Bartosz Sołtyszewski

Wind Turbine Technician at Danwind Blue Water
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Szczecin, Zachodniopomorskie, Poland, PL
Languages
  • Angielski Limited working proficiency
  • polski Native or bilingual proficiency
  • niemiecki Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Avanti Shark Lift Operator
    Alimak Service
  • BTT Electrical
    Global Wind Organisation
  • BTT Hydraulic
    Global Wind Organisation
  • BTT Installation
    Global Wind Organisation
  • BTT Mechanical
    Global Wind Organisation
  • Chester Step
    Vulcan Training & Consultancy
  • FSE Industry - Low-voltage with First Aid
    Trainor
  • GWO Fire awareness
    Global Wind Organisation
  • GWO First aid
    Global Wind Organisation
  • GWO Manual handling
    Global Wind Organisation
  • GWO Sea Survival
    Global Wind Organisation
  • GWO Slinger Signaller
    Global Wind Organisation
  • GWO Working at heights
    Global Wind Organisation
  • HUET+CA-EBS
    OPITO
  • Level D - Installation
    Vestas
  • OGUK
    Vulcan Training & Consultancy
  • Podesty ruchome (1P + 2P)
    Urząd Dozoru Technicznego
  • SGTT - 10 Life Saving Rules
    Siemens Gamesa
  • SGTT - Bolt Tightening Training
    Siemens Gamesa
  • SGTT - Cable Training
    Siemens Gamesa
  • SGTT - Documentation Training
    Siemens Gamesa
  • SGTT - General Electrical Awareness
    Siemens Gamesa
  • SGTT - General Technical Safety Awareness
    Siemens Gamesa
  • SGTT - Hand tool training
    Siemens Gamesa
  • SGTT - Introduction to Lifting Bags
    Siemens Gamesa
  • SGTT - Power Climber Sherpa RD Advance - User
    Siemens Gamesa
  • SGTT - SICS 1 & 2 Hand Terminal User
    Siemens Gamesa
  • Suwnice (2S)
    Urząd Dozoru Technicznego
  • Wózki jezdniowe podnośnikowe (I WJO)
    Urząd Dozoru Technicznego

Experience

    • Denmark
    • Wind Electric Power Generation
    • 1 - 100 Employee
    • Wind Turbine Technician
      • Jan 2023 - Present

      Siemens Gamesa: - Installation Top Team - Mechanical Completion - HiTorque (Towers sections, Hub) and Stretch Tensioning (Blades) - Installation Ground Team - Preparation of main components for installation (Hub, blades) - Forklift operations Siemens Gamesa: - Installation Top Team - Mechanical Completion - HiTorque (Towers sections, Hub) and Stretch Tensioning (Blades) - Installation Ground Team - Preparation of main components for installation (Hub, blades) - Forklift operations

    • Poland
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Wind Turbine Technician
      • Sep 2021 - Jan 2023

      Vestas: - Installation (Top team) - Mechanical completion - Installation Ground Team - Pre-Installation - HiTorque (tower sections, hub) and Bolt Tensioning (tower sections, blades, foundation of tower) - Preparation of main components for installation (tower sections, blades, nacelle, hub) - Screws replacement on tower sections - Vestas LDST assembly and internal works - Forklift operations - Turbine preparation for walkdown (cleaning, pre-punchlist) Vestas: - Installation (Top team) - Mechanical completion - Installation Ground Team - Pre-Installation - HiTorque (tower sections, hub) and Bolt Tensioning (tower sections, blades, foundation of tower) - Preparation of main components for installation (tower sections, blades, nacelle, hub) - Screws replacement on tower sections - Vestas LDST assembly and internal works - Forklift operations - Turbine preparation for walkdown (cleaning, pre-punchlist)

    • Denmark
    • Wind Electric Power Generation
    • 700 & Above Employee
    • Wind Turbine Technician
      • Mar 2021 - Dec 2021

      Vestas: - Installation (Top team) - Mechanical completion - HiTorque (tower sections) and Bolt Tensioning (blades, foundation of tower) - Preparation of main components for installation - Pulling HV/LV cables Vestas: - Installation (Top team) - Mechanical completion - HiTorque (tower sections) and Bolt Tensioning (blades, foundation of tower) - Preparation of main components for installation - Pulling HV/LV cables

  • BPower - Fotowoltaika
    • Szczecin, Woj. Zachodniopomorskie, Polska
    • Fitter PV
      • Oct 2020 - Feb 2021

Education

  • Technikum informatyczne SCI
    Technik Informatyk, Informatyka

Community

You need to have a working account to view this content. Click here to join now