Bobby Muraco

Superintendent at MAI Construction, Inc
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • CPR (CPR)
    Occupational Safety and Health Administration
  • First Aid
    Occupational Safety and Health Administration
  • OSHA 10
    Occupational Safety and Health Administration
  • OSHA 30
    Occupational Safety and Health Administration

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Superintendent
      • Jun 2021 - Present

  • Milroy Construction
    • Mountain View, California, United States
    • General Foreman
      • Jan 2007 - Jun 2021

      General Foreman- 2018 to Present • Utilize acquired experience and skills to provide quality site management at multiple sites simultaneously. • Employ sound safety practices, ensuring projects are performed conforming to OSHA guidelines. • Expertise at reading and analyzing blueprints, assuring right-first-time construction efforts. • Synchronize city, fire marshal and third-party inspections in a timely manner, enabling on-time or early project completion. • Effective leader and mentor, capable of hiring, training and building a strong, high-performing team. Apple, Inc. Cupertino, CA- 2018 to Present • Orchestrate the on-site T.I. work framing and shoring, HVAC installation and precision seismic bracing operations. Stanford University, Palo Alto, CA- 2008 to Present • Perform and supervise the T.I. construction activities at the main quad building and throughout the campus, including lab buildouts, bathroom remodeling, residential and commercial and new construction efforts. • Execute the framing of both wood and metal studs, walls, stairs and plaster walls. • Perform full renovations at the Hoover House for the university president, including master bedroom, master and 2nd floor restrooms, A/C install, full new kitchen, 3rd floor, and full-house gas line and fireplace upgrades. Ghirardelli Chocolate, San Leandro, CA- 2007 to 2011 • Responsible for quality installation of seismic zone fours attachments tie-in throughout entire building. • Facilitated effective layout and install of sleepers for new units on roof, roof penetrations, fall protections, seismic footing of existing pilasters, concrete forming and scaffolding. Applied Material, San Jose, CA- 2007 to 2018 • Accountable for precision fabrication and installation of clean room walls, building of raised floors, demo rebuilding doors and door hardware and seismic bracing of tools. Show less

Education

  • California State University - East Bay
    Certification, Construction Management
    2019 - 2020

Community

You need to have a working account to view this content. Click here to join now