Bishwamitra Yati
Construction Supervisor (Hydrotest ) at Petrofac International Limited,Sharjah- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
North Caspian Recruitment Support
-
Kazakhstan
-
Oil and Gas
-
1 - 100 Employee
-
Construction Supervisor (Hydrotest )
-
Jul 2017 - Present
Responsible for PTW Issuer to Green field and PTW Executor for the Brown field. To review test pack Documents prepared by Piping sub-contractors and ensure that the test package have been prepared in accordance with drawing, specifications and procedure in which field design changes having been made are reflected. Responsible for Line checking, punch list preparation and clearing punch, pre Hydrotest line walkdown and witness of pressure testing and reinstatement. To ensure that pressure test all the A/G U/G Piping is appropriately performed as per company procedure by sub-contractor. Line walks For RFC as per System & Sub System with client to hand over for commissioning & clearing punches and close at the time Taking care of Pre-Commissioning, Testing, Flushing, Activity’s Reinstatement Line walk and close the Check list B with Client as per test pack and Close out Punch list B with Client.
-
-
-
TOCO - The Oman Construction Company LLC
-
Oman
-
Oil and Gas
-
300 - 400 Employee
-
Piping Supervisor
-
Oct 2014 - Present
Supervising project activities and handling the complete site management cycle entailing Requirement gathering, planning and scheduling, delay analysis and preparation of corrective action plan. Interacting with various department and clients to ensure coordination and compliance. Checking the drawing and releasing for construction. Air pigging & Hydro testing of on plot and off plot pipe section. Conducting periodic inspection of on plot & off plot pipe line. Carrying out the pre and post line walk inspection and preparing the final punch list.
-
-
-
Hyundai Heavy Industries Co., Ltd
-
South Korea
-
Shipbuilding
-
700 & Above Employee
-
construction supervisor
-
Nov 2012 - Present
-
-
-
-
Field Supervisor
-
Nov 2012 - Jun 2013
Design/Detail Engineering Checking of isometric drawings against Master P & I D considering the integrity of the design base on project requirements, material specification.Project Documentation Involve in the prepared of Method Statement, Inspection Test Plan, Inspection Checklist, Construction Completion Inspection Test Records & Pre- commissioning Inspection Test Records. Quality Control & Inspection Monitor the Quality variation (NCR) activities & prepare the Corrective & Preventive (CAR) action Proposal as per the specification to rectify it.Commissioning & Start Up Has adequate knowledge on the basic principle of management functions, i.e. planning, organizing, delegating, controlling and its application to plant commissioning management. Analyze problems that arise during commissioning and solve them through good technical details Responsible for entire Commissioning of Plant as per the technical specifications & finishing the fine tuning adjustments.Occupational Safety & Health Administration (OSHA) Knowledge of excavation, hot, cold work & acquainted with the confined space work. Active involvement in PTW (permit to work) co-ordination & JSA (job safety analysis) preparation
-
-
Education
-
H.S.C. Passed
Diploma in Mechanical Engginering