Ben Bumjin Han
Senior Project Engineer at SH Engineering Pty Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Korean Native or bilingual proficiency
-
English Professional working proficiency
-
Japanese Elementary proficiency
Topline Score
Bio
Credentials
-
토목기사
한국산업인력공단
Experience
-
SH Engineering Pty Ltd
-
Australia
-
Civil Engineering
-
1 - 100 Employee
-
Senior Project Engineer
-
Oct 2022 - Present
’22.10 ~ Today Suburban Rail Loop Project – Precast consultant/ Senior Project Engineer Victoria, Australia JHGA JV Tender team • Responsible for deliverables of Tunnel Lining Segment Manufacturing Facility • Assist with the definition of equipment, layout, technical input and programming or any function as required to facilitate the successful tender. • Interact with the Contractor or other professionals engaged by the Contractor, such as engineers or designers or any stakeholders ’22.10 ~ Today Suburban Rail Loop Project – Precast consultant/ Senior Project Engineer Victoria, Australia JHGA JV Tender team • Responsible for deliverables of Tunnel Lining Segment Manufacturing Facility • Assist with the definition of equipment, layout, technical input and programming or any function as required to facilitate the successful tender. • Interact with the Contractor or other professionals engaged by the Contractor, such as engineers or designers or any stakeholders
-
-
-
Lendlease
-
Australia
-
Real Estate
-
700 & Above Employee
-
Quality Coordinator
-
Dec 2020 - Oct 2022
’20/12 ~ ’22.10 Metro Tunnel Project – Quality Coordinator/ Project Engineer Victoria, Australia CBD South Shaft & Surfaces• Conduct a quality lead role of CBD South Shaft & Surfaces Teams in Flinders OSD, City Square, Federation Square and Flinders Link• Review construction documentation (AMS, ITP, ITC, etc.) for compliance to Quality Assurance and Control standards/best practices, compliance with PS&TR, Specifications and design• Provide ongoing guidance and support to the team on quality objectives• Attend site coordination meetings/construction quality meetings for each site to ensure quality assurance and control practices are implemented as planned• Plan/Review work lot structure and contents and submit Construction Work Lots for each design package to IR/RPV for certification • Ensure Quality KPIs are maintained (Work Lot/NCR closure)• Provide a weekly report to QM to update ongoing quality issues and escalate potential completion risks
-
-
Project Engineer/QA Engineer
-
Sep 2018 - Dec 2020
’18.09 ~ ’20.12 Metro Tunnel Project – Quality Coordinator/ Project EngineerTLSMF(Tunnel Lining Segment Manufacturing Facility) – Project Engineer/QA Engineer• Responsible for the establishment of the precast yard (Factory slab and plinth, Crain Rail Footings, Batch Plant Slabs, and Ancillary buildings)• Responsible for the traceability system (Create/Maintain/Monitor)• Conduct a quality lead role of TLSMF• Responsible for overall quality management of precast segments
-
-
Project Engineer
-
Aug 2017 - Aug 2018
Level Crossing Removal Project – Caufield to Dandenong, Victoria, Australia '18.02 ~ '18.08 – Area 2&3 – Viaduct & Civil team• Construction of ancillary works of Viaduct• Assessment of internal completion of the Viaduct (Bearing and Restraints, Piers and Crossheads & Beam)• Construction of linear park'17.08 ~ '18.02Level Crossing Removal Project – Caufield to Dandenong – Area 1 Pakenham Precast Yard– Project Engineer Victoria, AustraliaProduction of precast segments (PSM)• Manufacturing of span by span bridge segments (long line and short line)
-
-
-
Samsung C&T Corporation
-
South Korea
-
Construction
-
700 & Above Employee
-
Manager/Senior Project Engineer
-
Feb 2014 - Feb 2017
‘14.02 ~ '17.02 Riyadh Metro Project – Package 3 – Senior Project Engineer (Riyadh, Kingdom of Saudi Arabia) This project, package 3, is a 7.891 billion USD metro project of total 64.5km (Line 4,5,6) in Riyadh. Package 3 is comprised of 26.6 km tunnels, 29.7 km viaducts, 8.2 km at grade, 23 stations with challenging schedule of 60 months. The superstructure of viaducts consists of PSM (Precast Segmental Method), FSLM (Full Span Launching Method), PCB (Precast Beam) and BCM (Balanced Cantilever Method). PSM and BCM covers 10.547km and 1.324km respectively including all curved section (min.radius 140m) and longer spans (52/72/96/120m). • Responsible for delivering Precast yard/PSM/BCM site (Including management of contracts, all cost forecasting and reviewing all subcontractor claims) • Responsible for Erection of BCM bridge segments with the coordination with the relevant stakeholders and teams (interface/traffic/utility) • Establishment of the precast yard and the access road
-
-
-
Samsung C&T Corporation
-
South Korea
-
Construction
-
700 & Above Employee
-
Assistant Manager
-
Mar 2010 - Feb 2012
’10.03 ~ ’12.02Samsung C&T HQ Office– Assistant Manager (Seoul, Korea) Task forces were organized in each division (Civil/Building/Housing/Plant) to recruit local/global staffs as per the keynote of CEO, expansion of business. Technical staffs/engineers are selected as members of task force instead of deploying professional recruiters. • Recruiting local/global staffs for Civil Division (220 staffs including 15 global staffs and 4 executives over 2 years)
-
-
Site Engineer
-
Dec 2006 - Feb 2010
’07.07 ~ ’10.02Incheon Bridge – Site Engineer/Design engineer (Incheon, Korea) This project was a 1.4 billion USD project that includes 11.658km bridge crossing waterway between Incheon and Youngjong Island. The bridge is comprised of 3 different types of structures: 1.48km cable stayed bridge with 800m main span which is 5th longest at the time of construction and 0.89km balanced cantilever bridge and 8.4km viaduct built with launching girder (Full Span Launching Method – pre/post tensioned – box girder type).• Responsible for all activities of production in precast yard of FSLM girder (336 numbers of single box girder of W×H×L=15.7m×3.0m×50.0m & 1300 ton) with pre-tensioning(Longitudinal 240EA/Transversal 380EA) • Design coordination for ancillary works/exhibition center & management of design packages/as-built drawings
-
-
-
-
Site Engineer
-
Mar 2003 - Feb 2006
Mar 2003 ~ Feb 2006 Mulgeum Water Purification Plant – Site Engineer (Yangsan, Korea) Construction of 114,000 ton capacity water purification plant including earthworks and reinforced concrete structures Mar 2003 ~ Feb 2006 Mulgeum Water Purification Plant – Site Engineer (Yangsan, Korea) Construction of 114,000 ton capacity water purification plant including earthworks and reinforced concrete structures
-
-
Education
-
Seoul National University
Bachelor of Science in Civil Engineering & Business Administration, Civil Engineering -
Sungkyunkwan University
Master of Science in Civil Engineering, Bridge Engineering