Bernardo Xavier

at Proper Marine
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Rio de Janeiro, Rio de Janeiro, Brazil, BR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Osvaldo Moura

Bernardo é um excelente profissional, bastante dedicado e comprometido. Recomendo, na certeza de que ele será uma excelente adição à qualquer equipe."

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Cargo Handling
    -

Experience

    • Brazil
    • Oil and Gas
    • 1 - 100 Employee
      • Apr 2011 - Present

      Proper Marine develops engineering solutions for naval and offshore projects and consultancy. With a well qualified team of engineers and designers, we provide our clients with solutions that range from the elaboration of basic engineering projects to detailing. Focusing on solutions for engineering, besides the project field, we offer consultancy services, using the best practices, where success and efficiency converge. Some of the main engineering services executed are outlined below.Lifting superintendent for Pelicano 1 crane barge lifting projects (2014-03, present)Work to organize, coordinate and control the execution of handling and lifting activities, both performed by subcontractors and in direct hiring, in order to ensure the management of the interfaces with all parties involved in the project as well as engineering departments, overseeing the availability of handling and lifting equipment and verifying that works are correctly carried out in accordance with project documentation design basis and schedule, in which main projects are outlined below: - FPSO Cidade de Maricá topside integration campaign at Brasa Shipyard (12 lifts, 8600 tonnes);- 3 x Pelicano 1 overload test campaign (1 lift, 2255 tonnes);- PETROBRAS FPSO P74 / P75 lifting campaign at Inhaúma Shipyard (2 lifts, 2400 tonnes);- Topside module lifting campaign at ENAVAL Shipyard (1 lift, 800 tonnes);- Ocean Rig Mylos BOP lifting campaign at TPAR terminal (2 lifts, 400 tonnes);- Bulk carrier lifting campaign at EISA Shipyard (12 lifts, 1100 tonnes);- Oil tanker engine integration lifting campaign at Mauá Yard (1 lift, 400 tonnes);For each lift, approved proposed rigging arrangement from engineering team, lead inspections on the lifting item and lay down location with clash check surveys and decide position of stabbing guides and bumpers installation. Show less

      • Jul 2010 - Present

      Assistant Lifting superintendent for Pelicano 1 crane barge lifting projects (2013-11, 2014-3)Worked alongside the lifting superintendent being the single point contact between all Brazilian involved personnel (including Pelicano crane operator) and lifting superintendent (including translation from English to Portuguese and vice versa in order to ensure clear communication during the liftings operations), as outlined below:- FPSO Cidade de Ilha Bela topside integration campaign at Brasa Shipyard (18 lifts, 15,550 tonnes);- PETROBRAS FPSO P62 flare integration campaign at EAS Shipyard (4 lifts, 450 tonnes);- Oil tanker engine integration lifting campaign at Mauá Yard (1 lift, 400 tonnes);Lifting campaign engineering projects for crane barges (2012-11, present)Engineering projects for developing rigging assembly, mooring and lifting drawings as well as engineering calculations, step by step procedures, and lifting engineer site attendance for technical support issues.- FPSO Cidade de Maricá topside integration campaign at Brasa Shipyard (12 lifts, 8600 tonnes);- FPSO Espirito Santo accommodation module integration campaign at Campos Basin (4 lifts, 160 tonnes) – site attendance project;- FPSO Cidade de Ilha Bela topside integration campaign at Brasa Shipyard (18 lifts, 15550 tonnes);- PETROBRAS FPSO P62 flare integration campaign at EAS Shipyard (4 lifts, 450 tonnes);- Bulk carrier lifting campaign at EISA Shipyard (12 lifts, 1100 tonnes);- Topside module lifting campaign at ENAVAL Shipyard (1 lift, 800 tonnes);- PETROBRAS FPSO P74 / P75 lifting campaign at Inhaúma Shipyard (2 lifts, 2400 tonnes);- Oil tankers engine integration lifting campaign at Mauá Yard (2 lifts, 1200 tonnes);- DRU machinery lifting campaign at Vitória terminals (3 lifts, 400 tonnes);- DRU NS Arpoador lifting campaign at EJA Shipyard (7 lifts, 3500 tonnes); Show less

      • Jul 2012 - Present

      Towing and seafastening marine projects (2012-11, present)Engineering projects for developing towing arrangement drawings and calculation, establishment of tow route, vessel loading conditions, stability and longitudinal resistance verification as well as tug selection and convoy arrangement. Also developing seafastening arrangement drawings and calculations with stoppers, steel cables, etc.- PLSV towing from Angra dos Reis to Açu, Rio de Janeiro;- FPSO P62 towing plan from EAS Shipyard to Roncador field;- DRU NS Arpoador towing plan (Guanabara Bay to Angra, TPAR, as well as Vitória and EJA yard);- Incoming vessels at Guanabara Bay towing plans;- Crane barges towing plans;- DRU machinery lifting campaign at Vitória terminals;- BOP seafastening at Mac Laren Shipyard;Heavy lift vessels load in, load out marine projects (2012-11, present)Engineering projects for heavy lift vessels load in, load out operations in sheltered waters with engineering calculation for ballast plan achievement, tug selection convoy arrangement and step by step procedure for operation execution.Mooring and anchorage marine projects (2012-11, present)Engineering projects for calculation of mooring and anchorage designs, developing mooring plan arrangement drawings with mooring inventory items, calculation of maximum offsets;Engineering coordination for Pelicano 1 crane barge repair and refurbishment program (2011-10, 2012-10)Lead engineer for preparing repair scope of work for repair and overhaul campaign, involving coordination of outsourcing resources activities, attending coordination meetings and on site follow up activities. Show less

    • Professional Training and Coaching
    • 1 - 100 Employee
    • Professor
      • Jul 2010 - Present

      Lectures and classes for Offshore Installation Manager (OIM), Ballast Operator (BO) and Maintenance Supervisor (MS) courses. Lectures and classes for Offshore Installation Manager (OIM), Ballast Operator (BO) and Maintenance Supervisor (MS) courses.

    • Approval Engineer
      • Jul 2010 - Jul 2011

      Brazilian Navy Ship Repair 2010-06,2011-07 Work conducted on final inspections for approval and delivery of structural repair services for the Brazilian Navy Ships. Offshore Container Cargo Test 2010-06, 2011-07 Work conducted on cargo test for approval of structural maintenance on offshore containers. Brazilian Navy Ship Repair 2010-06,2011-07 Work conducted on final inspections for approval and delivery of structural repair services for the Brazilian Navy Ships. Offshore Container Cargo Test 2010-06, 2011-07 Work conducted on cargo test for approval of structural maintenance on offshore containers.

    • Norway
    • Public Safety
    • 700 & Above Employee
    • Engineer at Technical Analyses Dept.
      • Mar 2008 - Jul 2010

      Integrated management of Naval Engineer Petrobras Project, 2009-03, 2010-06; Offshore Engineer responsible for maintenance of global structural and hydrodynamic models to emergency response of Semi Submersible platforms enclosed in the contract. Includes prior global structural analyses and motion analysis. SEDCO 135-D Stochastic fatigue analysis of brace column joints, 2007-06, 2007-12; Work conducted with Offshore Structures (DNV Head Office – Oslo, Norway). Risk Based Inspection analysis on brace column joint (Petrobras-SS) 2007-06, 2007-12; Work conducted with Offshore Structures (DNV Head Office – Oslo, Norway). Study executed for new inspection plan determination on column brace joints on splash zone area of the Semi-Submersible offshore production Unit. Development of numerical model stability analysis and prediction 2009-03, 2010-05; Worked in SSTAB package for the development for Semi Submersibles and FPSO’s were validated using Class approved stability models and are currently in on board these Units. Riser support structural analysis, 2007-06, 2007-12; Structural verification for yield buckling and fatigue of Riser support structure for Semi Submersibles. Show less

Education

  • Universidade Federal do Rio de Janeiro
    Master of Science - MS, Mechanical Engineering
    2014 - 2017
  • UFRJ - Universidade Federal do Rio de Janeiro
    Bachelor of Naval Architecture and Marine Engineering, UFRJ/COPPE, Naval and Offshore Design
    2004 - 2009
  • Colégio Fenix

Community

You need to have a working account to view this content. Click here to join now