Brent Mr Gatecliff

Owner/Managing Partner at BCG Properties, LLC
  • Claim this Profile
Contact Information
Location
Waterford, Michigan, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Bill Gutherie

Brent is a true professional in both his personal and professional worlds. You will not be let down by placing your trust with this man.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • 1 - 100 Employee
    • Owner/Managing Partner
      • Dec 2009 - Present

      After having the pleasure of servicing the industry as an employee for some the best names in the industry and as an Owner for Pipe Systems, Inc for over 20 years or a total of 34 years in the Industry, I sold the company and “Retired”. I enjoyed servicing our many various clients and customers over the years, but I really enjoyed enriching the lives of the employees of Pipe Systems Inc through their salaries, bonuses, Health Insurance, Benefits, Pension Plans and 401K’s. After having the pleasure of servicing the industry as an employee for some the best names in the industry and as an Owner for Pipe Systems, Inc for over 20 years or a total of 34 years in the Industry, I sold the company and “Retired”. I enjoyed servicing our many various clients and customers over the years, but I really enjoyed enriching the lives of the employees of Pipe Systems Inc through their salaries, bonuses, Health Insurance, Benefits, Pension Plans and 401K’s.

    • United States
    • Construction
    • 1 - 100 Employee
    • Owner
      • Jan 1994 - Aug 2023

      Pipe Systems, Inc. is a Mechanical and Service Contractor that strives; to provide its customers state of the art installations, to complete projects within a specified time frame and to offer value added solutions. This is accomplished through: •Committing its efforts and processes to pre-planning in the selection of materials, methods, and sequencing to ensure cost effective projects and services. •Listening to its customers, subcontractors, suppliers and co-workers to develop and maintain a clear understanding of their needs. •Maintaining an atmosphere that encourages teamwork, training, listening and an evolution of processes and systems that promote proactive problem solving. Pipe Systems, Inc. is committed to meeting or exceeding its customer’s expectations. Pipe Systems, Inc. develops and maintains an attitude conducive to obtaining this goal. Pipe Systems, Inc.’s customer’s lowest cost and our greatest profits are achieved through prevention, not in discovery and correction. Show less

    • Brazil
    • Construction
    • 1 - 100 Employee
    • Project Manager
      • Jul 1993 - Dec 1994

      212 MW Co-generation power plant which was designed, engineered, constructed and was owned and operated by DEI. • Created, reviewed two week look ahead and monitored all subcontractor schedules using Primavera Scheduling. • Project completed on time and under budget, achieving all contractual allowable bonuses. • In charge of scheduling, cost reporting, contract interpretation, meeting coordination, start-up activities, document control, staff supervision. • $220,000,000.00 Contract 212 MW Co-generation power plant which was designed, engineered, constructed and was owned and operated by DEI. • Created, reviewed two week look ahead and monitored all subcontractor schedules using Primavera Scheduling. • Project completed on time and under budget, achieving all contractual allowable bonuses. • In charge of scheduling, cost reporting, contract interpretation, meeting coordination, start-up activities, document control, staff supervision. • $220,000,000.00 Contract

    • PROJECT MANAGER
      • Jan 1990 - Jun 1993

      January 1993 - June 1993 Project Trouble Shooter and Start-up and Commissioning Manager. • 4MW Co-generation power plant owned by Burroughs Wellcome Co., located in Greenville, North Carolina. • $4,000,000.00 Project. June 1991 - December 1992 Project Manager • 60MW Co-generation Power Plant owned by CETLP at Fort Orange Paper, located in Castelton-on-Hudson, NY • Completed ahead of schedule & under budget • $41,000,000.00 contract. January 1990 - June 1991 Project Manager • 65MW Co-generation Power Plant owned by Kamine Besi Corp. at James River Paper, located in Carthage, New York. • Performed all purchasing of major equipment and subcontractors. • $54,000,000.00 contract. Major accomplishments at CNFC • Earned $990,000 early completion bonus for Fort Orange, New York • Earned $500,000 heat rate bonus for successful completion on time and with above average construction and engineering for Fort Orange, New York. • Developed and implemented Project Manager approval process for subcontractors and major equipment vendors greatly reducing double and overpayment errors. Show less

    • United States
    • Wholesale Building Materials
    • PROJECT MANAGER/PURCHASING AGENT
      • Jan 1984 - Dec 1989

      • Project Manager responsible for managing all requirements for profitable completion of multiple mechanical projects simultaneously (billings at approximately $4 million annually). • Served as the purchasing agent in addition to Project Manager responsibilities for last year. • Project Manager responsible for managing all requirements for profitable completion of multiple mechanical projects simultaneously (billings at approximately $4 million annually). • Served as the purchasing agent in addition to Project Manager responsibilities for last year.

    • PROJECT MANAGER
      • Jan 1980 - Dec 1983

      $700,000 Wastewater treatment plant for the City of Detroit, MI $22,600,000 Wastewater treatment plant for the City of Kalamazoo, MI $6,500,000 Wastewater treatment plant, incinerator modification for Battle Creek, MI $700,000 Wastewater treatment plant for the City of Detroit, MI $22,600,000 Wastewater treatment plant for the City of Kalamazoo, MI $6,500,000 Wastewater treatment plant, incinerator modification for Battle Creek, MI

    • CHEMICAL ENGINEER
      • May 1977 - Jan 1980

      Analytical Research Technician Operator-Membrane Filter Press Worked on the Team that created water soluble Hydraulic cutting fluids and water soluble Anti-Corrosion based Anti-Freezes. Operator of Electron Beam Microscope. Analytical Research Technician Operator-Membrane Filter Press Worked on the Team that created water soluble Hydraulic cutting fluids and water soluble Anti-Corrosion based Anti-Freezes. Operator of Electron Beam Microscope.

Education

  • Central Michigan University
    Chemisty/Biology
    1976 - 1978
  • University of Michigan-Dearborn

Community

You need to have a working account to view this content. Click here to join now