Bonish Sharma
Construction Manager at Kandenko Co Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Hindi Limited working proficiency
-
Nepali Native or bilingual proficiency
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
Kandenko Co Ltd
-
Japan
-
Construction
-
1 - 100 Employee
-
Construction Manager
-
Feb 2023 - Present
-
-
Assistant Chief Engineer
-
Jul 2021 - Mar 2023
• Design Review and Update, Procurement, Supply and Installation of MEP works for Facilities in Road tunnel and Buildings.• Scope of work includes Power Supply and distribution Systems, Lighting Facilities, Control and Monitoring System, CCTV, Firefighting System with pipeline, Radio Rebroadcasting and VHF Systems, Conduit Distribution System etc.• Monitor work towards contract obligations, schedule, resources and Budget.• Planning and scheduling teams to identify the fastest, economic, engineered and efficient approach to deliver projects and programs.• Comply with all standards established within Bid specifications and required international standards.• Prepare submittals, Method statement and safety work procedure for construction. Show less
-
-
-
Power Grid Corporation of India Limited
-
India
-
Utilities
-
1 - 100 Employee
-
Engineer
-
Mar 2016 - Mar 2021
• Propose survey works for feasibility of Transmission lines at high challenging terrain. • Prepare and review engineering plans, drawings and profile of Transmission lines with the aid of Google earth, sag template and auto cad. • Documentation for obtaining clearances from Forest, Aviation, PTCC and other concerned departments. • Execution of Foundation works, Erection and Stringing of 220/132/66 KV Transmission Line • Preparation of daily progress report, construction reports and visual charts using MS Office and billing with the aid of SAP. • Coordinating with Government officials in documentation and compensation works. • Solving ROW issues with land owners regarding compensation and land disputes. Show less
-
-
-
Madhya Bharat Power Corporation Ltd.
-
India
-
Civil Engineering
-
1 - 100 Employee
-
Assistant Engineer
-
Aug 2010 - Mar 2016
• Prepare and review engineering plans, designs and drawings on hydro tunnels, barrage and buildings civil, electrical and mechanical works • Construction of Tunnel with NATM method. • Execute MEP works with daily progress in tunnel length. • Optimizing cycle time by reducing delays and hindrances effective manpower schedule and proper coordination. • Complying and regulating safety code for Tunneling works as per National Standards. • Maintenance of High-Tension line for uninterrupted supply. • Preparing Daily progress report, Breakdown and Hindrance Report, Manpower detailing, Equipment wise monthly consumption, Inventory records and comparative statements of efficiency. • Identify and propose improvements to existing electrical systems. • Troubleshoot on electrical systems/equipment. Show less
-
-
-
Coastal Projects Ltd.
-
India
-
Construction
-
300 - 400 Employee
-
Junior Engineer
-
Jul 2009 - Aug 2010
NATM Tunnel methodology Site Documentation Inventory reports Troubleshooting with Electrical equipment's NATM Tunnel methodology Site Documentation Inventory reports Troubleshooting with Electrical equipment's
-
-
Education
-
Lingayas Institute of Management and Technology
Bachelor's Degree, Electrical Engineering -
St Xavier School
Mathematics and Computer Science