Brett McDonald

SMP Supervisor at Alfabs Group of Companies
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Newcastle Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Agriculture, Construction, Mining Machinery Manufacturing
    • 1 - 100 Employee
    • SMP Supervisor
      • Jun 2019 - Present

    • Australia
    • Engineering Services
    • 1 - 100 Employee
    • Site Supervisor
      • Apr 2018 - Jun 2019

  • Varley Group
    • Carrington
    • Leading Hand Boilermaker
      • May 2017 - Apr 2018

      Fabrication and Fit out of Prisoner Transport Vehicles for NSW Correctional services Fabrication and Fit out of Prisoner Transport Vehicles for NSW Correctional services

  • Downer
    • Port Waratah Coal Services - Carrington Terminal
    • Leading Hand Boilermaker
      • Jul 2016 - May 2017

      Construction and Commissioning of 2 Ship Loaders Deconstruction of 3 existing Ship Loaders Supervise Afternoon Shift Crew Construction and Commissioning of 2 Ship Loaders Deconstruction of 3 existing Ship Loaders Supervise Afternoon Shift Crew

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Boilermaker
      • Nov 2014 - Jun 2016

      • Construction of 6 Tanks (1 Utility water, 1 Raw water, 1 Pure Amine, 1 Glycol, 1 Acid, 1 Demin water) to specification API650• Fit out all tanks with door sheets, nozzles, sumps, platforms, stairways, handrails and pipe supports.• Structural steel modifications site wide.• X-ray quality stick welding of Carbon and Stainless Steel.• X-ray quality welding of Carbon Steel with LN25 wire feeder.

    • Boilermaker
      • May 2014 - Oct 2014

      • Construction of Double walled fully cryogenic LNG Tank including fitment of nozzles, bellows, pump tubes, bracing and supports to specification API620.• Fit out of LNG Tank suspended roof including aluminium sleeves and stainless steel pipework and bracing.• LNG Tank monorail modifications• Installation of Nickel floor• Installation and fit out of pump tubes platforms• X-ray quality stick welding of carbon and nickel.

    • Leading Hand Boilermaker
      • Jul 2013 - May 2014

      • Conveyer and chute upgrades for Newcastle Coal Terminal • Fabricate and stick weld medium and heavy structural components to modify, repair and upgrade coal terminal machines as per ‘punch list’ requirements including: • Handrail modifications • Guardrail Installations • Platform modifications and installations • Major works including - yard conveyor drive coupling change out - shiploader spout bearing change out - stacker/reclaimer bucket wheel drive change out - stacker/reclaimer elevator drive change out - stacker /reclaimer head chute pulley change out • Initiate design and construction of a safety component used to safeguard against hazardous projectiles during module change outs Show less

    • Sweden
    • Mining
    • 700 & Above Employee
    • Leading Hand Boilermaker
      • May 2011 - Jun 2013

      Lead and work with a team of tradespeople to construct new coal stackers. Work within high safety standards to deconstruct obsolete coal stackers. Fabricate and weld various components for coal stackers and reclaimers. Lead and work with a team of employees and contractors to dry and live commission new coal stackers. Work in difficult situations such as heights and confined spaces. Communicate with transport companies to safely mobilise coal stacker and reclaimer components. Manage various shut downs and night work projects. Show less

  • Daracon
    • Kooragang Island
    • Leading Hand Boilermaker
      • Oct 2009 - May 2011

      Lead and coordinate a team of employees to complete dredge work project. Various fabrication and welding repairs and modifications to plant and machinery. Adhere to strict safety guidelines. Numerous civil work jobs such as asphalting, concreting, erection of guard rail, erection of hand rail, erection of site sheds etc. Lead and coordinate a team of employees to complete dredge work project. Various fabrication and welding repairs and modifications to plant and machinery. Adhere to strict safety guidelines. Numerous civil work jobs such as asphalting, concreting, erection of guard rail, erection of hand rail, erection of site sheds etc.

    • Australia
    • Construction
    • 700 & Above Employee
    • Leading Hand Boilermaker
      • Apr 2009 - Oct 2009

      Lead and work with a group of tradespeople to safely and efficiently deconstruct obsolete coal stackers. Lead and work with a group of tradespeople to safely and efficiently deconstruct obsolete coal stackers.

Education

  • Saint Francis Xavier

Community

You need to have a working account to view this content. Click here to join now