Bobby Boris
Quality Manager at Sumitomo Mitsui Construction Co. Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Indonesian Full professional proficiency
-
Malay Full professional proficiency
Topline Score
Bio
Credentials
-
Code of Business Conduct
McConnell DowellSep, 2018- Nov, 2024 -
Cyber Security
McConnell DowellSep, 2018- Nov, 2024 -
Management System
McConnell DowellSep, 2018- Nov, 2024 -
Certified Precast Concrete Designer
Building and Construction AuthorityMar, 2014- Nov, 2024 -
Certified Structural Steel Engineer (StEr)
Building and Construction AuthorityOct, 2013- Nov, 2024 -
Environmental Control Officer (ECO)
National Environment AgencyOct, 2013- Nov, 2024 -
Internal Auditor - bizSafe Level 3
Ministry of ManpowerSep, 2013- Nov, 2024 -
Certified Structural Steel Supervisor (StS)
Building & Construction Authority (BCA) - SingaporeAug, 2013- Nov, 2024 -
Risk Management Implementation Planner - bizSafe Level 2
Ministry of ManpowerApr, 2013- Nov, 2024 -
Ahli K3 Konstruksi - Madya
Lembaga Pengembangan Jasa Konstruksi -
Ahli Teknik Bangunan Gedung - Muda
Lembaga Pengembangan Jasa Konstruksi -
Basic Sea Survival
PT. Samson Tiara
Experience
-
Sumitomo Mitsui Construction Co. Ltd
-
Construction
-
300 - 400 Employee
-
Quality Manager
-
May 2023 - Present
CP 203 Under Ground and Tunnel Jakarta MRT Phase 2 CP 203 Under Ground and Tunnel Jakarta MRT Phase 2
-
-
-
McConnell Dowell
-
Australia
-
Construction
-
700 & Above Employee
-
QA/QC Manager, Reporting Specialist, Field Service
-
Jun 2018 - May 2023
British Petroleum (BP) Tangguh LNG Expansion - Jetty 2 and Trestle Job scope to maintain quality for: - Establish, manage and maintain High Quality of Work for construction - Arrange quality test for concrete compression test, steel material test, bolt pull out test, fender compression test - Marine piling and Super Lift using Traveler with 500T crane for trestle piling work - Marine piling using piling barge with IHC hammer and HydroPro system - Analyse static pile load test for Ultimate Load - Precast and in-situ marine concrete casting using Portland Blast Surface Concrete (PBFC) - Manage & maintain quality for marine fender system FAT using V and Cell type and installation - Manage & maintain quality for Quick Release Hook FAT and installation - Manage & maintain quality for Gangway - Arrange cathodic protection (ICCP) installation - Arrange marine coating work with NACE level 2 standard - Manage quality of steel structural work and installation - Arrange NDE UT & MPT work using PCN level 2 standard for welding work - Manage quality of documents and drawings controlling - Arrange all RFI and ITR / handover certificate / mechanical completion submission - QC weekly and monthly report submission - Arrange quality improvement for all activity Show less
-
-
-
United Engineers (UE)
-
Indonesia
-
Civil Engineering
-
1 - 100 Employee
-
Lead Engineer (Civil)
-
Jan 2016 - Jun 2018
Process Upgrading Chestnut Avenue Waterworks (PUB, Black & Veatch) - Bukit Panjang Job Detail: - Construct Sodium Hypochlorite building, Ammonium Sulphate Plant, Softener Plant, BAC, Ozone Building, 22kV Substation, 12MVA Transformer Building, Pumping Station, external flow division chamber, valve chamber, trench, draw pit - RC pile jacking - Diversion existing trench, culvert, fire hydrant - Epoxy painting - Concrete roof waterproofing system - Roof steel structure fabrication and installation - ERSS system (soldier piling, sheet piling, waler and strut) for deep excavation area - Liaise with PUB, Black & Veatch, MEICA team and subcon for RC design - Demolition for existing chemical building and chamber - Cable detection - Concrete test pile DN1000 (static load test) - Boring work for bore piles Show less
-
-
-
ANTARA KOH PTE LTD
-
Singapore
-
Civil Engineering
-
1 - 100 Employee
-
Project Manager
-
Dec 2011 - Dec 2015
Project: - A&A of Jurong Port Terminal Berth J10 & J11 - Jurong Port - New Ancillary Wharf Changi Naval Base - Changi (McConnell Dowell) - New Seaward Infrastructure DSTA - Pasir Ris - Singapore Lube Park Shared Facility Package B - Jetty (Shell-Total-Sinopec-WorleyParsons) - Tuas - SLNG Corporation Terminal Project Phase I & II Jetty (Samsung C&T, Fluor) - Jurong Island Job detail: - EPC for jetty berthing LNG carrier vessel - Assist in Tendering and Estimation - Marine steel pile and concrete pile design (tension & compression pile) - Marine piling using piling barge with Real Time Kinematic Global Positioning System and HYDROproTM - Pile dynamic analysis, tension test & Statnamic - Bore pile using Reverse Circulation Drills (RCD) and large diameter Down-The-Hole hammer (DTH) - Marine fendering system (cone, V, cell type) - Precast & in-situ reinforced concrete design - Structural steel design, welding and erection - Marine protective coating system - Cathodic protection system - Marine dredging & revetment work - Land and sea soil investigation analysis - Static and dynamic mooring analysis - Quay wall / relieving wall design - Floating pontoon design and fabrication - Asphalt road and rigid pavement works (Singapore LTA Standard) - Design, construction and as-built drawing (AutoCAD) - Proficiency of BS, BS EN, Eurocode, SS, AWS, NACE, DNV, ASTM, ISO 9001:2008 - Construction sequence, temporary structure design and heavy lifting plan - Underwater welding & diving activity - QA/QC: ITP, steel tensile/shear/pull out test, concrete cube test, NDT, rubber fender compression test. - Arrange permitting from Maritime Port Authority (MPA), Building & Construction Authority (BCA), Singapore Land Authority (SLA), Urban Redevelopment Authority (URA), Public Utilities Board (PUB) and NEA - Method statement & risk assessment - Health, safety and green mindset - Internal audit - Document controlling system - Daily, weekly and monthly report for EPC Show less
-
-
Education
-
University College Dublin
Master of Science (M.Sc), Business Management -
Institut Teknologi Bandung (ITB)
Bachelor of Engineering (B.Eng), Civil Engineering