Björn Hübner

Branch Director / Niederlassungsleiter at PERI Deutschland
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Berlin, Berlin, Germany, DE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Germany
    • Construction
    • 1 - 100 Employee
    • Branch Director / Niederlassungsleiter
      • Mar 2022 - Present

    • Germany
    • Construction
    • 200 - 300 Employee
    • Senior Construction Project Manager / Oberbauleiter
      • Jun 2019 - Feb 2022

    • Belgium
    • Construction
    • 700 & Above Employee
    • Project Manager
      • Jan 2016 - May 2019

      Gotthard Residences / Hotel 4B The Gotthard Residences will be built together with the 4-star hotel. The hotel, in a separate wing, includes some 180 rooms and suites as well as two restaurants, an inviting hotel bar with open fireplace and a modern and well equipped event-and-conference facility. The fitness and wellness center with sauna, vapor bath, therapy rooms and 25-metre indoor pool rounds off the excellent infrastructure. Gotthard Residences / Hotel 4B The Gotthard Residences will be built together with the 4-star hotel. The hotel, in a separate wing, includes some 180 rooms and suites as well as two restaurants, an inviting hotel bar with open fireplace and a modern and well equipped event-and-conference facility. The fitness and wellness center with sauna, vapor bath, therapy rooms and 25-metre indoor pool rounds off the excellent infrastructure.

    • Germany
    • Construction
    • 700 & Above Employee
    • Senior Construction Manager / Oberbauleiter
      • Jan 2015 - Dec 2015

    • Belgium
    • Construction
    • 700 & Above Employee
      • Sep 2013 - Dec 2014

      New Head Office for the State Oil Fund of the Republic of Azerbaijan.SOFAZ TowerDesign and construction of a high-rise office building, height 126 m, consisting of 24 floors and 2 basement levels.The circular podium levels (from ground floor to level 3) contain all shared functions, such as entrance lobby, library, conference rooms, restaurant, museum etc.All receptions and events are organized on the fourth floor, with access to the terrace.A total of 17 actual office levels will accommodate +/- 350 persons. Floors 13, 23 and 24 will be foreseen with technical installations. The basement levels are mainly used as parking levels.The building includes external underground area for technical facilities, and particular storage.The building is equipped with 7 lift units: 6 panoramic along the facade and 1 service/firemen’s lift within the central core area.The active façade is made of a double skin curtain wall in structured glazing.• Scope of Works: Design & Build • Structural design by local structural design office (Az Imeti) together with Besix Design Department • Architecture: managed by BESIX with local Architect (MDM group) • MEP works: BESIX team with a Local designer (ALTI) The scope of works includes also all decorative aspects of the building. Total Value:$ 95.000.000 Show less

      • Nov 2012 - Aug 2013

      Execution of a 60,000 seats world class stadium, for the King Abdullah Sports City.The project consists in the:• Full Design and Engineering• Material Procurement• Construction• Fit Out and Furnishing• Pre-commissioning, Mechanical Completion & CommissioningOf the following works:Turn key execution of a 60,000 seats world class stadium, the Centerpiece of the King Abdullah Sports City, to host football matches for club, national and international teams, a 2,000 spectator multipurpose indoor stadium, a 500person Mosque, and execution of all associated infrastructure works such as 45,000 open asphalted car parking spaces, 8 kilometers of asphalted road works , 2 kilometers of pedestrian walkways, swales, culverts, substations and power, water and sewerage utilities.Construction of external football pitches, tennis courts and athletic tracks.The main stadium has 6 levels and contains:• The pitch;• VVIP Spectators Facilities;• Royal Box;• Premium Lounge;• Media Facilities;• Players and Officials Facilities;• Operational and Security FacilitiesTotal Value:$ 504,000,000 completion date set on October 31st, 2014.$ 650,000,000 after acceleration and completion date set on November 21st, 2013. Show less

      • Jun 2011 - Oct 2012

      February 2012 to October 2012Extension of Borouge 3 Complex by Abu Dhabi Polymers (Borouge).A new ethane cracker will produce 1.5 million tons of ethylene per year.Six Construct Ltd has been awarded for the civil and marine works.Key numbers:A sea water intake pumping station, 60 m x 30 m, 16 m deep.An outfall structure.An evaporation pond.A quay wall of 427 m length, with a depth of 15 m, made of precast concrete blocks, with an area reclaimed on the sea of 100,000 m2, inclusive of dynamic compaction, provision of piled foundations for container handling cranes, and rocky shore protection. A marshalling area, by excavation and fill on the sea, with 1200 lm of shore protection. Provision of site installations inclusive of a Precast Yard for the fabrication of the quay wall blocks.$ 52,000,000June 2011 to January 2012Construction of the ADNOC new Corporate Headquarters Abu Dhabi.Construction of a 65 storey high-rise office building with 3 storey basement. Total height 335m.The new complex will include an office tower, podium and atrium. The total built up area will be about 190,000 square meters.Responsible to implement the PERI Skydeck system.$ 162,231,000 Show less

    • Project Manager
      • Jul 2010 - Jun 2011

      Metropolis Haus Hamburg Construction of a 9 storey office building with auditorium and a 3 storey car park. The building is equipped with technological equipment of the highest and most modern standards. A building management system incorporates state-of-the-art software integration of the technical services, control and information systems. € 21,500,000 Responsible for overseeing the completion and handover the complete concrete structure. Supervise and coordinate all the activities. Ensure that the Project is performed to the fullest of the efficiency. Create and execute project work plans and revises as appropriate to meet changing needs and requirements. Identify resources needed and assign individual responsibilities. Manage day-to-day operational aspects of the project and scope. Ensure project documents are complete, current, and stored appropriately. Track and reports team hours and expenses on a monthly basis. Manage the project budget. Ensure timely and accurate invoicing, and monitor receivables for the project. Follow up with clients, when necessary, regarding unpaid invoices. Analyze project profitability, revenue, margins, bill rates and utilization. Lead and motivate the project team. Arrange and lead team progress meetings. Show less

    • Belgium
    • Construction
    • 700 & Above Employee
      • Feb 2010 - Jun 2010

      Nile Corniche St. Regis Hotel Complex.Civil Works for the basement construction of a multifunction complex including 3 towers of 100 m height on the side of the Nile. JV BESIX & Orascom is responsible for the design of the deep supported excavation, the piling works and the dewatering.Key numbers: 940 piles, 385 lm of Diaphragm wall, raft 2.5m thick, dewatering of3 000 – 5 000 m3/h, 4 levels of basement, raft 11m underwater.$ 60,000,000Responsible for overseeing the completion and handover the complete concrete Basement structure.Schedule the project in logical steps and budget time required to meet deadlines.Determine labor requirements and dispatch workers to construction sites.Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.Inspect and review projects to monitor compliance with building and safety codes, and other regulations.Interpret and explain plans and contract terms to administrative staff, workers and clients.Direct and supervise workers.Study job specifications to determine appropriate construction methods.Prepare and submit budget estimates and progress and cost tracking reports.Develop and implement quality control programs.Take actions to deal with the results of delays, bad weather, or emergencies at construction site.Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, and systems.Investigate damage, accidents, or delays at construction sites, to ensure that proper procedures are being carried out.Evaluate construction methods and determine cost-effectiveness of plans. Show less

      • Jan 2008 - Jan 2010

      August 2009 to January 2010Civil Works of a new Sewage Treatment Plant (STP). Installation of Collector Sewer and Irrigation Underground Network from Abu Dhabi and Al Ain to the new STP.The contract involves Design, Build, Operation and Maintenance$ 629,543,065January 2008 to July 2009Al Gurm Resort Abu Dhabi. Construction of 63 residential villas. Substructure and superstructure works, external finishing and infrastructure work including utility networks. Design, supply and installation of bored and driven piles of dia. 500 mm & dia. 600 mm using land and marine equipment $ 156,000,000 Show less

      • Aug 2005 - Dec 2007

      February 2007 to December 2007Al Garhoud Bridge Dubai. Construction of a new seven lane dual carriage way bridge: length=520m (5 X 80m + 2 X 60m), width=2 X 35m. $ 124,000,000February 2006 to January 2007Civil works related to the construction of a greenfield cement plant of a capacity of 7,500 ton per day, $ 51,000,000August 2005 to February 2006Construction of a new Building for the Ministry of Foreign Affairs in Abu Dhabi, $ 78,000,000

  • Jazz Civil Engineering Ltd
    • Berlin Area, Germany
    • Senior Site Manager
      • Oct 2003 - Jul 2005

      Manage site superintendents Liaising with architects, planners, estimators and buyers prior to commencement of building work Scheduling the works & targets Supervising the preparation of the construction site including hire of labour, installation of temporary offices and overseeing delivery of materials Liaising with the site workforce Monitoring building progress, in particular, quality of work, compliance with regulations, costs and speed of stage completion Reporting regularly to the client Responsible for the contractual and financial follow-up and budget control Show less

  • Neumann Civil Engineering Ltd
    • Berlin Area, Germany
    • Construction Manager
      • Aug 2001 - Oct 2003

      Co-ordination of the site foremen Supervision of the various works Directing all aspects of the day-to-day execution of the project Monitoring and coordinating work performed by superintendents and workmen Directing work sequencing to expedite project delivery and to minimize disruption of ongoing operations Organising and participating at the site meetings Planning the resources Reporting on progress and output of own teams and suppliers Reporting directly to the Project Manager Show less

  • Industriebau West Ltd
    • Berlin Area, Germany
    • Site Superintendent
      • Mar 1999 - Aug 2001

      Responsible for the execution on site of one or more parts of the construction project Supervision and coordination of the execution Direction of the daily production Control of the outputs and coordination of the subcontractors and own teams Scheduling of the personnel Regular feedback with the construction manager with regard to the advance of the construction project Responsible for the execution on site of one or more parts of the construction project Supervision and coordination of the execution Direction of the daily production Control of the outputs and coordination of the subcontractors and own teams Scheduling of the personnel Regular feedback with the construction manager with regard to the advance of the construction project

Education

  • TFH Technische Fachhochschule Berlin (University of Applied Sciences)
    Master's Degree, Civil Engineering
    1993 - 1998

Community

You need to have a working account to view this content. Click here to join now