Brett Kortum

Civil Engineer at MBB Consulting Pty Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Melbourne Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Business Consulting and Services
    • 1 - 100 Employee
    • Civil Engineer
      • Sep 2021 - Present

      Projects and Roles undertaken while being part of MBB consulting include CPBJH JV - West Gate Tunnel - SEPA Interface Co-Ordinator Working with CPBJH Construction teams & South East Program Alliance to investigate opportunities to allow SEPA to perform works within and around WGT project area to ensure minimal disruptions to both project timelines Rail Projects Victoria - Geelong Fast Rail - Early Engagement - Utilities Senior Project Manager. Assessment and determination of impacted utilities for the construction of the Geelong Fast Rail Downer - Western Port Highway Upgrade - Utilities Manager. Managing the relocation of Comms, Power, Gas, Water & Sewer as well as overseeing the installation of public lighting and traffic signals Rail Projects Victoria - Melbourne Airport Rail - Early Works - Specialist Utilities Consultant. Assisting with design and consultation with the utility service providers for Water, Sewer & Gas assets

    • Australia
    • Construction
    • 200 - 300 Employee
    • Senior Project Engineer
      • Oct 2019 - Sep 2021

    • Australia
    • Civil Engineering
    • 1 - 100 Employee
    • Project Engineer
      • Jun 2017 - Sep 2019

    • Australia
    • Construction
    • 200 - 300 Employee
    • Project Engineer
      • Aug 2016 - May 2017

    • Project Engineer
      • Sep 2014 - Jul 2016

      Construction of Noise Walls and Steel Structures. Dealing with all aspects from planning & procurement through to management of progress claims and dealing with all client issues. Geelong Ring Road - Corten panel noise walls, freestanding and on barriers Dingley Bypass - Metal Sheeting noise walls, freestanding and on barriers Bloomdate Estate, Diggers Rest - Corten Noisewall, freestanding Wallara Waters Estate, Wallen - Corten Noise wall, freestanding Port of Melbourne - Corten Noisewall, Freestanding Port of Melbourne - Reefer Towers - Steel structure to access refrigerated containers when stacked up to 4 containers high Tulla Freeway Widening - Concrete Panel Noisewalls

    • Australia
    • Civil Engineering
    • 1 - 100 Employee
    • Project Engineer
      • Jun 2014 - Jul 2014

      Kalgoorlie-Boulder Airport - Taxiway C Partial RebuildExcavate existing taxiway material, lime stabilize sub grade material, construct sub base and base layers and a 7/10 spray seal. Small amounts of hydro seeding and turf reinforcement matting placed along with the construction of open drains and 30m of 525 RCP and a 1.5m storm water pit.

    • Project Engineer
      • Apr 2014 - May 2014

      ACT Road Batter Stabilization - Removing overhanging/unstable material from roadside areas. Installation of a small amount of guardrail and rock catch fence.

    • Australia
    • Civil Engineering
    • 1 - 100 Employee
    • Project Engineer
      • Aug 2013 - Dec 2013

      Bridge & Channel Protection Works - Installation of rock gabion and rock mattress protection to 12 different bridge and culverts. Including works in environmentally and culturally sensitive areas.

    • Project Engineer
      • May 2013 - Jul 2013

      Slope Rehabilitation Works - Installation of rock anchors and rock mesh on eroded road cutting, excavation of eroded section of additional slope and installation of erosion control matting and drainage

    • Australia
    • Civil Engineering
    • 1 - 100 Employee
    • Project Engineer
      • Jan 2012 - Jan 2013

      - Wagga Wagga Airport, NSW $7M Construction of approximately 18000m2 taxiway and apron pavements (subbase, base and asphalt), additional car parks, roadways, storm water drainage network, small sewer and water main.

    • Site Engineer
      • Oct 2011 - Jan 2012

      - Wujal Wujal Main Contract, QLD $3M Oct 11 - Mar 12600m of Road including 3 concrete causeways and 1 culvert crossing. 2.1km 150 DICL Water Pipeline. Various works for the upgrade of the Water Treatment Plant including telementry controls and epoxy coating of existing storage tank

    • Australia
    • Construction
    • 1 - 100 Employee
    • Undergraduate/Site Engineer
      • Oct 2007 - Sep 2011

      Areas I have had experience in while being a site engineer are; Quality Assurance Safety Procurement Forcasting Supervision of works Document Preparation Tendering Projects completed include; - Cowangs to Bauloora Pipeline Replacement, NSW, 12M 29km of DICL pipe work ranging from DN375 to DN600 including 13 bores under road & rail - Iron Baron Ore Beneficiation Project, Whyalla SA, 12M Bulk earthworks including roads & storage pads, multiple concrete structures totaling approximately 3000m3 of reinforced concrete, several services lines including water and communications and a HDPE dam lining. - Ballarat South Outfall Sewer, Vic, 4M 2.6km of gravity sewer approximately 4m deep with 36 manholes ranging from 1.5m to 3m in diameter. 1.9km of DN750 SewerPRO, 0.7km of DN900 SewerPRO. 12 bores under creeks & roadways. - Pykes Creek Dam Upgrade, Vic, 4M Works included stripping the downstream embankment and rebuilding it with 25,000m3 of rock sourced and crushed onsite. It also included a 30m reinforced concrete spillway, a 2m extension to the existing spillway training wall and a stormwater bore underneath the Western Freeway. - Goldfields Superpipe (North/Centre Sections), Bendigo to Ballarat Section, Vic, 17.5M 50km DN750mm MSCL and DICL pipe work including 12 Bored Crossings under road, rail and waterways In addition to the above projects I have briefly worked on projects involving Post Stressed Concrete tanks and water treatment plants.

Education

  • La Trobe University
    Bachelor of Civil Engineering
    -

Community

You need to have a working account to view this content. Click here to join now