Bhavesh Sethia

LV Switchgear - Technical Sales Support Engineer at Musandam Electrical Equipment Co LLC
  • Claim this Profile
Contact Information
Location
Abu Dhabi Emirate, United Arab Emirates, AE

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Arab Emirates
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • LV Switchgear - Technical Sales Support Engineer
      • Jan 2023 - Present

      Abu Dhabi Emirate, United Arab Emirates

    • Ukraine
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Project Engineer - LV Switchgear
      • May 2018 - Nov 2022

      Sharjah, United Arab Emirates • Spearhead projects from conception, design, to pilot production in accordance with Client & Project requirement on Khazna Data Center Pod 4, 5, 6 Dubai & Abu Dhabi, Khazna Data Centre D3. • Performed the task of evaluating Quotation and preparing list of material required for the project. • Responsible for identifying and analyzing field issues, manufacturing problems, quality issues, work schedules and delivery estimation. • Responsible for coordinating with full internal team like… Show more • Spearhead projects from conception, design, to pilot production in accordance with Client & Project requirement on Khazna Data Center Pod 4, 5, 6 Dubai & Abu Dhabi, Khazna Data Centre D3. • Performed the task of evaluating Quotation and preparing list of material required for the project. • Responsible for identifying and analyzing field issues, manufacturing problems, quality issues, work schedules and delivery estimation. • Responsible for coordinating with full internal team like Estimation, Design, Procurement and Production in handling technical matters. • Responsible for preparing the Co-ordination/Discrimination report as per the specifications, single line drawings, and building layout given by the MEPs and also involved in the technical resolution of design problems that may include during field investigation or inspection or revision of engineering drawings as per consultant’s requirements. • Attended in Client and Consultants meetings, prepared scope of work, proposed creative solutions to resolve conflicts and best serve clients' needs. • Raised Job Order on obtaining manufacturing clearance from client and forwarding the same with final approved drawings to production for manufacturing. • Supervised and guided the execution of custom engineered orders of LV panels for Data Center Project in fabrication shop to insure product conformity to customer and industry standards. • Prepared weekly performance reports and assist in commercialization for possible cost saving, calculated running expenses, temporary manpower compensation and other indirect project costs. • Ensured on time procurement and production to achieve forecasted invoice. • Ensured safety procedures were enforced in the project, and proactively employed safety measures as needed. • Undertook routine correspondence with client to ensure complete satisfaction after delivery.

    • Estimation Engineer - LV Switchgear
      • Feb 2017 - Apr 2018

      UAE • Worked as Estimation Engineer for LV switchgear system in Commercial Building / Residential Schemes / Institutional Campus / Ware Houses / Cash n carry etc project upon receiving the enquiry from the customer within the targeted date. • Performed comparative analysis of estimates for different specifications of the work package and arrive at the optimal cost and specification as per standards set by company. • Responsible for Estimating the Type Tested Assembly for ACBs, MCCBs and… Show more • Worked as Estimation Engineer for LV switchgear system in Commercial Building / Residential Schemes / Institutional Campus / Ware Houses / Cash n carry etc project upon receiving the enquiry from the customer within the targeted date. • Performed comparative analysis of estimates for different specifications of the work package and arrive at the optimal cost and specification as per standards set by company. • Responsible for Estimating the Type Tested Assembly for ACBs, MCCBs and motor starters as per Local Regulations (DEWA, ADDC, SEWA and FEWA) and producing competitive prices through evaluation of instructions, specifications, Load schedule, Single line diagram, drawings, bill of quantities and discussions with technical and production departments. • Attended technical discussions (for product approval) and resolve technical issues that arise during design and production process. • Prepared the tender analysis sheet, monthly report for all the enquiries quoted, pending orders received, and presents it to the manager.

    • Project Engineer - Busway / Buduct System
      • Mar 2016 - Feb 2017

      UAE • Busway System ( Schneider Electric) : Responsible for assisting project manager and senior project engineer in preparing project appropriation requests for large projects • Perform the task of evaluating Schneider Electric quotation and preparing list of material required for the project. • Responsible for preparing project proposal, project cost and delivery estimation and work schedules. • Responsible for coordinating with Schneider Electric team and the Consultants in handling… Show more • Busway System ( Schneider Electric) : Responsible for assisting project manager and senior project engineer in preparing project appropriation requests for large projects • Perform the task of evaluating Schneider Electric quotation and preparing list of material required for the project. • Responsible for preparing project proposal, project cost and delivery estimation and work schedules. • Responsible for coordinating with Schneider Electric team and the Consultants in handling technical matters. • Attended in client meetings, prepared scope of work, proposed creative solutions to resolve conflicts and best serve clients' needs • Prepared weekly performance reports and assist in commercialization like calculated running expenses temporary manpower compensation and other indirect project costs. • Responsible for preparing Design of the busway isometric, horizontal and vertical drawings as per the specifications, single line drawings, and building layout given by the MEPs and also involved in the technical resolution of design problems that may include during field investigation or inspection or revision of engineering drawings as per consultant’s requirements. • Worked closely with other disciplines on multi-discipline projects. • Ensured safety procedures were enforced in the project, and proactively employed safety measures as needed.

    • Procurement Engineer
      • Aug 2015 - Mar 2016

      UAE • Worked as procurement engineer towards utilizing company procurement software to generate request for quotes and purchase requisitions as well as create and prepare reports based on materialdata. • Resolved technical issues between vendors, production and engineering and negotiated best possible price for materials. Identified target suppliers, established expectations, action plans and results to deliver required improvements and sustainability. • Created detailed ordering documents… Show more • Worked as procurement engineer towards utilizing company procurement software to generate request for quotes and purchase requisitions as well as create and prepare reports based on materialdata. • Resolved technical issues between vendors, production and engineering and negotiated best possible price for materials. Identified target suppliers, established expectations, action plans and results to deliver required improvements and sustainability. • Created detailed ordering documents, coordinated meetings with key personnel to discuss current issues. Identified key contacts for each step of the process. Initiated purchase orders and processed vendor invoices. • Worked with inventory department to restructure inventory system, providing a more accurate ordering process while minimizing over / under ordering of components. Assisted in developing a system to provide adequate documentation for incoming parts and improved supplier communications. • Reduced logistic issues while meeting project time lines, by understanding component functionality. Sought out knowledge on new products and options and presented those findings to the design and estimation teams, to ensure keeping cost in line with product costing objectives. • Maintained great relationship with customers, partners and vendors.

    • Project & Estimation Engineer Intern
      • Feb 2015 - Jul 2015

      Al Quaz Industrial Area 4 Dubai UAE • Studied the Construction and design of A - 60 Pressurized Offshore Cabins, workshop cabins, burner booms and all types of storage tanks. • Collaborated with technicians in the dismantling, maintenance and installation of various oilfield equipment’s

    • Professional Assistant
      • Sep 2014 - Jan 2015

      Dubai Professional Assistant for Administration Department under Dr. Mallika Fouzia.

    • Electrical & Electronics Engineer Intern
      • Jul 2014 - Aug 2014

      Udaipur Rajasthan • Created an excel spreadsheet to organize data associated with switchgear equipment • Observed techniques and procedures used by coworkers to validate performance of components for use in new projects

    • Electrical Engineering Intern
      • Jun 2014 - Jul 2014

      Zinc Smelter Debari Udaipur Rajasthan • Studied the Design of 220 / 132 KVA switchyard. • Performed voltage drop and short circuit analysis for single line diagrams of electrical systems

    • Professional Assistant
      • Feb 2014 - Jun 2014

      Dubai Professional Assistant for ECE Departement under HOD Dr. Guntru Vijaya.

    • Engineer Intern
      • Jun 2013 - Aug 2013

      Mumbai Maharashtra India • Performed an in-depth survey on the processes of distillation comprising of Multi Stage flash distillation, Fractional distillation. • Monitored and analyzed workflow, processes, and procedures and developed solutions in order to resolve bottleneck areas to maximize efficiency and productivity.

Education

  • Birla Institute Of Technology and Science, Pilani Dubai
    B.E. (Hons), Electrical and Electronic Engineering
    2011 - 2015
  • St. Paul's Senior Secondary School
    Graduation, Mathematics and Computer Science
    1997 - 2011

Community

You need to have a working account to view this content. Click here to join now