Bryan Hanely

Supervisor - Metrology Dept. at NYX Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Motor Vehicle Manufacturing
    • 400 - 500 Employee
    • Supervisor - Metrology Dept.
      • Jun 2012 - Present

      We are a Superior Automotive Plastics Supplier Supervisor of Metrology Department All measurement systems, CMM, 3D Scan, Color and gloss, formed under one group, to ensure world class performance, throughout all of NYX. Full plant, launch and development support, in all data aspects. Standardized best practices across all customer platforms, working to the highest standards. Design, development and implementation of measurement systems. Annual validation of measurement systems. 3D Reverse engineering and verification of measurement systems. Maintenance, repair and inventory management of measurement systems. Development of work instructions and training videos for measurement systems. Support statistical data collection integrity, repeatability, reproducibility and capability. Show less

    • Ireland
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • External Quality Auditor
      • Sep 2011 - Present

      Validation of plant wide Quality Systems Validation of plant wide Quality Systems

    • United Kingdom
    • Health, Wellness & Fitness
    • Owner/Manager, CHt
      • May 2011 - Present

      Clinical Hypnotherapist who specializes in Memory Enhancements, Behavior Modification, Addictions, Consciousness and Self Awareness. Anaconda Mind Project (AMP) Clinical Hypnotherapist who specializes in Memory Enhancements, Behavior Modification, Addictions, Consciousness and Self Awareness. Anaconda Mind Project (AMP)

    • United States
    • Business Consulting and Services
    • 700 & Above Employee
    • Engineer T. IV
      • Nov 2005 - May 2007

      Performed maintenance on equipment related to clinical studies, including and not limited to,sterilizers, ovens, autoclaves, balances, centrifuges and incubators. Performed calibrations on all equipment used for studies. Performed validations on equipment used and wrote qualifing reports based on USP / ISO guidelines. Designed and implemented upgrades to clinical equipment to allow the equipment to meet new standards. Performed maintenance on equipment related to clinical studies, including and not limited to,sterilizers, ovens, autoclaves, balances, centrifuges and incubators. Performed calibrations on all equipment used for studies. Performed validations on equipment used and wrote qualifing reports based on USP / ISO guidelines. Designed and implemented upgrades to clinical equipment to allow the equipment to meet new standards.

    • Finish Tooling Design Tech\Central Stores
      • Jun 1998 - Nov 2003

      Inventory management. Implementation of Online Electronic Purchasing System. Concept and design of production Travel to Vender/Plant for Tooling process and acceptance Tooling Design Modification and Production support Specification development and process assessments Preventive Maintenance development and implantation Gage development and process repeatability Manage, change and or update PLC driven equipment CAD proficient Customer approvals and sign-off Inventory management. Implementation of Online Electronic Purchasing System. Concept and design of production Travel to Vender/Plant for Tooling process and acceptance Tooling Design Modification and Production support Specification development and process assessments Preventive Maintenance development and implantation Gage development and process repeatability Manage, change and or update PLC driven equipment CAD proficient Customer approvals and sign-off

    • United States
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Fabricator
      • Mar 1997 - Jun 1998

      Setting up jobs for CNC break press (Trumpt V-50, Omata), Mig weld, Shear, Spot weld, De-burr, tap, ream and plane production orders. Grind, D/A, clean and phosphate production orders. Read from prints/set-up orders. Work with calipers and micrometer Setting up jobs for CNC break press (Trumpt V-50, Omata), Mig weld, Shear, Spot weld, De-burr, tap, ream and plane production orders. Grind, D/A, clean and phosphate production orders. Read from prints/set-up orders. Work with calipers and micrometer

  • Electroprime Inc.
    • Toledo, Ohio Area
    • Chemical Applicator
      • Aug 1993 - Mar 1997

      Laboratory testing on all aspects of paint operations Preventative Maintenance on all aspects of paint operations Waste Water Reclamation and disposal General Maintenance of all associated equipment Responsible for all chemical additions to Paint systems Pre-treatment Systems, Boilers, Chillers, D.I. systems and Waste treatment Calibration of all Laboratory equipment Trouble shooting all aspects of paint operations Organizing and controlling labor for cleanouts Data and SPC charting for all paint operations Show less

Education

  • University of Toledo
    Engineering
  • Interlochen Center for the Arts
    Keyboard Instruments, Percussion, Strings & Visual Arts
  • Central Catholic High School
  • Nazareth Hall Military School

Community

You need to have a working account to view this content. Click here to join now