BRIJU KUMAR

Construction Manager at Al Hassanain
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jubail, Eastern, Saudi Arabia, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Primavera project managemnt
    SynergySBS
    Aug, 2021
    - Nov, 2024
  • Civil engineering category B
    The Council for Regulating the Practice of Engineering Professions (CRPEP)
    Aug, 2019
    - Nov, 2024
  • Project Management Professional (PMP)
    Project Management Institute
    Jul, 2022
    - Nov, 2024

Experience

    • Bahrain
    • Construction
    • 1 - 100 Employee
    • Construction Manager
      • May 2018 - Present

      Execution of Civil works & Marine works A) Installation of GRP and HDPE Pipe Line (Dia.-2800mm) 2.5 KM Length, including Casting of concrete Ballast & Intake Tower, Welding work of HDPE Pipe line, dredging work of Trench, Sinking work of HDPE Pipe Line. B) Execution of all Civil works (Marine works) of Wharf including - reclamation works, rock revetment, combi-pile wall with capping beam, four-legged mooring dolphin, stone piling, substation, guard room & Immigration building, fencing etc. c) Dredging work with Marine equipments like dredgers, backhoes, and amphibious excavators to maintain the required depth of the navigation channel and berth pocket. D) Construction of Breakwater using precast concrete blocks, rock armour layer, and geotextile fabric. E) Installation of Navigation Aids like buoys, beacons, and lights to guide the ships safely to the berth. F) Construction of Jetty including piling work, installation of fenders and bollards, and construction of access bridge and gangway. G) Installation of Cathodic Protection System to protect the steel structures from corrosion in the marine environment. H) Construction of Shore Protection Works like revetments, gabion walls, and beach nourishment to protect the shore from erosion and wave action. I) Installation of Marine Fendering System to absorb the energy of the berthing ships and protect the jetty and wharf structures from damage. Show less

    • Spain
    • Oil and Gas
    • 100 - 200 Employee
    • Assistant Manager
      • Oct 2015 - Aug 2017

      Working as an Assistant Manager in B.O.P. area, Responsible for site management of various structure’s • PT Plant & DM Plant building work. • IDCT 48- Cell RCC structured counter flow cooling tower. • Working as a Site Co-coordinator, Responsible for co –coordinating the HO & site PMO – e office (Paperless). Working as an Assistant Manager in B.O.P. area, Responsible for site management of various structure’s • PT Plant & DM Plant building work. • IDCT 48- Cell RCC structured counter flow cooling tower. • Working as a Site Co-coordinator, Responsible for co –coordinating the HO & site PMO – e office (Paperless).

    • India
    • Construction
    • 700 & Above Employee
    • Senior Engineer
      • Jan 2013 - Sep 2015

      • Working as a Senior Engineer for Tall Structure department including 02 No’s Natural Draft Cooling Towers of 150mtr height for West Bengal state Power Development Corporation Ltd. at sagardighi thermal power plant. • Construction of IDCT building 56-cell RCC structured counter-flow cooling tower in NTPC SUPER THERMAL POWER at Gadarwara Madhya Pradesh. • Working as a Senior Engineer for Tall Structure department including 02 No’s Natural Draft Cooling Towers of 150mtr height for West Bengal state Power Development Corporation Ltd. at sagardighi thermal power plant. • Construction of IDCT building 56-cell RCC structured counter-flow cooling tower in NTPC SUPER THERMAL POWER at Gadarwara Madhya Pradesh.

    • India
    • Construction
    • 700 & Above Employee
    • Site Engineer
      • Jun 2009 - Dec 2012

      • Responsible for execution work of Natural Draft Cooling Tower (NDCT 170 mtr ) basin raft, pedestal, raker column, shell up to 170 mtr, internal columns, cold water duct and other structure. •Responsible for chimney construction, fabrication and erection work for 270mtr height. •Responsible for Procurement of required Materials at site. Undertake preparing bar bending schedule and execute as per detail drawing. Maintaining Material, cement and steel consumption report. Maintaining the quality of work at site. Completing all paper work & billing work & documentation, RCC work specification. Supervision of site with wide responsibilities and interaction with contractors. • Having extensive knowledge of Jump from Shuttering and Bierrum type jump form NDCT shell construction work. • Worked from excavation to handing over to client, including planning, Execution and billing with client and Subcontractor. Show less

Education

  • National Institute of Construction Management & Research (NICMAR)
    Post graduation, Construction Management
    2014 - 2017
  • SSBT'S COLLEGE OF ENGINEERING & TECHNOLOGY, BAMBHORI.
    Bachelor of Engineering - BE, Civil Engineering
    2005 - 2009

Community

You need to have a working account to view this content. Click here to join now