Boopathy Selvaraj

Project Engineer at Tiger Steel Engineering L.L.C.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Dubai, United Arab Emirates, AE
Languages
  • English Full professional proficiency
  • Tamil Native or bilingual proficiency
  • Hindi- Read and Write Limited working proficiency
  • Malayalam Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Construction
    • 300 - 400 Employee
    • Project Engineer
      • Jul 2022 - Present

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • Project cordinator
      • Oct 2018 - Present

      Generating new enquiry Follow up with customer and requesting for the status of quotation Estimation and RFQ Preparing RFI Cordinating with Engineering, fabrication, procurement department from signing the contract to delivery of the material Generating new enquiry Follow up with customer and requesting for the status of quotation Estimation and RFQ Preparing RFI Cordinating with Engineering, fabrication, procurement department from signing the contract to delivery of the material

    • United Arab Emirates
    • Fabricated Metal Products
    • 300 - 400 Employee
    • Design Engineer
      • Jan 2016 - Oct 2018

       Project Co-ordination (liaise with Procurement, Engineering, Production, Site, Billing and client Follow-ups, Monitoring Project Budget Etc.) Design of steel connections for power plant for Refinery structures & power plant structures Managing projects from conception, pre-production through to completion Providing corresponding design calculation report for PE & EOR approval Reviewing the contract details Preparation of technical RFI's (Request for Information). As a Coordinator and Engineer for connection design team for below mentioned Steel Structural Preparing Connection Design using LIMCON ,Hilti PROFIS, MATHCAD,IDEA static, In-house developed MS Excel Preparation of Design calculations for the Steel Connections such as Moment connection, Shear connections, and Base plate connections, Brace connections, Steel to Concrete connections. Preparing change order in case of revision in design drawings. Raising technical queries to client & attending meetings with client Show less

    • Junior Designer
      • Aug 2014 - Dec 2015

       Drafting of connection in AutoCAD and Issuing to Detailing team Supervising and managing schedule of Tekla Detailing Team. Clearing Query from Detailing team Checking Structural General Arrangement drawings for Client Approval Checking of shop drawings as per Engineering drawings Coordinating with Clients, Drawing office, Fabrication shop & erection team to achieving the target. Track the project through project engineer and raise variation if required

    • India
    • Construction
    • 100 - 200 Employee
    • Junior Engineer
      • Nov 2011 - Apr 2014

      Had an great opportunity to learn basics of Structural knowledge in Detailing and Design department  Preparing MTO models & Applying Connection using Tekla structures  Generating fabrication drawing and GA drawing  Shop & Site coordination  To generate accurate BOQ / Schedule of Materials.  Prepare and issue Costing sheet/Budget to Finance and Accounts to track the project cost Had an great opportunity to learn basics of Structural knowledge in Detailing and Design department  Preparing MTO models & Applying Connection using Tekla structures  Generating fabrication drawing and GA drawing  Shop & Site coordination  To generate accurate BOQ / Schedule of Materials.  Prepare and issue Costing sheet/Budget to Finance and Accounts to track the project cost

Education

  • Hindusthan College of Engineering and Technology
    Bachelor of Engineering (BE), Mechanical Engineering
    2007 - 2011
  • Palaniammal Higher Secondary School
    High School/SecondarySchool
    2001 - 2007

Community

You need to have a working account to view this content. Click here to join now