to join now