Anil Bhat

Sr. Manager Projects at ROOTS COOLING SYSTEMS PRIVATE LIMITED
  • Claim this Profile
Contact Information
Location
Patiala, Punjab, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Sr. Manager Projects
      • Nov 2013 - Present
    • India
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Project Engineer
      • Sep 2012 - Nov 2013

      ,Working as a Site In charge for Erection, Installation & comessioning of HVAC System for L&T power, a Super Critical Thermal Power Plant-2x700 MW Project at Rajpura, Punjab, India. ,Working as a Site In charge for Erection, Installation & comessioning of HVAC System for L&T power, a Super Critical Thermal Power Plant-2x700 MW Project at Rajpura, Punjab, India.

    • Oil and Gas
    • 1 - 100 Employee
    • O&M Engineer
      • Jul 2011 - Sep 2012

      •Planning, Installation, Testing & Commissioning of Machineries. •Generate Reports for corporate presentations. •Installation of Air Handling Unit (AHU) up to 22500 cfm & Exhaust Fan up to 22,000 cfm. •Good Knowledge of Planning & Handling the Water Make-UP Line for the CHW system. •Installation of Elevator’s (Thyson-Krup) including both Passenger & Service. •Worked during Installation of HSD Pipe Line area (35,000 Sq. ft). •Installation of Heavy duty Pump-Motor, VFD Panels, BTU Meter. •Knowledge for Installation of Thermo well, RTD, Flow meter, Thermistor, etc for CHW system •Testing & commissioning of measuring Instruments for HVAC system •O & M of Centrifugal (1160 T.R, 750 T.R) & Screw Water Chiller (310 T.R), Cooling Tower •Handle the tasks of identifying, analyzing and repairing the machine &, instruments •O & M of Pump-Motors, measuring Instruments like Flow meter, BTU meter, etc.(for HVAC system). •O & M of Diesel Engine up to 2 MW and their Auxiliaries Like PHE, Pump, Cooling Tower. •Handle the task of Water distribution system Pipe line for District Cooling (21050 TR Project.) •Responsible for Trouble shooting. Show less

    • Design Engineer
      • Jun 2010 - Jul 2011

      Equipment Re-modelling and Floor Planning with Layout Analysis, CFM Calculations, Air Flow Distribution. Equipment Re-modelling and Floor Planning with Layout Analysis, CFM Calculations, Air Flow Distribution.

Education

  • Kurukshetra University
    B-Tech(Mech.), Engineering
    2007 - 2010

Community

You need to have a working account to view this content. Click here to join now