Brian Flynn, PE, LEED AP
Founding Principal at Z&F Consulting, Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Z&F Consulting, Inc.
-
United States
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Founding Principal
-
Jan 2001 - Present
Project Expertise: • Broad knowledge of cGMP compliance• Solid Oral Dosage: Granulating, Blending, Fluid Bed Drying, & Coating• Aseptic Manufacturing: Filling, Packaging, Inspection, Lyophilization, Sterilization, Fermentation & Purification• Laboratory Design: Research & Development, Bio-Science, BSL3 and Analytical Testing• Cogeneration Plant Design• Process and Building Automations Systems• Estimating & Construction Management• Building Evaluations for cGMP compliance & master planning• High Pressure Steam Boilers and Distribution• Central Utility Plant Design
-
-
Expert Witness
-
Jan 2010 - Present
Mr. Brian Flynn has served as an expert witness providing Forensic Engineering and Retro Commissioning analyses and testimony on a broad variety of cases. (Selected)- Philadelphia, PAMr. Flynn provided expert witness testimony and forensic engineering analysis on behalf of the defendant concerning a multi-million dollar claim for substandard HVAC system design. Although Mr. Flynn concluded that there were design deficiencies, he was capable of offering a design solution for the problems at a fraction of the cost of the claim. - BermudaThe Owner of a 5-star resort (and many others) on the island of Bermuda had a significant history of receiving a final product that failed to meet his expectations. Mr. Flynn and a team of Z&F staff identified numerous problems and for the first time, and the client was able to negotiate a satisfactory settlement with the installation contractors and make corrective actions to improve the MEP systems performance.- IdahoMr. Flynn provided forensic engineering analysis and expert witness testimony on behalf of a new hospital which was experiencing deficiencies in the HVAC and humidification systems. The project was a new acute care medical facility. The parties are using the information to reach a settlement.- New JerseyMr. Flynn provided forensic engineering analysis and retro commissioning services to a party experiencing deficiencies in the HVAC system’s operation. Z&F provided a full report of the problems. The case is awaiting final resolution.
-
-
Education
-
Stevens Institute of Technology
BSME, Mechanical Engineering