BUHARY FARHAN

Quantity Surveyor / Sr. Quantity surveyor at AL RYUM GROUP OF COMPANIES
  • Claim this Profile
Contact Information
Location
United Arab Emirates, AE

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • Quantity Surveyor / Sr. Quantity surveyor
      • Oct 2019 - Present

      Currently working as a Senior Quantity Surveyor / Project Quantity Surveyor for Al Ryum Group, located in Abu Dhabi & Dubai, the Projects are Road, Infrastructure, landscaping & Building works. Projects : Production City, Pearl Jumeirah, Vida Mall & Dubai Hills. Cost : AED 1,100 Million Client : TCOM, MERAAS, EMAAR Developer Project Management : NORTH25, Khatib & Alami , Cracknell. Duties & Responsibilities: Post-Contract • Assessing the Contractor’s Interim Payment Application’s prepared and recommends Payment Certificates • Preparing project cash flows • Ensure Bonds, insurance, and guarantees are maintained and update • Evaluates the variations as per Engineer instruction. • Assist the CM in the review, negotiation, and preparation of claim settlements with the Contract’s Department of Client and the Engineer • Prepare the Statement Of Completion and Finalize the Final Account of projects and check & record measurements of completed work • Prepare the Interim Payment and cost proposals for the submission. • Preparing budgets for the Engineer Instructions prior issuing to the Contractor • Evaluating on Variations/Claims submitted by the Contractor • Coordinating with Procurement / Technical/ Operations Team, obtain corresponding approval & appoint the Contractors/ Subcontractors/ Suppliers • Working on float, receive, evaluate the enquiry for the comparison of the items and the price quoted by them • Prepare “Bill of Quantities” by studying the Drawings & Specification of individual items required for the project. • Value management and value engineering Show less

    • Quantity Surveyor / Estimator
      • Jul 2016 - Aug 2019

      DMT – Desert Man General Contracting, Abu Dhabi The project carried out covered the complete Oil Plant & Staff accommodation Construction, and fully Infrastructure Road works, Street lighting, Portable water & Sewerage treatment Plant, Electrical Works Substation, Landscape & Hardscape. Projects : ADNOC Oil Plant (Al Dhabia Abu Dhabi) Cost : AED 650 Million Client : ADNOC Consultant : Technimount Consultants Duties & Responsibilities: Post-Contract • Preparing monthly IPA- Interim Payment Application and Cost Proposals of variations works. • Preparing monthly cost reports including forecast costs and budget. • Attended progress meetings. • Variations analysis as per design change and client requirement. • Rate buildups for new Items. • Prepared cost estimates, BOQs and comparison sheets to evaluate the changes and additional work. • Reported to the Management about the commercial issues and attending commercial meeting. • Attended consultant meetings and client meetings. • Reviewed tender documents, drawings and specifications. • Coordinated the design team particularly in design change issue. • Finalized the Final Account of projects and Check & record measurements of completed work. • Evaluated the unit rates for new work items and Monitor the contractor’s resource allocation Show less

    • Quantity Surveyor
      • Mar 2010 - Apr 2016

      KHK Holding Ajman UAE. This Project consists of Infrastructure Development including Earthworks, 28km of arterial roads and 31km of internal neighborhood roads & Parking, Sewerage, Storm water, Potable water, Irrigation, Telephone, Electrical, Street lighting works, Villas and landscaping. Projects : Ajman Road and city Development. Cost : AED 420 Million Client : R Holding Consultants : BMC Consultants. Duties & Responsibilities Post-Contract: • Assessed the Sub Contractor’s Interim Payment Application’s prepared and recommends Payment Certificates. • Variations analysis as per design change and client requirement • Rate build ups for new Items • Prepared of Bill of Quantities using as per principal method of measurement (POMI, CESMM3) for Tender Documents. • Attended consultant meetings and client meetings. • RFQ & followed up quotations and prepared quotation comparison • Prepared and submitted of the Interim Payment Applications in accordance with the Contract. • Prepared supporting documents and detailed measurement sheets for the Variation Claims. • Pricing Variations to Clients & Prepared of Monthly Commercial reports in conjunction with PM and site team. • Prepared of material on site value to include in the Valuation • Quantity Take Off for all Civil elements (manually, A-CAD). • Maintained logs for Claims and thereby agreeing Variations Change Orders. Show less

    • Quantity Surveyor
      • Apr 2008 - Jan 2010

      Duties and Responsibilities the Buildings project Quantity Surveyor, Constructions works at Sri lanka • Preparing interim payments & Final accounts. • Reporting to Project Manager • Man power allocation, Progress evaluation. • Preparation of Re Cape Quantity • Coordinating with sub-contractors & Suppliers. • Quantity take-off based on (IFC/AFC) drawings. • Coordinating Site engineers, supervisors & in charge of stores. • Preparation of variation order and cost Estimation for new item. • Provide support and assistance to cost estimation team. Show less

Community

You need to have a working account to view this content. Click here to join now