Ben Crawshaw

Project Manager at MLP Co Pty Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Sydney Area

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Construction
    • 1 - 100 Employee
    • Project Manager
      • Jul 2016 - Present

      Throughout the last 6 years working for MLP Co as a Project Manager I have delivered numerous projects ranging in value from $1M -$20M in the building sector. Projects include Laboratories, Commercial and Industrial fitouts, Multi-Residential builds, Childcare facilities and High end Residential projects. I was also General Manager of the businesses in-house joinery company which serviced all of the MLP Co projects as well as providing services to private clients ranging from Tier 1 builders on major building infrastructure projects to detailed high end residential projects.

    • Australia
    • Civil Engineering
    • 200 - 300 Employee
    • Project Engineer
      • Aug 2015 - Jul 2016

      I was employed as the Project Engineer on the Allawah Bridge Replacement Project. This project involved the complete demolition of a 100 year old Jack arch bridge within the Sydney Trains Rail corridor and replacement with 40 metre long, single span, steel box girders. All work was co-ordinated around the running of live trains and possession based work. works involved included installation of 40 + 900 diameter x 14 meter piles adjacent to live trains; self performed FRP of structural bridge elements; Installation of new OHW to new allignment; Transport and Installation of 7 x 40 metre long steel box girders; Installation of precast bridge elements, Services relocation including 11kV and a 750mm diameter watermain across the new bridge; Community consultation.

    • Project Engineer
      • Nov 2014 - Aug 2015

      I was employed as one of the Project Engineer's in charge of a number of sites including Blacktown, Richmond, Moss Vale, and Campbelltown. The project involved updating, previously designated Sydney Trains staff parking, for use by the public as part of the Transport Ministers promise to increase the amount of parking spots made available for public use.

    • Australia
    • Construction
    • 700 & Above Employee
    • Services Engineer
      • Mar 2014 - Nov 2014

      I was employed as a services engineer on the Sydney Opera House VAPS Project. This project involved redirecting deliveries to a three story underground facility located directly beneath the Sydney Opera House. My role on this project included assisting with the co-ordination, installation and fitout of the following:- Fire services- Electrical services - Hydraulic services- Mechanical services- Civil storm water services

    • Site Engineer
      • Nov 2012 - Mar 2014

      I was employed as a site engineer on the Sydney Light Rail Extension Project. This project extends the existing Sydney light rail from Lilyfield to Dulwich Hill adding 9 new stations along the line. As part of the project delivery team I helped in the construction both Taverners Hill and Marion st stations which involved overseeing the following:- Installation of over 100 reinforced concrete piles- Installation of 30 steel screw piles- Installation of temporary strand anchors- Excavation works at each stop - FRP of stop support structures- Construction of stop block work walls- Installation of storm water drainage to stops- Construction of embankment retaining wall structures adjacent to a heritage listed canal structure- Temporary propping of 14m full height precast panels adjacent to Parramatta road- Installation of over 150 precast elements to form the platform structures- Construction of platform concrete topping slabs- Raising of an existing 100+ year old truss bridge up 500mm over Parramatta road during live traffic conditions- Installation of a new 4 m wide pedestrian walkway spanning 30 over Parramatta road, connected to the side of the existing iron truss bridge.

    • Graduate Engineer
      • Dec 2011 - Nov 2012

      I was employed as a graduate engineer working on the Bulk Liquids Berth 2 site. The facility is used to unload ships carrying bulk liquids such as fuel, oil etc. and transfer it to a holding facility close by. My main responsibilities included overseeing the following:- Construction of 18 x 60T precast concrete mooring dolphin shells for the new wharf structure- Construction of 21 x 80T precast concrete girders for the new wharf structure- All onshore services including storm water, hydraulics and fire pipework and all associated civil work- Installation and fit out of the onshore amenities office building- Preparation of two car park facilities including kerbing ,asphalting and street lighting- Construction of services culvert around live gas mains including jet grouting and all associated FRP works

    • Student Engineer
      • Nov 2009 - Nov 2011

      I was employed on the Mardi - Mangrove Link Project as a student engineer. This project involved the construction of two new pump stations along with the construction of over 21 kms of 1080mm diameter pipe. As a member of the construction team my main responsibilities included:- Procurement- Quality assurance- Tracking of construction progress- Dilapidation reports

Education

  • Sydney University
    Civil Engineering, Civil Engineering
    2007 - 2011
  • Killarney Height High School
    HSC
    2000 - 2005

Community

You need to have a working account to view this content. Click here to join now