Bibin Josy

Senior Structural Designer at GPMC : Green Palm Marine Consultancy Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Dubai, United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Structural Designer
      • Apr 2013 - Present

      Structural design , Detailed Drawings and modeling of FSO Conversion, Offshore Field terminal, PLEM &SBM Design & mooring, Jackets, Topsides, Transportation ,Sea fastening, Installation of the Jacket , Topside, Buoy, PLEM , Gantry Crane ,Anchor Piles ,Chains ,Pipe Rack Structure, Jack up Conversions, Accommodations, lift boat, Jack up repairs & modifications, Onshore Plant equipment Steel Supports, Duties & Responsibilities: Drawing & 3D Modeling (using AutoCAD, Cadworkx, Auto CAD Steel Work Software). • Main Scantling & Detailed Drawing of the Jacket & Topside, Rig Repairing Project As well as New Build • Tanker to FSO & FPSO Conversion Drawings • Sea fastening, Transportation ,Installation, Lifting Sequence of the Jacket, Topside ,SBM , PLEM, Gantry etc • PLEM & Buoy Detail Design Drawings • Jacket Life Extension Drawing with Steel Clamps • Equipment Foundation & Detail Drawings For DRILL SHIP • Onshore Oil Rig Snubbing Unit Drawings • Steel Support Details Drawings of Onshore Refinery Plant • Preparation Steel Renewal Drawing As per the UT & Survey Report for the Jack up Rigs • Material take over for Fabrication • Detail Structural Modeling for the FEA Software (Strand 7) Using Rhinoceros Show less

    • Structural Drafter
      • Jul 2008 - Apr 2013

      Projects Handled: Structural design and modeling of various Mobile Offshore Units, B-class Jack up rigs, Semi-Submersible and Tension Leg Platforms., FPSO Conversion Duties & Responsibilities: Drawing & Modeling • Drawing of Units Structure Main Structure Dwgs. Access Walkway platforms/Machinery Foundations as per Owners Technical Specification and Class requirements (using AutoCAD & Micro Station Software). • Solving Production onsite issues like interferences, work suitability, accessibility to various areas etc. • Attending Engineering meetings to discuss about Site issues and Project status. • Detail modelling of the Mobile Offshore Drilling Units Main Structure/ Access Walkway platforms/Machinery Foundations (using PDS Software). • Solving Production onsite issues like interferences, work suitability, accessibility to various areas etc Major Project Involved in Keppel FELS Mumbai, India • Keppel B Class Rig - Petrovitenam, UMW Oil and Gas, GDI, • P56 - Production Semisubmersible - Petrobras, Brazil • P61 - Tension Leg Wellhead Platform - Petrobras, Brazil • FPSO Berantai Upgrade & Conversion - Petrofac, Malaysia • Pipe Rack Project - Kazakhstan Keppel Project • Drill Ship Upgrade - Petrobras, Brazil • Semisubmersible Repair - Diamond Offshore • ENSCO Jack up Rig Repair - AMFELS USA Show less

    • India
    • Consumer Services
    • 1 - 100 Employee
    • Structural Drafter
      • Jul 2007 - Jun 2008

      Projects Handled: Developing Structural and Naval Architecture drawings of Tugs and Offshore supporting vessels Duties & Responsibilities: Drawing • Preparation of the Main Structure, General Arrangement Plan, Cutting Plan, As built Drawings • Preparation of the Steel Estimation Major Project Involved in Mechmarine, Mumbai • AHTS VESSEL - Hadi Corporation, Saudi Arabia • Oil Tanker Barge - Coastal Services, Mumbai • Bitumen Carrier - UAE Client • Deep Dredger - Damen Shipyard Netherlands. Show less

Community

You need to have a working account to view this content. Click here to join now