Bhupal Bhandary

Supply Chain Manager at شركة تساوي Tasawy Company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Al Khobar, Eastern, Saudi Arabia, SA
Languages
  • English Professional working proficiency
  • Hindi Professional working proficiency
  • Arabic Professional working proficiency
  • Nepali Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • ISO Internal Auditor Training
    QCCS Quality Core Contracting Services L.L.C
    Jan, 2021
    - Oct, 2024
  • BLS, FIRST AID CPR Training
    Saudi Heart Association
    Sep, 2019
    - Oct, 2024
  • NSC Distracted Driving Training
    National Safety Council
    Apr, 2018
    - Oct, 2024
  • Anti-Bribery Training 2018
    Skillcast
    Mar, 2018
    - Oct, 2024
  • Conflicts of Interest Policy
    Skillcast
    Mar, 2018
    - Oct, 2024

Experience

    • Saudi Arabia
    • Construction
    • 1 - 100 Employee
    • Supply Chain Manager
      • Jan 2022 - Present

      • Develop overall strategy and execution of supply chain management function as well as the planning and directing of activities and operations of the business.• Experienced in supply chain management with Real Estate & Infrastructure development companies in the field of Road Infrastructure, Strom Infrastructure Network, Sewer Infrastructure Network, MV and LV Electrical Infrastructure Network, Water Supply Infrastructure network, Telecommunication and other networks. Having strong Knowledge & Relationship of local and international vendors with experience in purchasing of Material and Services related to Road Infrastructure, Storm, Sewer, Water Supply, MV and LV Electrical, Telecommunication and sub-contractors in different scope with high level of quality standard on behalf of timely and cost-effective manner. • Having strong Knowledge & Relationship of local and international vendors with experience in purchasing of Material and Services related to Road Infrastructure, Storm, Sewer, Water Supply, MV and LV Electrical, Telecommunication and sub-contractors in different scope with high level of quality standard on behalf of timely and cost-effective manner. • Establishes performance metrics for measurement, comparison, or evaluation of factors affecting the supply chain.• Analyzes current inventories and procedures; suggests improvements to increase efficiency of supply chain and profitability for the company.

    • Project Control Manager
      • Oct 2020 - Feb 2022

      The Project History • Dhahran Industrial Land Development for warehouse -1531, , Dhahran KSAArea of Land 514,661 M²• Dhahran Industrial Land Development for warehouse-1546, Dhahran KSA Area of Land 427,924 M²• Khurais Residential Land Development -3943, Riyadh, KSA Area of Land 516,860 M²• Faisaliya Residential Land Development -1514, Dammam, KSA Area of Land 40,000 M²• Al Sadafah Residential Land Development -1362, Rakah, KSA Area of Land 31,940 M²• Al Sadafah Residential Land Development -1028, Rakah, KSA Area of Land 26,801 M²• Al Loluah Residential Land Development -Dammam KSA - Area of Land 40,000 M²• KFH Residential Land Development - [KHOBAR CORNISH] KSA - Area of Land 37,000 M²Responsibilities and Duties:• Arrange and manage planning workshops/meetings to discuss and assist contractors / consultants to close their planning / project control issues.• Works with scheduling staff to develop, manage, revise, and update integrated detailed project schedules including all phases of project execution.• Works with senior project management staff in managing the overall project cost control efforts.• Manage and develop the document control system and communication flow for the project.• Prepare and manage the daily escalation report for project managers.• Provide earned value analysis and forecasting to support project completion date including alternative scenario analysis for work concurrency.• Provide risk management reporting including tracking of project issues, risk avoidance and risk mitigation• Conducted site meetings Monitored progress throughout the project cycle· Responsible for monitoring and escalation of project management KPIs and performance metrics. And implementing ISO & ERP system.

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Asset & Maintenance Executive
      • Jan 2015 - Oct 2020

      Set up of Maintenance department including team developmentEnsure safe working environmentCreate and manage an overview of buildings & regulationsCreate and manage a yearly maintenance schedule Sale of redundant assetsEnsure proper safeguarding of assetsGet insight in all maintenance costs on monthly basisDevelop more efficient maintenance teamEnsure effective and efficient management, operations, and maintenance of the facility and surrounding property.Communicates and trains staff on MSDS and OSHA standards and safety procedures.Ensure quality service is being delivered to patrons, vendors, suppliers, clients and fellow staff.Prioritize projects and work activities.Perform construction and reconstruction of modular furniture.Perform semi-skilled carpentry work in the construction of remodeling, such as wall demo, new wall construction, building shelving or other organizational mechanisms for work and storage spaces.Inspect building and equipment for needed repair and maintenance.

    • Quantity Surveyor
      • Feb 2014 - Dec 2014

      preparing Final Invoices and contract documents, including bills of quantities with the architect and/or the client;undertaking cost analysis for repair and maintenance project work;assisting in establishing a client's requirements and undertaking feasibility studies;performing risk, value management and cost control;advising on procurement strategy;identifying, analysing and developing responses to commercial risks;preparing and analysing costings for tenders;allocating work to subcontractors;providing advice on contractual claims;analysing outcomes and writing detailed progress reports;valuing completed work and arranging payments;maintaining awareness of the different building contracts in current use;understanding the implications of health and safety regulations.

    • Brazil
    • Utilities
    • 1 - 100 Employee
    • Site Engineer "​ Civil"
      • Jul 2012 - Aug 2013

       Join survey with client for understanding whole scope of work. Checks IFC Drawings and BOQ for compliance with Standard specifications of SABIC as Well as Petrokemya. Review and Comment of the 60% & 90% IFC Drawing and BOQ (Design& calculation of Cable bridge foundation, Steel structure, Specification and Grade of Lean concrete & Reinforce Concrete, Size of Rebar, coating materials  Prepared and submit the method of statement &execution plan to the client.  Prepared and submit the manpower, Equipment & Tools Development plan to the construction management.  Calculated and prepared all the purchase requisition materials stay under the standard & specification of client and other related procurement documents.  Daily attend the meeting to the client for discussion about project schedule, daily progress report, modify works and procedure of actives.  Pre-Inspection all the layout & Orientation work , Excavation with shoring & Compaction works, lean concrete, Shuttering works, Rebar work at footing, pedestal, Grid Beams etc., Reinforce concrete , J- bolts, Vapor barrier, bitumen coat, Grout work, Base Course, Brick flooring etc. under ITP ( Inspection Test Plan) Informed, assisted and Co-ordinated with QC Inspector for preparation and submit, all kind of RFI for client, and third party. Participated & clarified during inspection of all kind of civil related jobs with Representative of client’s QC Inspector, third party as well as contractor’s QC.  Compiled, verified and correlates data relating to engineering problems. Assists in development and verification of project control documents and status reports Monitors project controls within discipline. Verified the measurement, level, Co-ordinate and orientation of Cable Bridge Foundation. Prepared and submit the Daily progress report, weekly progress report, survey report, QC/QA reports.

    • Saudi Arabia
    • Venture Capital and Private Equity Principals
    • 1 - 100 Employee
    • Site Supervisor "civil"​
      • Sep 2011 - Jul 2012

       Assists in conceptual designs, studies, reports and proposals Performs calculations and basic preliminary analyses of project. Checks manufacturers (Vendor)Drawings and data for compliance with specifications. Prepared and submit the method of statement, construction plan to the client  Assists in detailed development of established design concepts for process systems, structures and equipment. Assists in developing or reviews discipline material quantity estimates. Participates in preparation of material requisitions, specifications and other related procurement documents. Daily attend the meeting to the client for discussion about project schedule, daily progress report, modify works and procedure of actives.  Casting all fence post according to Saudi ARAMCO standards Assists in preparation of forecasts, quantity take-offs and change orders. Participates in and fosters a work environment that is based upon openness, trust, communication, teamwork, empowerment, innovation, and satisfaction. Familiar with all engineering department procedures and their application to projects.  Design, estimation and approved the drawing to the construction of walk way. Commissioning and hand over the projects.

    • Site Engineer "civil"​
      • Jul 2011 - Sep 2011

       Accomplishes calculations and elementary preliminary analyses of project. Checks manufacturers? Drawings and statistics for compliance with specifications. Supports in developing or reviews discipline material, tools & equipment and manpower quantity estimates. Contributes in provision of material appropriations, specifications and other related procurement documents. Preparation and submission the method of statement, construction plan to the client  Mobilization of all kind of temporary facilities like as portable cabin, mesh hall, material container, toilet and water supply etc. Organizes and submission the material, mechanism, equipment’s specification reports to the client Verified the measurement, level, Co-ordinate and orientation of foundation, pedestal of operator shelter. Prepared and submit the Daily progress report, weekly progress report, survey report, QC/QA report as well as safe man hour reports. Prepared construction drawing to the worker for laidback to work and completion the project at good time frame.  Daily attend the meeting to the client for discussion about project schedule, daily progress report, modify works and procedure of actives.  Prepared the construction schedule for gyption, ceramics tile, ceiling tile, com-board, metal door, and metal sheet for outer wall, roofing, basin and plumbing works. Commissioning and hand over the operator shelter to the client  Prepared and submit the 100% package drawing, help to prepared bill, and demobilized the temporary facilities.

    • Project Supervisor "CIVIL"​
      • Jan 2011 - Jul 2011

       Support managing activities involving working out various requirements with respect to utilities, machines, manpower & monitoring overall project operations for ensuring timely completion Drafting of various categories’ drawing, such as civil and mechanicals as per review or modifying.  Verified the measurement, level, co-ordinate and orientation of foundation, pedestal and equipment by Optical Level Machine and Theodolite. Filed supervisor for build out construction’s Chlorination Project (foundation of sodium-hypochlorite unit, Acid Cleaning Unit, Transformer/Rectifier units, Local control Panel unit, LVD panel, and HVAC units &its pedestal for pipe support and sunshade.) Material estimation as per field requirement such as shuttering materials or formwork, Concrete mass, Surface preparing materials, Crack repair materials, Alkali resistance materials, plastering materials etc. Maintaining the work schedule Taking care of installation of shim-plate, J-Bolt and chemical anchor bolts  Prepare daily DPR (Daily Progress Report), WPR, Monthly Progress Report and safe man hour Report. Completing work according to blueprint. Coordinating with mechanical, electrical, and instrumental’ scope of works. Prepare and submit daily & weekly progress reports. Prepare and submit safe man hour reports weekly & monthly. Prepare and submit time sheet of all employee at end of month Prepare as well as co-ordinate for work permits.  Prepare and submit RFI (Request for Inspection) as well as co-ordinate with QC/QA and clarification of drawing, measurement, materials and other required. Provided technical supports to engineers and structural. Worked with structural solutions using change of structural system and use of shear wall.

    • Site Supervisor / Auto Cad Operator
      • Aug 2010 - Mar 2011

       Drafting of various categories’ drawing, such as civil and mechanicals as per review or modifying.  Required to prepare daily construction drawing for ongoing projects. Filed supervisor for build out construction’s coalesure projects (Pad foundation for Coalesure unit and pedestal for pipe support and sunshade.) Verified the measurement, level, co-ordinate and orientation of foundation, pedestal and equipment by Optical Level Machine and Theodolite. Maintaining the work schedule Taking care of installation of shim-plate, J-Bolt and chemical anchor bolts  Prepare daily DPR (Daily Progress Report), WPR, Monthly Progress Report and safe man hour Report. Prepare and submit safe man hour reports weekly & monthly. Prepare and submit time sheet of all employee at end of month Prepare as well as co-ordinate for work permits.  Prepare and submit RFI (Request for Inspection) as well as co-ordinate with QC/QA and clarification of drawing, measurement, materials and other required. Material estimation as per field requirement Completing work according to blueprint. Coordinating with mechanical, electrical, and instrumental’ scope of works.

    • Saudi Arabia
    • Oil and Gas
    • 400 - 500 Employee
    • Project Supervisor
      • Feb 2010 - Aug 2010

       Drafting of various civil, mechanical, electrical and instrument drawing as per review.  Required to prepare daily construction drawing for ongoing projects Field supervisor for build out of equipment’s foundation projects over 2,600 Sf. Verified field measurement of survey team for final designs. Responsible for survey crew training and scheduling. Sometimes fill in for crew chief to run traverse calculation and levels. Taking care of installation of shim-plate, J-Bolt and chemical anchor bolts  Prepare daily DPR (Daily Progress Report),WPR, Monthly Progress Report and safe man hour Report Taking care of cutting steel and schedule of works. Maintaining the work schedule. Completing work, according to blueprints. Estimation of concrete, formworks, grout cement, Rnederoc, Neto Mortar and using civil equipment

    • United States
    • Construction
    • Site Engineer
      • Apr 2009 - Jan 2010

       Prepares all type of constructional drawing of “Gaur hospital” (fifty bed) including all required departments, nurse’s quarters, Doctor’s quarters, and other essential quarters.  Attended corporate planning meetings and assisted in writing policies and procedures Closely co-ordinated with all departments to ensure smooth operation. Dealt tactfully and effectively with difficult employee, engineers, supervisor, clients etc. Established quality standards. Helped prioritize work schedule and delegated assignments. Expedited strategic planning process of key departments, resulting in new initiative to satisfy company objectives. Found mutually beneficial solutions to problems. Co-operation, competitiveness and motivation from all parties involved, particularly between companies. Prepare weekly project status reports for management. Planned, directed and coordinated activates of designated projects. Planned and organized work under minimal supervision of manager. Insured compliance with policies and procedures.

    • United States
    • Staffing and Recruiting
    • 1 - 100 Employee
    • Surveyor / Auto Cad Draftsman
      • Jul 2008 - Jan 2009

      Prepares the various building’s drawing at different type like as Collage building, hospital building, department store, shopping complex, and so many residential building as well as industries with there’s quarters through Auto Cad and also Road & irrigation structures and there required Structure (like as Slab culvert, Pipe Culvert, Causeway & typical drawing of Gabion works, Head Regulator, Aqueduct, Syphon, Village Road Bridge ( VRB ) , Foot Bridge, Elevated Lining, Fall Cum VRB, Vertical Drop, Unit outlet, Field Outlet etc.)

Education

  • Purwanchal Engineering Collage
    Associate’s Degree, Civil Engineering
    2004 - 2008
  • Durga higher Secondary School
    High School, Physical Sciences
    1992 - 2004

Community

You need to have a working account to view this content. Click here to join now