BIJUMON Thankappan
Design Office Supervisor / Project Coordinator at Alderley plc- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Hindi Professional working proficiency
-
English Full professional proficiency
Topline Score
Bio
Experience
-
Alderley
-
United Kingdom
-
Oil and Gas
-
100 - 200 Employee
-
Design Office Supervisor / Project Coordinator
-
Apr 2002 - Present
• Managed projects as Design Office Supervisor / Project Coordinator, Responsible for proper and timely execution of projects ensuring Department quality management system and any project specific contractual requirements are met. • Ensured effective communications among other engineering disciplines, project management and client teams. • Oversaw workflow and conducted month-end reconciliation of jobs. • Kept projects on schedule by managing deadlines and adjusting workflows as needed. • Communicated with clients about ideas for innovative Piping / Structural systems and designs, budget constraints and use requirements. • Collaborated with Engineers and Designers to resolve issues with non-compliant projects and designs. • Managed quality assurance program, including on-site evaluations, internal audits and customer surveys. • Reviewed documentation to verify conformance with established project criteria. • Responsible for issue of all piping deliverable documents. Organize inputs and supervise for Preparation General Layout, Equipment layout, Key plans, Support design, Isometrics, Material take offs, Stress Analysis, Pipe material specifications and Material requisitions. • Liaise with Project Managers & Engineers, Production and QA/AC departments to ensure that problem areas in design are solved and technical information is provided to Design Office to avoid delays. • Coordinate with Production/ Subcontractor for Piping / Structural fabrication and delivery. • Undertake developmental activities like preparation of Work instructions / Procedures / Guidelines. • Assist in preparation of installation, operation, maintenance and safety manuals. • Responsible for coordinating As-Built team. Show less
-
-
-
Galfar Engineering & Contracting Co. W.L.L Emirates
-
United Arab Emirates
-
Construction
-
300 - 400 Employee
-
Senior Designer / Project & Site Coordinator
-
Jun 2001 - May 2002
Projects : Upgrading of oil drains and effluent water disposal facilities Asab and Shah. Gas Injection Pipeline Project (ADCO) Gas Injection Pilot Plant, Asab, Abu-Dhabi (ADCO/PETROFAC). Responsibility entails : Preparation of Piping Layouts, Coordinating with the project dept & Workshop. Schedules, Support schedule, Isometrics, Coordinating with the Draughtsmen & Workshop at site. As-built drawings. Test pack preparation & system mark-up. Show less
-
-
-
Technip
-
Oil and Gas
-
700 & Above Employee
-
Piping & Structural Design Draughtsman
-
Jan 2000 - Jun 2001
Project : On-Shore Gas Development Project, Phase-II (ADNOC) Preparation of As-built GA, P & ID,Test pack preparation & System mark up Checking. Project : On-Shore Gas Development Project, Phase-II (ADNOC) Preparation of As-built GA, P & ID,Test pack preparation & System mark up Checking.
-
-
-
Consolidated Contractors Company
-
Greece
-
Construction
-
700 & Above Employee
-
Senior Piping & Structural Draughtsman
-
Jun 1999 - Dec 1999
Position : Piping & Structural DraughtsmanProject : On-Shore Gas Development Project, Phase-II (ADNOC)Client : (Bechtel-Technip Joint Venture)Responsibility entails : Preparation of detail fabrication drawings. Coordinating with the Workshop & Design office activities.
-
-
Piping & Structural Draughtsman
-
Jul 1998 - May 1999
Project : Saudi Chevron Petrochemical Ltd.Client : Chiyoda Petrostar Ltd.Responsibility entails :Preparation of Piping Isometrics & Structural drawings Preparation of Test packs and system mark-ups, As-Built Drawings. Punch listing, supervised Line coding.Test pack preparation & system mark up.
-
-
-
PIPECON CORPORATION INC
-
United States
-
Senior Piping & Structural Draughtsman
-
Apr 1991 - Jun 1998
Position : Senior Piping & Structural Draughtsman Major projects and activities involved Vitara chemicals Ltd.Baroda, Gujarat (Chemical plant) : Preparation of Piping Layout, Isometric drawings, M.T.O (bulk & final) Isometrics of the HPST& MPST line for boiler Inspectors approval, Nozzle orientation, Periodical visit to the site and and supervision. Ciba – Ckd Bio Tech Ltd. Mumbai : Preparation of Piping Layouts, Isometrics, Plotplan Layout,led a group of D’man for As–built drawings at site. Attending the client weekly meetings. Gharda chemicals Ltd.Chiplun. Mumbai: Preparation of Piping Layout, Isometric drawings, M.T.O (Bulk & Final), Isometric of the MPST and HPST lines for boiler Inspectors approval, Re-route the pipelines as per the site conditions. Hindustan Ciba-Geigy Ltd.Goa. : Preparation of Piping Layout, Isometric drawings, M.T.O (Bulk & final), Foundation Layout, Re-routing the existing lines of the Piperack, Re-routing the closed drain lines and the trenches, Line list preparation. Ranbaxy laboratories Ltd. : Pipe Rack Layout, Tank-farm Layout, Piping Layout, Final M.T.O Himachal Pradesh P&I diagram and flow sheets. (Pharmaceutical Plant) Show less
-
-
Education
-
St. Francis Institute of Technology (Engineering College) Mount Francis Mount Poinsur S V P Road Post Box No .8456 Borivli (West) Mumbai 400 103
• Diploma, Mechanical Engineering -
Devamatha College, Mahatma Gandhi University,Kuravilangad-686633
HSC, Science