Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Mechanical Superintendent
      • Jun 2022 - Present
    • Field Engineer
      • Jun 2020 - May 2022

      The scope of work involves installing solar farms from start to finish. During my time with the company I have been with the civil and mechanical side of the install process. • Collect and verify data for reports such as plan of day forms, weekly reports, three week look ahead, and schedule updates; these reports are then sent to members of upper management and the customer • Acquire quotes from subcontractors to then identify the best option that meets the projects needs • Aided in the process of developing the proper ramp up and ramp down of employees and equipment o This detailed plan aids the team in knowing when labor and equipment is needed on site to meet the necessary production • Establish daily production goals for the team to meet scheduled completion dates based on our current progress • Populating the proper forms to acquire the tools, material, equipment and the workforce needed to complete the project (Procurement Request Form, Requisition Form, Equipment Request / Call Off Form) • Created staging maps for the material, these aid the crews to position the material in the optimum location for installing the tracker system. • Address conflicts and questions from crew members that arise during the day to aid production • Conducted time studies to identify the areas in the install process that need improvement • Perform walkdowns of the final product to verify quality and ensure the system is being installed properly

    • United States
    • Farming
    • Farm Hand
      • 2004 - 2022

      Tended to the livestock by feeding them daily, laying down bedding, and administering vaccinations when appropriate. Operated/maintained farm equipment from the combine, loader, four-wheeler drive and front wheel assist. Maintained crops for maximum yield by spraying for weeds/bugs and fertilizing the field properly. Transported grain from the field to the elevator via semi and grain trailer. Tended to the livestock by feeding them daily, laying down bedding, and administering vaccinations when appropriate. Operated/maintained farm equipment from the combine, loader, four-wheeler drive and front wheel assist. Maintained crops for maximum yield by spraying for weeds/bugs and fertilizing the field properly. Transported grain from the field to the elevator via semi and grain trailer.

    • United States
    • Utilities
    • 1 - 100 Employee
    • Project Engineer
      • May 2018 - Aug 2019

      The project involved converting two coal fired boilers to natural gas to meet the new standards set by the Environmental Protection Agency. I filled the position of Project Engineer for pre-construction, construction, commissioning, and project close-out of the $65 million Muskogee Power Plant Gas Conversion Project. This involved organizing and administering safety orientations for up to 20 new onsite contractors daily during construction. Reporting daily progress of construction activities to project team members and upper management. I was responsible for requesting and acquiring daily headcounts, plan of day forms, and time sheets from each contractor. Reviewing and updating the construction punchlist with the general contractor's site foreman. Resolving contractors' technical issues with project design and requests for information. I led daily construction meetings with project team and contractors to establish the work for the day. I communicated construction logistics and safety items with plant operations. Led efforts for project change management with alterations to technical work scope.

    • United Kingdom
    • 1 - 100 Employee
    • Maintenance Engineer
      • May 2017 - Aug 2017

      I was a preventative maintenance engineer in the autoclave. This involved monitoring the autoclaves inner layers for wear in efforts to appropriately schedule maintenance. Developing reports from the autoclaves' temperature to track trend lines on normal operating temperatures. Reporting on data from the autoclaves in weekly meetings to preventative maintenance team members. This all led to presenting on different methods to monitor the autoclaves in real time to propose future projects. I was a preventative maintenance engineer in the autoclave. This involved monitoring the autoclaves inner layers for wear in efforts to appropriately schedule maintenance. Developing reports from the autoclaves' temperature to track trend lines on normal operating temperatures. Reporting on data from the autoclaves in weekly meetings to preventative maintenance team members. This all led to presenting on different methods to monitor the autoclaves in real time to propose future projects.

    • United States
    • Construction
    • Employee
      • May 2015 - May 2016

      Constructed sheds from the ground up in shop and also on site from kits. Worked in sales and customer relations to ensure that customers received a good quality shed that met their specifications. Constructed sheds from the ground up in shop and also on site from kits. Worked in sales and customer relations to ensure that customers received a good quality shed that met their specifications.

    • United States
    • Hospitals and Health Care
    • High School Intern
      • Jan 2014 - Apr 2014

      Learned what the company was about and how they operated. Worked on extending a sewer system for a town by designing the layout for the new sewer system while making sure that the size and angle of the pipe was correct. This also involved working in the field to map out the location of a new pipe that was going to be installed. Learned what the company was about and how they operated. Worked on extending a sewer system for a town by designing the layout for the new sewer system while making sure that the size and angle of the pipe was correct. This also involved working in the field to map out the location of a new pipe that was going to be installed.

Education

  • South Dakota School of Mines and Technology
    Engineer’s Degree, Mechanical Engineering
    2014 - 2020

Community

You need to have a working account to view this content. Click here to join now