Bobby Belmont

Colorado Region – Director of Survey at SurvWest
  • Claim this Profile
Contact Information
Location
Broomfield, Colorado, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Colorado Region – Director of Survey
      • Aug 2023 - Present
    • United States
    • Oil and Gas
    • 100 - 200 Employee
    • Senior Project Manager
      • Nov 2021 - Aug 2023

      Proposals and Budget WritingManagement of Scope, Schedule, and Budget for multiple projects at once (over 10mm of managed budgets to date)Task Delegation to Support staff of 20+ Team MembersClient Consultation on Pipeline Construction and Survey Tasks and Procedures including but not limited to: Preliminary Survey and Routing, Drafting of Alignment Sheets and Exhibits for Landowner and Permitting, As-Built Construction, Post Construction Alignment Sheets and Exhibits.Oversight and Management of Field Operations for Multiple Simultaneous Projects, 16+ Crews with SupervisorsWorking Within a Team providing Support to other Project Managers for their projects - 2 Project Managers in my region under me and reporting to me on their project statusInvoicing Review and Approvals for Prompt Payment Show less

    • Project Manager
      • Jan 2020 - Dec 2021

      Proposals and Budget WritingManagement of Scope, Schedule, and Budget for multiple projects at once (over 10mm of managed budgets to date)Task Delegation to Support staff of 20+ Team MembersClient Consultation on Pipeline Construction and Survey Tasks and Procedures including but not limited to: Preliminary Survey and Routing, Drafting of Alignment Sheets and Exhibits for Landowner and Permitting, As-Built Construction, Post Construction Alignment Sheets and Exhibits.Oversight and Management of Field Operations for Multiple Simultaneous Projects, 16+ Crews with SupervisorsInvoicing Review and Approvals for Prompt Payment Show less

    • Survey Data Manager
      • May 2019 - Jan 2020

      Lead Data Manager for West RegionDirect all Field and Office Data Technicians and Data Managers for Denver OfficeWork with all Project Managers on Data Turnovers for their projectsProject Management for Projects assigned to me - Communicating with Clients on their needs for the project

    • Data Manager/Assistant Project Manager
      • Feb 2017 - May 2019

      Facilitate Communication between Client and Field crews on multiple Midstream and Large scale pipeline projects. Deliver Project Deliverables within scheduled timetables. Direct Field Supervisors and Crews as needed. Work with the Drafting and Design Teams to meet clients needs.

    • France
    • Railroad Equipment Manufacturing
    • Party Chief
      • Oct 2016 - Nov 2016

      Preliminary Survey - Topographic Survey - Foreign Line Location Preliminary Survey - Topographic Survey - Foreign Line Location

    • Survey Party Chief / Assistant Data Tech
      • May 2015 - Dec 2015

      As-Built Pipeline Project that included Construction Staking, Tie-ins, Mainline survey, Utility Locates before Ditching with Tracking of all Line Crossings. Data Processing of Field Data from Crews as well as extensive work with Utility Crossings for reporting to the client.

    • Survey Party Chief / Assistant Data Tech
      • Feb 2014 - Dec 2015

      Survey Field Work on As-Built Pipeline Project Electronic Pipe TallyConstruction StakingWeld Mapping/Mainline/Tie-ins/Above Ground SurveysData Processing for 6+ Field Crews DailyData QA/QC and AnalysisControl Processing

    • Oil and Gas
    • 1 - 100 Employee
    • Survey Party Chief
      • Jun 2013 - Jan 2014

      4 Way Sweeps for Enbridge Pipeline Project Located previously Unknown Foreign Lines throughout the project before digging commenced Provided Field Drawings showing Station/Location with nearby roads and Alignment sheet information to Contractor for Pothole Crews to visually identify Head QPS Survey Party chief on Segment Above Ground/Topographic Survey of Existing Valve Sites for future additions 4 Way Sweeps for Enbridge Pipeline Project Located previously Unknown Foreign Lines throughout the project before digging commenced Provided Field Drawings showing Station/Location with nearby roads and Alignment sheet information to Contractor for Pothole Crews to visually identify Head QPS Survey Party chief on Segment Above Ground/Topographic Survey of Existing Valve Sites for future additions

    • United States
    • Civil Engineering
    • 100 - 200 Employee
    • Survey Party Chief
      • Apr 2013 - May 2013

      Preliminary Routing for Hartzog and Riley Ridge Pipeline projects Worked with Construction Manager and Landowners to Route pipeline project Topographic Survey, Foreign Line Location Preliminary Routing for Hartzog and Riley Ridge Pipeline projects Worked with Construction Manager and Landowners to Route pipeline project Topographic Survey, Foreign Line Location

    • Assistant Data Technician
      • Jun 2012 - Dec 2012

      Downloaded Raw Field Data into ExcelConverted Raw Data for use in company Excel TemplateCreated formulas in Excel for accuracy checking of data being entered in the fieldChecked Survey data on Pipeline construction projects for deviations and encroachments to other existing pipelines before line was installedProduced above ground Survey Data in full 20k+ line Excel spreadsheet fileProduced files based on drawing schematics in Autocad to be sent to Surveyors in the field to layout multiple building sites preconstruction Show less

    • Instrument Man
      • Apr 2008 - Jun 2012

      Staked Right of Way for Construction CrewsShot in Main Line/Tie In's/Road Bore & Weld MappingAbove Ground Survey after RestorationPipe Tally

    • United States
    • Construction
    • Rodman
      • Jun 2007 - Dec 2007

      Staked out Boundaries for Pipeline Construction Tallied Pipe Booked all pipe information and bends in pipe ahead of the Lowering in crews Checked books for accuracy before the end of the job Staked out Boundaries for Pipeline Construction Tallied Pipe Booked all pipe information and bends in pipe ahead of the Lowering in crews Checked books for accuracy before the end of the job

Education

  • Louisiana Tech University
    Computer Science and Computer Information Systems
    1999 - 2003
  • West Monroe High School
    1995 - 1999

Community

You need to have a working account to view this content. Click here to join now