Brett Evans

Project Manager, Materials Engineer at AllRock Consulting Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
St John’s, Newfoundland and Labrador, Canada, CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Canada
    • Civil Engineering
    • 1 - 100 Employee
    • Project Manager, Materials Engineer
      • Mar 2021 - Present

    • Materials Engineer, Laboratory Manager
      • Jun 2018 - Feb 2021

    • Canada
    • Design Services
    • 700 & Above Employee
    • Materials Engineer in Training
      • Jun 2013 - Jun 2018

      - Materials Engineer in Training.- Concrete testing on various construction sites all over the province of Newfoundland & Labrador.- Monitored the construction of roadways by approving subgrade and granular compaction, as well as asphalt testing.- Worked in a laboratory setting for quality control of soil grain analysis and concrete compressive strength. - Materials Engineer in Training.- Concrete testing on various construction sites all over the province of Newfoundland & Labrador.- Monitored the construction of roadways by approving subgrade and granular compaction, as well as asphalt testing.- Worked in a laboratory setting for quality control of soil grain analysis and concrete compressive strength.

    • Canada
    • Design Services
    • 700 & Above Employee
    • Civil Work Term Student
      • Aug 2012 - Dec 2012

      - Work term 5 Student.- Conducted quality control tests on the Sandy Pond Residue & Storage Area for the Long Harbour Processing Plant Project & for Pennecon Heavy Civil LTD.- Performed subgrade and backfill tests on various locations throughout the Long Harbour site and locations within St. John’s and surrounding area. - Work term 5 Student.- Conducted quality control tests on the Sandy Pond Residue & Storage Area for the Long Harbour Processing Plant Project & for Pennecon Heavy Civil LTD.- Performed subgrade and backfill tests on various locations throughout the Long Harbour site and locations within St. John’s and surrounding area.

    • Civil Work Term Student
      • Aug 2011 - Dec 2011

      - Work term 3 student with the highway design division.- Developed an intersection to connect two subdivisions in the town of Paradise to the Trans Canada Highway.- Used AutoCAD to develop horizontal and vertical profile views for the potential highway. - Work term 3 student with the highway design division.- Developed an intersection to connect two subdivisions in the town of Paradise to the Trans Canada Highway.- Used AutoCAD to develop horizontal and vertical profile views for the potential highway.

Education

  • Memorial University of Newfoundland
    Bachelor of Engineering (B.Eng.), Civil Engineering
    2006 - 2013
  • Conrad Fitzgerald Academy
    1993 - 2006

Community

You need to have a working account to view this content. Click here to join now