benny salam

Electrical Specialist at PT. Truba Jaya Engineering
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Electrical Specialist
    • Sr. Electrical Supervisor
      • Jun 2008 - Apr 2011
    • Sr.Electrical supervisor
      • Feb 2008 - Jun 2008
    • Sr. Electrical Supervisor
      • Apr 2007 - Jul 2007
    • Electrical Supervisor
      • Jan 2005 - Aug 2006
    • Sr. Electrical Supervisor
      • Nov 2003 - Jul 2004
    • Electrical Supervisor
      • Apr 2002 - Sep 2002
    • Electrical Supervisor
      • May 1998 - Jul 1999
    • Japan
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Electrical Commissioning Engineer
      • Nov 1995 - Apr 1998

      1. Checking and Testing all Panels M C C,, M V switch gear prior commissioning. 2. Checking and Testing of Panel cathodic Protection system, Atlas Copco Air Supply system, Emergency Diesel Generator and Intake Air Filter system. 3. Checking and Testing prior Commissioning of motors demineral water Plant, Desalination Plant, Waste Water Plant and Hydrogen Gas system. 1. Checking and Testing all Panels M C C,, M V switch gear prior commissioning. 2. Checking and Testing of Panel cathodic Protection system, Atlas Copco Air Supply system, Emergency Diesel Generator and Intake Air Filter system. 3. Checking and Testing prior Commissioning of motors demineral water Plant, Desalination Plant, Waste Water Plant and Hydrogen Gas system.

    • South Korea
    • Construction
    • 700 & Above Employee
    • Electrical Supervisor
      • Aug 1994 - Sep 1995

      Duties & Responsibilities: 1. Supervise the Employee to install Panels M C C, L V Switch gear, M V switch gear, BOP control panel prior Commissioning done. also supervise the worker to pulling cable control cable Instruments in area Fly ash. 2. Assist the team vendor to check up a system Cathodic Protection and team vendor Fire alarm. Duties & Responsibilities: 1. Supervise the Employee to install Panels M C C, L V Switch gear, M V switch gear, BOP control panel prior Commissioning done. also supervise the worker to pulling cable control cable Instruments in area Fly ash. 2. Assist the team vendor to check up a system Cathodic Protection and team vendor Fire alarm.

Community

You need to have a working account to view this content. Click here to join now