Bibin Jose, PMP®

Senior Project Engineer at Bahwan Engineering Co LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Masqaţ, Oman, OM
Languages
  • English -
  • Hindi -
  • Malayalam -
  • Tamil -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Piping Engineering & Design as per ASME B.31.3
    IPEBS Hyderabad
    Jan, 2008
    - Nov, 2024

Experience

    • Oman
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Senior Project Engineer
      • Mar 2012 - Present

      Contract - Engineering/Procurement/Construction/Commissioning (EPCC-Marmul)Client: Petroleum Development Oman LLC (PDO)Engineering Consultant: TRE Engineering LLC/ Mot MacDonald Company LLCProject Handled1. BIRBA REJUVENATION PROJECT (Approximate Cost – 13 Million USD)Replacement of the AP flare tip, process flare tip and HP flare tip, Installation of instrument air package [2 compressors (1W + 1S) x 370 Nm3/hr each], 110VDC UPS, 415V LV Switchboard, Replacement of Pipe supports, Pipe sleepers & Foundation works2. MMPS GAS COMPRESSION & EVACUATION FACILITIES PROJECT-MARMUL (Approximate Cost – 190 Million USD)Early Tie-in works, Two Booster Compressors (2 x 50%) comprising inter-stage coolers and suction scrubbers and each having capacity of 150,000 Sm³/d, One Gas Dehydration Unit and Gas Dew pointing Unit, One Refrigeration Unit, One sour dry gas export pipeline (83 km), New HP and AP flare systems including flare KODs and transfer pumps, Closed drain system consisting of close drain vessel & pumps, Condensate flash vessel, Condensate heater (electrical), Instrument Air Package having capacity of 521 Nm³/h each, Nitrogen Generation Package, Replacement of existing GRC (K-2412), Replacement of existing Relief Valves, Process and Utility Tie-in works etc.3. MMPS MAIN OPERATING CONTROL ROOM & SUB STATION BUILDING WITH OHL LINE 3.5 KM4. MARMUL HEATER DEMOLITION PROJECT Show less

    • Sr. Project Engineer
      • Mar 2012 - Present

    • Oman
    • Engineering Services
    • 300 - 400 Employee
    • Project Engineer
      • Apr 2010 - Feb 2012

      Handled water Treatment Facilities like Reverse Osmosis Plants (Sea Water & Desalination), Pumping Stations, STPs, Irrigation, and Chlorination system. Responsible for Planning, Scheduling, Executing, and monitoring in various projects with respect to the preparation of Process design calculations, P&ID drawings, Design drawings by CADWORKS as well as Auto CAD drawings, piping isometric drawings, BOQ, O&M manual for plants, control Philosophy, vendor bid evaluation, MAS Approval, Man power Management, Material procurement etc. Projects Handled 1. CONSTRUCTION OF 200 M³/DAY RO DESALINATION PALNT AT AL AWAFIA – BAHALA. Client: Public Authority of Water & Electricity, Oman, Consultant: Universal Consultancy. 2. CONSTRUCTION OF 250 M³/DAY SEWAGE TREATMENT PLANT AT HAIMA Client: Ministry of Defence, Oman, Consultant: Gulf Engineering Consultancy 3. SEWAGE TREATMENT FACILITIES AT JABAL AKTHAR (SHIRAIJAH & SEEQ VILLAGES) MBR 100 M³/DAY Client: Ministry of Regional Municipalities & Environmental Resources, Oman, Consultant: National Engineering Consultancy, Oman. Show less

Education

  • Cochin University of Science and Technology
    Bachelor of Technology (B.Tech.), Mechanical Engineering
    2004 - 2008
  • Annamalai University
    Master of Business Administration - MBA, Finance and Financial Management Services
    2010 - 2012
  • HIBHS VARAPUZHA
    CUSAT, Mechanical Engineering
    2004 - 2008

Community

You need to have a working account to view this content. Click here to join now