Bruce Genat
Electrical Design Draftsperson at Lehr Consultants International Pty Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
LCI Consultants
-
Australia
-
Design Services
-
200 - 300 Employee
-
Electrical Design Draftsperson
-
Feb 2017 - Present
-
-
-
Waterman AHW
-
Melbourne, Australia
-
Contract Electrical Drafter
-
Oct 2016 - Feb 2017
Electrical building services design drafting Electrical building services design drafting
-
-
-
Ventia
-
Australia
-
Facilities Services
-
700 & Above Employee
-
Contract CAD Designer
-
Jan 2016 - Jun 2016
Design drafting for Telstra Mobile Network site upgrades to LTE700 technology. Design drafting for Telstra Mobile Network site upgrades to LTE700 technology.
-
-
-
CitiPower and Powercor
-
Australia
-
Utilities
-
700 & Above Employee
-
Contract Secondary Design Drafter
-
Aug 2015 - Dec 2015
Design and drafting for protection control cubicles for Geelong East zone substation upgrade & Coonooer Bridge Wind Farm Powercor interface. Use of Autodesk AutoCAD 2014, Raster Design & Autodesk Vault Professional 2016 within the Powercor/Citipower environment. Design and drafting for protection control cubicles for Geelong East zone substation upgrade & Coonooer Bridge Wind Farm Powercor interface. Use of Autodesk AutoCAD 2014, Raster Design & Autodesk Vault Professional 2016 within the Powercor/Citipower environment.
-
-
-
LCI Consultants
-
Australia
-
Design Services
-
200 - 300 Employee
-
Electrical Design Draftsperson
-
May 2013 - Jul 2015
Building Services Drafting & Electrical Design Major Projects worked on: - Epworth Geelong Teaching Hospital - 260 bed 8 level building - Epworth Richmond Pod 4 redevelopment - Monash University Clayton – various electrical infrastructure upgrade projects. - St John of God Hospital Geelong – new ICU / Education building project. - Ravenhall Prision bid submission Building Services Drafting & Electrical Design Major Projects worked on: - Epworth Geelong Teaching Hospital - 260 bed 8 level building - Epworth Richmond Pod 4 redevelopment - Monash University Clayton – various electrical infrastructure upgrade projects. - St John of God Hospital Geelong – new ICU / Education building project. - Ravenhall Prision bid submission
-
-
-
Wood & Grieve Engineers now part of Stantec
-
Australia
-
Construction
-
1 - 100 Employee
-
Contract Electrical Drafter
-
Feb 2013 - Mar 2013
Building Services Drafting - short term contract position Documentation for electrical & security services for the new Victorian Comprehensive Cancer Centre (VCCC) Building Services Drafting - short term contract position Documentation for electrical & security services for the new Victorian Comprehensive Cancer Centre (VCCC)
-
-
-
Aurecon
-
Australia
-
Design Services
-
700 & Above Employee
-
Senior Electrical Drafter
-
Jun 2004 - Nov 2012
Developed preliminary conceptual sketches and design drawings comprising schematics, layouts and detail drawings for electrical services within the heavy industrial, mining plant, oil & gas, and manufacturing areas. This included motor control, instrumentation & control, wiring loop diagrams, PLC I/O diagrams, and hazardous area (potentially explosive) layouts. Power supply systems for infrastructure has involved spatial planning and design for substations and switchrooms, switchboard and MCC layouts along with other ancillary equipment. Drawings were produced using CAD methods and systems for tendering, construction and/or “as built” purposes. I have worked closely with engineering staff to develop electrical design documentation for projects. This has involved development of engineers sketches into design drawings, checking / amending / cross-referencing of schedules and spreadsheets produced by engineers for overall integrity of documentation produced. Show less
-
-
-
Aurecon (Connell Wagner) - Building Services
-
Melbourne, Australia
-
Senior Electrical Drafter
-
Jun 1995 - May 2004
Developed preliminary conceptual sketches and design drawings comprising schematics, layouts and detail drawings for electrical and communication services within buildings. Projects worked on were across a broad range of areas including multi-storey buildings, shopping centres, hospitals, sports stadia, schools, prisons and infrastructure. Drawings were produced using CAD methods and systems for tendering and/or construction purposes. Developed preliminary conceptual sketches and design drawings comprising schematics, layouts and detail drawings for electrical and communication services within buildings. Projects worked on were across a broad range of areas including multi-storey buildings, shopping centres, hospitals, sports stadia, schools, prisons and infrastructure. Drawings were produced using CAD methods and systems for tendering and/or construction purposes.
-
-
-
Mott Connell
-
Civil Engineering
-
1 - 100 Employee
-
Electrical Design Drafter
-
Mar 1993 - Feb 1995
Seconded to Hong Kong to work on the passenger terminal building for their new airport at Chep Lap Kok. Worked on the design of the electrical services for the building as part of a consortium of architects and engineers. Developed design drawings comprising of schematics, layouts and detail drawings. Documentation was produced using Microstation CAD software. Seconded to Hong Kong to work on the passenger terminal building for their new airport at Chep Lap Kok. Worked on the design of the electrical services for the building as part of a consortium of architects and engineers. Developed design drawings comprising of schematics, layouts and detail drawings. Documentation was produced using Microstation CAD software.
-
-
-
Connell Wagner (now Aurecon) - Building Services
-
Melbourne, Australia
-
Electrical Drafter
-
Jun 1989 - Feb 1993
Initially employed to drive the use of CAD software (AutoCAD) within the building services section of the company whilst still very “hands on” in production of electrical services design drawings for projects. Projects worked on were across a broad range of buildings and infrastructure. Drawings were produced using CAD methods and systems for tendering and/or construction purposes Initially employed to drive the use of CAD software (AutoCAD) within the building services section of the company whilst still very “hands on” in production of electrical services design drawings for projects. Projects worked on were across a broad range of buildings and infrastructure. Drawings were produced using CAD methods and systems for tendering and/or construction purposes
-
-
-
Snowy Mountains Hydro-Electric Authority (now Snowy Hydro)
-
Cooma, NSW, Australia
-
Electrical Drafter
-
Mar 1986 - May 1989
Drafting and documentation for refurbishment and upgrade of the high voltage protection system on the Authorities network of transmission lines and switchyards. Introduced CAD software (AutoCAD) to the company including customisation of the software for the company. Drafting and documentation for refurbishment and upgrade of the high voltage protection system on the Authorities network of transmission lines and switchyards. Introduced CAD software (AutoCAD) to the company including customisation of the software for the company.
-
-
-
State Electricity Commission of Victoria (SECV)
-
Melbourne, Australia
-
Cadet Drafter
-
Feb 1981 - Feb 1986
Combined part time drafting work within various departments of the SECV with study for Certificate of Technology Electrical Combined part time drafting work within various departments of the SECV with study for Certificate of Technology Electrical
-
-
Education
-
Swinburne University of Technology
Graduate Diploma, CAD/CAM -
Collingwood TAFE
Certificate of Technology Electrical -
Bell Park High School Geelong
High School