Sarawak Energy
-
Malaysia
-
Utilities
-
200 - 300 Employee
-
Senior Mechanical Engineer
-
Aug 2022 - Feb 2023
-
-
-
Sarawak Energy Berhad
-
Malaysia
-
Utilities
-
700 & Above Employee
-
Head Of Section (Mechanical Maintenance Section)
-
Jan 2020 - Aug 2022
-
-
-
Sarawak Hidro Sdn Bhd
-
Malaysia
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Mechanical Engineer II
-
Nov 2015 - Jan 2020
-
-
Graduate Trainee
-
Apr 2015 - Jan 2020
This the On job training program where the objective is to educate me on how the hydroelectric power plant is operating, The plant is located at BAKUN at Belaga district. It is a the biggest Dam in South East Asia with the power generating capacity of 2400Mw. Equip with 8 units of Francis turbine built by ALSTOM and IMPSA. Operation DepartmentI had been introduce to the Power Purchase Agreement document, where I had learn how to do the billing to the client. Exposed to the hydroelectric plant operation by following the shift charge engineer to conduct plant monitoring as well plant maintenance work.Assisting the Shift charge engineer to conduct Isolation and normalization at 275kv switch yard.Assisting the Shift charge engineer to conduct Isolation and normalization at Power House.The system that I had been expose for the isolation and normalization are Cooling water system, Oil cooling system for bearing, Miniature circuit breaker for equipment that required electric motor and the lifting and lowering the gate of Penstock and Draft tube.Maintenance Department.Learning how to troubleshoot the Journal Bearing system and try to fixed it within the limited time frame. Conducting preventive maintenance on Governor, monorail crane and compress air system. investigating the current performance of Chiller system by identifying the problem and giving suggestion to overcome the short coming of the chiller system. Introduced to the application of the RTD and analog 4-20mA sensor. Show less
-
-
-
Petra Energy Berhad
-
Malaysia
-
Oil and Gas
-
400 - 500 Employee
-
Field Engineer(Internship)
-
Jun 2013 - Sep 2013
1.Planning for hook-up, commissioning and maintenance for Shell Sarawak Sdn Bhd's oil and platform. Prepared jobcard for on-site team so that they can finish the task with the allocated time frame successfully.Introduced to project management procedure and Primavera. 2.Assigned to conduct pre-audit of Petra Anis (new ship) and updated safety documentation for marine crews. 3.Assisted Safety officer to conduct safety briefing and conduct toolbox meeting at the building yard to ensure that every personal working in healthy condition. 4.Compiled closed out report for Shell Sarawak Sdn Bhd project and updated the Welding procedure certificate and make sure every welding task is up to the desirable standard. The ASTM standard is a major guide line in decision making when it come to approve the welding project. Outcome; 1. Successfully reduce the time to compile the closed out documentation process. 2. Enhance my knowledge of project planning and management via Work-pack department. 3. Instilled the 12 life saving rules by Shell in my daily life. Show less
-
-