Belal Abdullah
Project Manager at 3W Networks- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Elementary proficiency
-
Arabic Native or bilingual proficiency
Topline Score
Bio
Kandil M
Eng.Belal possesses a great engineering sense and knowledge in different fields of mechanical engineering. He shows great energy and dynamics in his job and all tasks assigned to him. I would like to wish him a prosperous future.
Kandil M
Eng.Belal possesses a great engineering sense and knowledge in different fields of mechanical engineering. He shows great energy and dynamics in his job and all tasks assigned to him. I would like to wish him a prosperous future.
Kandil M
Eng.Belal possesses a great engineering sense and knowledge in different fields of mechanical engineering. He shows great energy and dynamics in his job and all tasks assigned to him. I would like to wish him a prosperous future.
Kandil M
Eng.Belal possesses a great engineering sense and knowledge in different fields of mechanical engineering. He shows great energy and dynamics in his job and all tasks assigned to him. I would like to wish him a prosperous future.
Credentials
-
Project Management Professional (PMP)®
Project Management InstituteApr, 2023- Nov, 2024
Experience
-
3W Networks
-
United Arab Emirates
-
Telecommunications
-
100 - 200 Employee
-
Project Manager
-
Sep 2023 - Present
-
-
-
PETROJET
-
Egypt
-
Construction
-
700 & Above Employee
-
Project Engineering Manager
-
Dec 2022 - Sep 2023
• Ensure that the set of technical solutions adopted for the project are in line with the project’s time, cost, quality and safety objectives. • Manage the engineering activities in terms of quality, design, deliverables, schedule, reporting, budget, progress control. • Ensure effective interdisciplinary technical co-ordination. • Create Engineering Document Deliverables Control Register. • Analyze changes in scope of work and assist Project Manager in assessing relevant costs and schedule impacts. • Provide assistance to Project Management Team in the technical discussions with clients and enhance the interfaces with the other project activities.• Provide engineering support to procurement and construction teams. Show less
-
-
Project EP Manager
-
Jun 2022 - Dec 2022
• Ensure that the set of technical solutions adopted for the project are in line with the project’s time, cost, quality and safety objectives.• Manage the engineering activities in terms of quality, design, deliverables, schedule, reporting, budget, progress control.• Ensure effective interdisciplinary technical co-ordination.• Create Engineering Document Deliverables Control Register.• Analyze changes in scope of work and assist Project Manager in assessing relevant costs and schedule impacts.• Provide assistance to Project Management Team in the technical discussions with clients and enhance the interfaces with the other project activities.• Provide engineering support to procurement and construction teams. • Follow Up and manage daily procurement activities. • Ensure that procurement processes are aligned with project plan in terms of sticking to P.O placement dates, vendors management and vendor documents approval. • Follow up daily expediting activities to make sure that the project materials are delivered as per project plan. Show less
-
-
Senior Project Engineer
-
Aug 2020 - Jun 2022
Project Title: Construction Works for Water Transmission System from Sohar To Ad Dhahirah Governorate.Client: Public Authority for Electricity and Water (PAEW)Project Type: EPC JV with SEDEProject Status: CompletedKey accomplishment:• Waived negative variation of 2 million USD claimed by Joint Venture partner due to re-routing of 8 Km portion of the pipeline during execution phase, after performing technical and contractual verification.
-
-
Project Manager
-
Jul 2019 - Aug 2020
Project Title: Re-routing of Existing 8-inch Gas Pipeline Inside MOD AreaClient: Oman Gas Company (OGC) / MODProject Type: EPCProject Duration: 12 MonthsProject Status: CompletedProject scope was to re-route a portion of 3.5 Km of existing 8 Km gas Pipeline from SQU (Sultan Qaboos University) to MAM inside MOD, in order to free space for coming development in Al Banadar Area and decommission, purge and demolish the old pipeline and reinstate the area. The Scope included depressurizing, venting and complete shutdown to existing pipeline in order to carry out the tie-ins works, between existing portion and re-routed portion.Key Accomplishments:• Delivered the Line Pipes one month ahead of schedule.• Followed up construction activities on daily basis.• Completed trenching as well as site preparation works two weeks ahead of schedule.• Completed construction work safely, without any LTI.s, as per specifications’ requirements.• Delivered all construction, pre-commissioning as well as commissioning materials on time, amid COVID-19 outbreak.• Accomplished shutdown in 2 days outperforming the 5 days planned.• Completed Project successfully on time with approximately 15% less than planned budget (Cost Saving).• Received Appreciation letter for Company from Client for project team performance. Show less
-
-
Senior Project Engineer
-
Nov 2016 - Jul 2019
Project Title: EPC Works for Ad Duqm 36” PipelineClient: Oman Gas Company (OGC)Project Type: EPCProject Duration: 36 MonthsProject Status: Completed• Verified scope, pre-bid support, participated in budgeting and prepare risk register during project initiation phase.• Participated in preparation of project schedule, project execution plan / project management plan as well as project procurement plan during planning phase.• Reviewed and approve engineering time schedule and execution plan provided by engineering consultant.• Accomplished Project material procurement with 20% less than budget.• Supervised and led passing valves' stripping, repair and re-testing activities in workshop.• Participated in preparation and review of construction, pre-commissioning and commissioning procedures during the execution phase.• Led RCA team to determine the root cause analysis for valve passing.• Participated in preparation and review of construction, pre-commissioning and commissioning procedures during the execution phase.• Participated in technical bid evaluations.• Followed up procurement activities to make sure that material shall be delivered as per the approved plan.• Participated in weekly and monthly progress reports Preparation.• Kept records of project deliverables and their approval from client.• Kept track of project milestones and project financial in order to make sure that project cash flow is balanced.• Provided construction support and site queries clarification through engineering consultant.• Prepared Variation to contract and its calculations with supporting documents.• Kept record of MOM, project variations and deviations and follow-up approvals from client.• Kept track and follow punch list actions closeout and their approval from client.• Completed final project handover during the closing phase. Show less
-
-
Senior Project Engineer & Deputy Project Manager
-
Nov 2015 - Nov 2016
Project Title: Engineering, Procurement & Construction of Salalah Loopline for OGCClient: Oman Gas Company (OGC)Project Type: EPCProject Duration: 24 MonthsProject Status: CompletedScope of Work was Engineering, Procurement, Construction, Inspection, Testing, Pre-commissioning, Commissioning, handing over and Guarantee run (EPC) of Loopline for approximately 85 km. The Scope also included expansion of existing BVS.s 13, 14 & 15 adding future connections, existing RTU modification and lay 72 Core FOC along with Pipeline route.Key Accomplishments:• Controlled project plan by reviewing design, specifications, and plan and schedule changes; recommending actions.• Determined project specifications, design, customer requirements, and standards.• Participated in project schedule preparation with planning team by studying project plan and specifications; calculating time requirements; sequencing project elements.• Maintained procurement records and material delivery status (including approval status for vendor's documents).• Maintained project records, technical queries / clarifications and variations list.• Completed Engineering and procurement documents handover to client.• Followed up material delivery to site and handover to client / construction team.• Led investigation to identify reasons for Valve's leakage case after project substantial completion.• Supervised and led passing valves' stripping, repair and re-testing activities.• Waived negative variation with value of approximately 10 million USD represented 40% of Contract value claimed by client for not completed scope, after verifying project scope as well as contract terms and successful negotiation with client. Show less
-
-
Project Engineer
-
Apr 2014 - Nov 2015
Project Title: Yibal GGP to Fahud BVS-2 30" Pipeline & Fahud West 12" Loop LineClient: Petroleum Development Oman (PDO)Project Type: Construction Pre-commissioning and CommissioningProject Duration: 15 MonthsProject Status: CompletedProject Title: Kauthar Condensate Pipeline (KCP) Replacement ProjectClient: Petroleum Development Oman (PDO)Project Type: Construction Pre-commissioning and CommissioningProject Duration: 12 MonthsProject Status: CompletedKey Accomplishments:• Reviewed Project Scope of work and clarify for any missing data.• Determined project specifications, design, customer requirements, and standards.• Determined project schedule with planning team by studying project plan and specifications; calculating time requirements; sequencing project elements.• Maintained project schedule by monitoring project progress; coordinating activities; resolving problems.• Controlled project plan by reviewing design, specifications, and plan & schedule changes; recommending actions.• Participate in technical studies.• Controlled and manage major subcontractors and suppliers (Cathodic Protection contractors, FOC / Telecom contractors, Material Suppliers, etc...) that represented 60% of project sub-contractors.• Maintained project records, technical queries/clarifications and variations list.• Prepared project status reports by collecting, analyzing, and summarizing information, as well as recommending actions.• Followed up engineering completion progress and documents/drawings approval with the client's appointed sub-contractor.• Interacted daily with clients to interpret their needs and requirements and represent them in the field.• Provided engineering drawings, documents and technical support for the construction team. Show less
-
-
Pipeline Project Coordinator
-
Feb 2013 - Mar 2014
Project Title: Barik to BVS-8 SOGL Loop Line ProjectClient: Petroleum Development Oman (PDO)Project Type: EPCProject Duration: 16 MonthsProject Status: CompletedKey Accomplishments:• Reviewed Project Scope of work and clarify in case of any missing information.• Released engineering deliverable list to client as per approved time schedule.• Reviewed Engineering documents and drawings submitted by consultant.• Prepared weekly and monthly progress reports.• Accomplished 100% of Engineering activities and issued AFCs on time as per Schedule.• Supported Construction team technically.• Followed up and expedited materials delivery from technically and commercially accepted vendors.• Followed up vendor documents submissions and approval from Client.• Completed materials delivery and handover to client as per approved time schedule.• Completed all materials' documents handover.• Review inspection reports submitted by TPI.• Responsible for getting material certificates approved from client.• Responsible for materials delivery and handover to the client as per the approved time schedule.• Responsible for all materials’ documents handover. Show less
-
-
Pipeline Design Engineer
-
Jul 2010 - Feb 2013
• Prepared pipeline routing designs & piping General Arrangement.• Participated in technical offers preparation for proposals including studying tender documents, MTO and any required calculations drawings related to piping or pipeline activities.• Executed technical evaluation for tender documents.• Reviewed Alignment sheets for pipelines.• Accomplished at least 7 successful projects.
-
-
-
AUTO COOL
-
2nd inudsterial zone 10th of ramadan city, Egypt
-
Production Engineer
-
Dec 2009 - Jul 2010
• Created engineering documentation, including manufacturing processes, equipment specifications and change notices. • Supervised the entire production process and prepared proper documentation for dispatch. • Communicated with other team members to enhance process and performance. • Managed production lines for 6 car brands' A/C production. • Created engineering documentation, including manufacturing processes, equipment specifications and change notices. • Supervised the entire production process and prepared proper documentation for dispatch. • Communicated with other team members to enhance process and performance. • Managed production lines for 6 car brands' A/C production.
-
-
Education
-
Ain Shams University
Bachelor's degree, Faculty of Engineering