Bonnie Scarfe

Unemployed at Looking for a new position
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Saskatoon, Saskatchewan, Canada, CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

George Varghese

From 2007 to 2011, I had to work closely with Bonnie in her roles in supporting QA, Construction Engineering and Document Management functions. I would recommend Bonnie to be a hardworking, process oriented team player, earnest to seek how she can contribute effectively to your project.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Advertising Services
    • 1 - 100 Employee
    • Unemployed
      • Jun 2023 - Present
    • Canada
    • Taxi and Limousine Services
    • 1 - 100 Employee
    • Quality Control
      • Aug 2015 - Jun 2023
    • Canada
    • Construction
    • 1 - 100 Employee
    • Administrator
      • Dec 2014 - Jun 2023

    • Quality Control/Quality Assurance
      • Jan 2015 - Aug 2015

    • Quality Control Coordinator
      • Feb 2014 - Dec 2014
    • United States
    • Construction
    • Quality Control Coordinator
      • Jul 2013 - Jan 2014
    • 1 - 100 Employee
    • PDDM ANALYST/TECHNICIAN
      • Apr 2011 - Jul 2012

      (PRINCIPAL DOCUMENT AND DATA)Western Canada Mining Project Fluor CMT - Kearl Oil Sand ProjectFort McMurray, Alberta – Remote Site• Maintained and updated all required Distribution Matrices used onsite• Assisted site personnel with Engineering drawings requests andenquires• Developed and Maintained a library of Engineering drawings anddocuments for use by site personnel• Issued Engineering Documents/ Transmittals and requesteddrawings and to site• Developed an audit process for site PDDM (Project Documentand Data Management)• Conducted quarterly audits on document controls within majorwork areas• Processed and uploaded Engineering Documents to ProArc(Fluor PDDM Data Management system)• Processed and uploaded Contract Management Documents,Requests for Information, Specification Deviation Request, Non-Technical Documents and Mod Yard Lift Plans to ProArc• Performed ProArc audits to ensure all information is current andrecorded correctly• Created and Maintained technical logs and reports• Performed special projects as directed by the PDDM Lead• Proficient in the use of the following applications: Adobe Pro,Bulk Upload and Rename utility program, Microsoft Office,ProArc, Projects On Line (POL), Lotus Notes, Document Manager(DM) (DMS used by Imperial Oil), Fusion and Convero (DMS andweb interface application used by AMEC), FTP site (AMEC),Citrix, WS FTP PRO1 Show less

    • QUALITY TECHNICIAN CMT
      • Aug 2010 - Apr 2011

      (CONSTRUCTION ENGINEERINGAIDE III)Western Canada Mining Project Kearl Oil Sand ProjectFort McMurray, Alberta – Remote Site• Created, populated, and maintain a central Quality Non ConformanceReport (NCR) Log and Tracking System for the entire work site.• Created a secure file to contain the Quality Non Conformance Report(NCR) Log for ease of access for senior management.• Attended Weekly Quality Management meetings to report status ofopen Non Conformance Reports to all Quality Managers• Maintained continued with the Quality Managers regarding timelyclose out of the Non Conformance Reports (NCRs) in their area.• Assisted Lead Auditor in planning, scheduling, and preparing forQuality Audits• Performed a Quality Audit as a member of the audit team.• Participated in continuous training programs with instruction inQuality Auditing Practices• Obtained Certification in the Fluor “News” program for tracking andrecording welding progress and overall status• Obtained Certification in Excel Spreadsheets• Developed and distributed Quality Summary reports to Senior ProjectManagement. Show less

    • QUALITY ASSURANCE TECHNICIAN
      • Mar 2009 - Aug 2010

      (CONSTRUCTIONENGINEERING AIDE III)Fluor Canada Ltd. Kearl Oil Sands ProjectFort McMurray, Alberta - Remote Site• Compiled and maintained electronic/hard copy files containing Requestfor Information (RFI) and Inspection and Testing Plans (ITP) fromContractors, and Project Specifications• Assisted Quality Assurance (QA) Specialists with Squad Checks• Compiled and distributed Quality Assurance (QA) Weekly Reportsincluding Non-Conformance Report (NCR) and Surveillance Reportsdata to QA Management• Issued QA Document numbers for Non-Conformance Report andtracked the reports to closure• Issued Non-Conformance Reports (NCRs) to the required distributiononce NCR is resolved• Maintained current status of QA documents Show less

    • ADMINISTRATIVE ASSISTANT
      • May 2008 - Dec 2008

      Fluor Canada Ltd. – Fort Hills Project Fort McMurray, Alberta – Remote Site • Maintained attendance records for Fluor staff and Site Contractors • Recorded and distributed expense reports to the proper Authorizing Authority. • Ordered, office supplies and arranged transportation of supplies to a remote work site. • Liaison with camp coordinator for rooms for Fluor staff and Site Contractors. • Assisted the Quality Manager with Quality issues • Created and maintained electronic/hard copy files for the main office and Quality Assurance departments • Developing forms for various Quality and Office requirements. Show less

    • Netherlands
    • Architecture and Planning
    • QUALITY ASSURANCE TECHNICIAN
      • Jul 2007 - Apr 2008

      (CONSTRUCTION ENGINEERING AIDE III), TRS Staffing (Fluor Constructors – Horizon Site Fort McMurray Alberta) • Processed all of the incoming Quality Assurance (QA) Documents (Quality Plans, ITP’s, Weld Procedures, and Turnover Manuals), using a QA Traveler System • Maintained the status of these QA Documents while in the QA Organization. • Issued notices of “Audit” to each contractor for consistency and timeliness • Issued QA Audit numbers for Assessments, Evaluations, and Full Audits. • Issued the Audit Report to the contractor once the audit is complete. • Maintained the Audit tracking system and the status of each “Open” Audit finding until closed • Notifed the contractor once the Audit is “Closed”. • Issued QA Document numbers (NCR’s, CAR’s, FTR’s TDR’s, PAR’s, and RFI’s) and recorded and tracked the documents to closure. • Issued Closed Non-Conformance Reports (NCR’s) to the required distribution once the non-conformance is resolved. • Maintained the current status of the QA Records and QA Audit Reports • Assisted the QA Specialist in the field 3 Oct 17, to July 6, 2007 ADMINISTRATIVE ASSISSTANT, TRS Staffing (Fluor Constructors- Horizon Site Fort McMurray Alberta) Show less

    • India
    • Market Research
    • Owner
      • May 2006 - Oct 2006
    • United States
    • Truck Transportation
    • 1 - 100 Employee
    • Dispatcher
      • Nov 2003 - Feb 2006
    • Owner
      • Nov 1997 - Oct 2001
    • DIRECTOR OF FINANCE
      • Sep 1988 - Sep 1995

Community

You need to have a working account to view this content. Click here to join now