Borja Valero Polo

Head of Project Delivery at Masdar (Abu Dhabi Future Energy Company)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United Arab Emirates, AE
Languages
  • Inglés Full professional proficiency
  • Francés Professional working proficiency
  • Español Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Jose Florez Sarmiento

Borja tiene unas aptitudes excepcionales para los puestos específicos de proyect manager que ocupa. Se centra en lo importante, no pierde el tiempo, es diplomático y negociador al mismo tiempo. A nivel de contratos entre developers y EPC contratas es un experimentado profesional. Además es respetuoso con el trabajo de los demás.

Mike Skov

Borja successfully leveraged his prior experience at TIC into a successful partnership that added value to construction projects. I was most impressed with Borja's professionalism, his thoroughness, and his attention to detail.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Renewable Energy Semiconductor Manufacturing
    • 400 - 500 Employee
    • Head of Project Delivery
      • Jan 2021 - Present

    • Sr Project Manager
      • Dec 2016 - Jan 2021

      Sr Project Manager responsible for the DEWA 800 MW PV Project phase III in Dubai

    • CEO of Shuaa Energy 2
      • Mar 2020 - May 2022

      Managing the 800 MW PV Plant in MBR Solar park, Dubai, currently in operation. Managing the 800 MW PV Plant in MBR Solar park, Dubai, currently in operation.

    • Vice President of Construction and Project Management
      • Oct 2009 - Dec 2016

      Execution of large scale solar (concentrating solar thermal power (CSP) and photovoltaic power plants (PV)) power plants developed by SolarReserve in Spain, South Africa and the MENA region. Assisting business development and in charge of execution.More than 3.1 GW of concentrating solar thermal power (CSP) in development globally• Lead 110 MW project in operations – Crescent Dunes project in Tonopah, Nevada• 100 MW Redstone project in South Africa to commence construction in 2016• Late-stage development activities represent almost 1000 MW of fully permitted projectsMore than 3.9 GW of photovoltaic power plants in Development Globally• 246 MW in operation in South Africa• Successfully awarded seven power contracts in North and Central America totaling 150 MW• Development projects in a dozen other countries

    • EPC Project Director
      • Nov 2006 - Oct 2009

      Engineering, Procurement and Construction (EPC) Project Director in the area of water treatment and energy.BOO trigeneration plant in Barcelona with a H&C District net, a desalination plant in Murcia with a 24 km net of collectors and the technical project development during the permitting phase of two 50 MW Parabolic trough power plants near Sevilla. Engineering, Procurement and Construction (EPC) Project Director in the area of water treatment and energy.BOO trigeneration plant in Barcelona with a H&C District net, a desalination plant in Murcia with a 24 km net of collectors and the technical project development during the permitting phase of two 50 MW Parabolic trough power plants near Sevilla.

    • Spain
    • Utilities
    • 700 & Above Employee
    • Project Manager for Industrial Plants
      • May 2002 - Nov 2006

      Site manager in the construction of the 400 MW Santurce Iberdrola’s Combine Cycle Power Plant working for the Engineering, Procurement and Construction contractorProject Manager during the financial closure for two (100.000 m3/day & 200.000 m3/day) desalination plants in Algeria (BOO contract)Responsible for business development in the US for energy and water projects Site manager in the construction of the 400 MW Santurce Iberdrola’s Combine Cycle Power Plant working for the Engineering, Procurement and Construction contractorProject Manager during the financial closure for two (100.000 m3/day & 200.000 m3/day) desalination plants in Algeria (BOO contract)Responsible for business development in the US for energy and water projects

    • TIC - The Industrial Company
      • Jun 1999 - May 2002

      Field Engineer for the electromechanical erection for the power train at the Ennis (Tx) Tractebell Combined Cycle Power PlantClient Project Supervision for the Nogales (Sonara) Ductos de Nogales Gas duct. Field Engineer for the electromechanical erection for the power train at the Ennis (Tx) Tractebell Combined Cycle Power PlantClient Project Supervision for the Nogales (Sonara) Ductos de Nogales Gas duct.

    • Spain
    • Renewable Energy Semiconductor Manufacturing
    • 700 & Above Employee
    • Project Controls
      • Feb 1998 - Jun 1999

      Cost controls and scheduling for the electromechanical erection of the CFE Rosarito Simple Cycle Power Plant in Baja California, working for the Engineering, Procurement and Construction contractor Cost controls and scheduling for the electromechanical erection of the CFE Rosarito Simple Cycle Power Plant in Baja California, working for the Engineering, Procurement and Construction contractor

Education

  • IESE Business School - University of Navarra
    Global Executive MBA, MBA
    2014 - 2015
  • ETSI Caminos Canales y Puertos
    Ingeniero de Canales Caminos y Puertos, Hidraulica y Energia
    1990 - 1997
  • Universidad Politécnica de Madrid
    Ingeniero Tecnico Superior de Caminos, Canales y Puertos, Hidraulica y energía
    1990 - 1997

Community

You need to have a working account to view this content. Click here to join now