Benediktus Hendrawan

Procurement Strategic Sourcing Department Head at PT Adaro Indonesia
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Banten, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Mining
    • 300 - 400 Employee
    • Procurement Strategic Sourcing Department Head
      • Dec 2022 - Present

    • Indonesia
    • Engineering Services
    • 700 & Above Employee
      • Jan 2016 - Mar 2023

      Project Name: Tangguh Expansion Project Train 3Client: BP IndonesiaProject value: USD 3.5 billionWorked since FEED stage of design until construction stage of Tangguh Expansion Project (Train 3). Aims to build on the operations of the two existing liquefaction trains at the Tangguh onshore site. It will add 3.8 million tons per annum of liquefaction capacity to Tangguh, bringing total capacity to 11.4 million tons per annum.Responsibilities: - Analyze supply market, anticipate changes and drive associated procurement engineers.- Evaluate suppliers and make final supplier base decision with relevant stakeholders.- Supplier negotiation and selection for the agreed category.- Ensure compliance with regulatory, legal requirement and procurement policies.- Ensure implementation of sustainable total cost of ownership, cost analysis and benchmarking.- Procurement KPI performance management.- Maintain relationships with project suppliers.- Mediation and dispute handling between project suppliers and stakeholders.- Preparing purchase order general terms and condition which back to back with project contract requirement.- Create performance improvement plans with stakeholders.- Coordinate supplier readiness based on coming demand, synchronizing with stakeholders and ensure suppliers are ready to execute rollout plans. Monitor supplier capacity for rollout and solve potential gap with support from stakeholders.- Control supplier technical and capacity assessment.- Support PO process / issues coming from suppliers, including supporting supplier on invoicing / payment issues when applicable (accountability under Account Payable team). Show less

      • Mar 2012 - Jan 2016

      Project Name: 1. Production Processing Facilities Banyu Urip Project2. Senoro Gas Development ProjectClient: 1. Mobile Cepu, Ltd.2. Joint Operation Body Pertamina Medco.Project value : 1. USD 1.3 billion 2. USD 2.1 billionThe Banyu Urip project is located onshore on the island of Java between the cities of Cepu and Bojonegoro. The Central Field Facilities (CFF) will include well pads that are connected to a Central Processing Facility (CPF). The CFF also includes buildings and infrastructure required to support operation, maintenance and facility logistic. The stabilized crude oil from the CPF will be exported through onshore and offshore pipelines to a Floating Storage Offloading (FSO) vessel located offshore of the north coast of Java near the city of Tuban.Donggi Senoro is the second largest gas infrastructure project in Indonesia after Tangguh LNG in Papua. The main scope of work for this project is to build the Central Processing Plant (CPP) to treat gas with capacity of 310 mmscfd.Responsibilities: - Developing inquiry package, market analysis, supplier qualification and supplier negotiation for mechanical, piping, electrical, instrument and civil works.- Preparing Prequalification Questionnaire analysis and recommendation.- Developing Cost Benefit Analysis (CBA).- Developing Purchase Order.- Expediting materials, ensuring the timely delivery of Equipment/Material as per P.O. terms and project schedule.- Monitoring Progress & Reporting the status to Lead Procurement / Manager. Show less

      • Feb 2011 - Mar 2012

      Project Name: The South Sumatra NGL Project (SSNP)Client: E1 Corporation and PERTAGAS Project value: USD 230 millionExtraction Plant designed to process 250 MMscfd of gas, which will produce 160 metric tons per day of propane product and 546 metric tons per day of mixed LPG product and 225 metric tons per day of condensate product at the Fractionation plant.Responsibilities: - Developing inquiry package, market analysis, supplier qualification and supplier negotiation for piping and civil works.- Preparing Prequalification Questionnaire analysis and recommendation.- Developing Cost Benefit Analysis (CBA).- Developing Purchase Order.- Expediting materials, ensuring the timely delivery of Equipment/Material as per P.O. terms and project schedule.- Monitoring Progress & Reporting the status to Lead Procurement / Manager. Show less

      • Feb 2009 - Feb 2011

      Project Name: Jambi Merang Development Gas Production FacilitiesClient: Joint Operation Body Pertamina – Hess Jambi MerangProject value: USD 195 millionJambi Merang Development Gas production facilities which consist of LPG Plant with capacity of 120 MMscfd, Gas Sweetening Unit and 150 km Pipeline.Responsibilities:- Expediting long lead items; metering system, vessels, pumps, valves, steel structure and packages.- Participating on technical clarification before purchase order issue to vendor, to make sure fabrication schedule is align with project schedule.- Ensuring the timely delivery of Equipment / Material as per P.O. terms and project schedule.- Monitoring Progress & Reporting the status to Project Manager on weekly basis.- Tracking the major milestones.- Raising alarms/warnings for delay in progress and taking corrective action in consultation with Project Manager.- Expediting vendor documents approval and MDR.- Generate MRS for third party inspection.- Coordinate with Engineer for documents approval.- Coordinate with QA/QC for documents approval, arranging inspection schedule and FAT (Factory Acceptance Test).- Coordinating with logistics division for issuance of the shipping instruction to vendor. Show less

      • Sep 2007 - Feb 2009

      Project Name: Onshore Oil Treating Facility and LPG Recovery Plant Pangkah Liquids Development Project (UPD Phase 2)Client: Hess (Indonesia – Pangkah) Limited Project value: USD 200 millionThe UPD Phase II project develops 2 major facilities, Oil Treating Facilities (OTF) and LPG Facilities (LPGF). The OTF is designed to stabilize 132.5 m3 /hr (20,000 BOPD).The LPG facility is designed to deliver 130 MMscfd residue gas and to produce 28.2 m3/hr (327MT/day) segregated Propane and 16.7 m3/hr (223MT/day) segregated Butane. The LPGF mechanical completion and plant hand-over is achieved on March 14th, 2009, two weeks ahead of project schedule.Responsibilities: - Resident expediter for Produce Water Treatment Package. Supervising at vendor workshop Batam (PROFAB).- Supervised vessels and packages fabrication to ensure the timely delivery of the Package as per P.O. term and project schedule.- Coordinate with Jakarta Engineer for documents approval.- Coordinate with QA/QC for documents approval, arranging inspection schedule and FAT (Factory Acceptance Test).- Coordinating with logistics division for issuance of the shipping instruction to vendor.- Supporting structural work for related discipline; piping, electrical, mechanical, etc.- Site and vendor survey.- Reviewing shop drawing for approval to be used as detail guidance to commence fabrication and construction work.- Performing problem solving discussion with related discipline to overcome engineering matters and interference of structure layout as whole plot plan.- Performing problem solving discussion with steel structure fabricator to overcome engineering matters.- Supervised and expediting steel structure fabrication, supporting quality control and material inspection at vendor workshop to ensure the timely manner of the materials delivery as per project schedule. Show less

    • Engineer
      • Mar 2006 - Sep 2007

      Client : Various Clients Position : Engineer Responsibilities: - Preparing design calculation for canals, tunnels, bridges and buildings. - Performing problem solving discussion with Netherlands engineer. - Preparing general arrangement drawings. - Shop drawing review and approval prior to fabrication. - Design 2D & 3D rebar drawings using Allplan (3D Rebar Modeling) and Autocad. - Generate MTO and BOQ. - Responsible for maintaining input and output CAD standard drawings (layers, symbol, attributes, autolips, export configuration between Autocad, Microstation and Allplan) Show less

  • PT. RAYA SURVERINDO
    • Jakarta, Indonesia
    • Engineer
      • Mar 2005 - Mar 2006

      Project Name : 12 Small Ports In East Indonesia Client : Indonesia Ministry of Public Works Position : Engineer Responsibilities: - Preparing structural design and calculation for jetty structure. - Establishing material take off. - Preparing BOM and BOQ. - Preparing general arrangement drawings Project Name : 12 Small Ports In East Indonesia Client : Indonesia Ministry of Public Works Position : Engineer Responsibilities: - Preparing structural design and calculation for jetty structure. - Establishing material take off. - Preparing BOM and BOQ. - Preparing general arrangement drawings

Education

  • Universitas Diponegoro
    S1, Civil Engineering
    1999 - 2004

Community

You need to have a working account to view this content. Click here to join now